Sources Sought Notice – C– Project Number 526-15-113 Renovate ICU
Notice Type: Sources Sought Notice
Posted Date:
Office Address:
Subject: C-- Project Number 526-15-113 Renovate ICU
Classification Code: C - Architect and engineering services
Solicitation Number: VA24217N0908
Contact:
Setaside: Service-Disabled Veteran-Owned Small BusinessService-Disabled Veteran-Owned Small Business
Place of Performance (address):
Place of Performance (zipcode): 10468-3904
Place of Performance Country:
Description:
Bronx
THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT.
The
This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330 and small business size standard of
LOCATION
This Project will design a complete and fully functional ICU at the
SCOPE OF SERVICE REQUIRED
Project Number 526-15-113 Renovate ICU
A/E will supply all labor, materials and services to include but is not limited to Architectural Specifications, electrical, plumbing, mechanical, clinical, structural, Value Engineering, progress phasing scheduling and estimating as well as other design considerations, to design for a complete and fully functional ICU. Design will include but is not limited to the following:
A) Renovate ICU
Completely renovate 8B for ICU ward as per
Waiting room, Bereavement rooms and patient rooms to have comforting, friendly, home environment and television.
Install intercom or similar system in waiting room for staff to communicate with family/visitors from ICU nurses station or reception area.
Install new
New rooms to have system where medical staff can view patients but patients still have their privacy as much as possible. Look into concept of E-glass, black out glass, or similar for privacy. Use of curtains is not preferred.
All patient rooms to have their own bathroom if possible. Patient shower location to be installed in new ward if they cannot fit in each room.
Create isolation rooms equipped with Antiroom, ball and tube indicators, etc. Some rooms already have negative pressure capability. Look into building around this set for new isolation rooms. Design for all ductwork to roof as needed or utilize any existing runs if present. Design for changing out exhaust fans if necessary.
Overall AHU is not being changed. Modify AHU or other equipment if needed to meet HVAC air exchanges and requirements for an ICU.
Look into the possibility of installing a bed pan washer location.
Change all flooring with infectious control ratings. Look into concept of Epoxy or Stonehard floor or equal for patient care areas. Waiting rooms, Bereavement rooms can be a decorative vinyl tile such as wood, etc.
Appealing countertops and space efficient storage cabinets by sinks. Cabinets and storage bins to have locks. Sinks to have sensors or other methods to eliminate touching sink for better infection control.
Nurses stations to have appealing countertops and have all required outlets, IT needs, new Nurse Call monitors, new clinical alarm system and monitoring, new camera observations systems, electronic charting and assignment boards, locations for binders, logs, etc.
Create Slave monitoring system for select staff at their offices for patient monitoring.
Lighting in patients tooms to have dimming capabilities and other lighting methods for better comfort for patients.
Install patient or arjo lifts in all patient rooms.
Linen closets for all patients rooms to be accessed from inside patient rooms and outside corridors. With as much storage space as possible.
Install eye wash stations and water fountains.
All rooms to have new flat screen TVs. Flat screen monitors to be furnished by
Provide all necessary connections for the TVs to properly function. Show all electrics, cable TV, nurse call wiring hook up configurations as necessary for new flat screen monitors to fully function.
Each patient room to be have booms equipped with medical gas connections, outlets, all other required utilities. Booms to have exterior cover that is not prone to deterioration or rusting. Booms to be maintenance friendly for housekeeping to easily maintain.
Each room to have dialysis connections made of new durable materials that can easily connect to portable dialysis machines without breaking.
Create small storage room for portable dialysis machines and a separate room for pumps and other equipment.
Create 4 new emergency panels to match the set up at 8C and tap into existing incoming service from life safety generator at 8A electric closet to 8B to power emergency loads throughout unit. Existing ICU not be disconnected from generator. Design for method to see no or minimal downtime at existing ward 8C when final terminations are made.
Utilize critical, life safety and essential equipment panels in 8B electrical closet.
Modify and/or renovate PA speaker system in 8B as needed.
Try to make separate entrances to IT closet and electric closet if possible.
Include all new IT wiring, CAT 5,wall connections, patch panels, racks, phone termination blocks, plywood support backings, cable management systems, fiber optic connections, etc. Final terminations in closet to be done by in-house IT department.
Install new decorative handrails throughout space. Install decorative ICU entrance for entire ICU and waiting room..
Design for defibrillator crash cart spaces, med carts, gas canisters, and other equipment by Nurses Stations.
Efficient space for computer bays for nurse use near patient rooms.
Renovate for a new conference room equipped with wall mounted display system. (Utilize present conference room at 8C as an example)
Dedicated room or rooms for SPD supply, specialty items, IV supply, Medication, and supplies
Make some rooms able to handle the specific temperature of sensitive supplies with thermostats and temperature alarms.
All supply rooms to be installed with more efficient cabinets, shelving, etc.
Design areas showing all furniture placement for staff and patients rooms. Staff furniture to be purchased by
Renovate at least for 2 bathrooms in main corridor at 8A with
Any bear steel beams found to be fireproofed with spray on fireproofing utilizing Hilti or approved equal.
Correction of life safety deficiencies in space regarding existing junction boxes and conduits that is not supported, open knocks outs, open junction boxes.
All locks to be Stanley best core max system locks. All offices to have storeroom functions. Supply, staff areas to have electric keypad locks with preinstalled electric wiring. Lock system to be small format 7 pin system
Include notes for PPE equipment and
Utility shutdowns to be isolated to area of work only if possible. Medical Center and/or other areas not to be affected if possible. Notes to coordinate with project engineer and in-house trades shops for sprinkler shutdowns, electrical, water, sanitary, HVAC, welding and cutting etc a week prior to shutdowns.
Provide common, path of egress, dead ends, smoke barriers walls, fire ratings, etc drawings for life safety.
Provide infection control drawing as per
B) All design to be done as per
C) Coordinate all construction with Project Engineer prior to start of work.
D) All penetrations made during installation around wiring, conduits, junction boxes, pull boxes, pipes, etc must be sealed with Fire Sealant Caulking and/or materials. Hilti fire sealant is hospital standard.
E) Provide patchwork, paint, replacement of ceiling tiles, etc to any area destroyed during construction. All materials must match existing type.
F) Any drawings provided by the Government are for reference only and it is the responsibility of the contractor to field verifies all drawings, installation methods and dimensions for accuracy.
G) Must clean construction site on a daily basis.
H) Contractor is to furnish all warranties, operation and service manuals for the job and new equipment prior to final payment. All warranties begin when approved and accepted by Bronx VA.
I) Contractor is responsible for securing the construction site, while maintaining the integrity of the Medical Center security.
J) Contractor must comply with all necessary
COST RANGE
TYPE OF CONTRACT CONTEMPLATED
The
ESTIMATED START AND COMPLETION DATES
The
Deliver Conceptual and Preliminary Documents Schematic Review material to Contracting Officer not later than____ 60 Days After Award.
Review Conceptual and Preliminary Documents Schematic Material with Contracting Officer on ___________ 100 Days After Ward.
Deliver 35% Schematic Review material to Contracting Officer not later than_130 Days After Award.
Review 35% Schematic Material with Contracting Officer on_ 160 Days After Ward.
Deliver 65% Design Review material to Contracting Officer not later than 200 Days After Award
Review 65% Design Material with Contracting Officer on __ 240 Days After Award
Deliver 95% Design Review material to Contracting Officer not later than_270 Days After Award
Review 95% Design Material with Contracting Officer on ___ 300 Days After Award
Deliver 100% Final Review material to Contracting Officer not later than 330 Days After Award
Review 100% Final Material with Contracting Officer on ___ 345 Days After Award
The A/E shall perform the work required within the limits of the following schedule. Professional architects, engineers and related design disciplines familiar with the work shall be provided, as directed by the Contracting Officer, to attend the
Construction:
Number of calendar days to complete construction is to be determined by the AE firm after the design is complete.
SELECTION CRITERIA
The
Selection Criteria
Weighting
Professional qualifications and disciplines of staff proposed for the satisfactory performance of required services.
10%
Examples of specialized experience and technical competence in various disciplines required for specific project.
20%
Capacity to Accomplish the work in the required time
10%
Past experience and performance on government contracts.
10%
Proximity of firm or working office providing professional services to the facility.
10%
Reputation and standing of the firm and its principal officials with respect to professional performance, General Management, and cooperativeness.
10%
Record of significant claims against the firm because of improper or incomplete architectural and engineering services.
5%
Specific Experience and Qualifications of personnel proposed assignment to the project and their record of working together as a team.
25%
Total
100%
SELECTION CRITERIA DESCRIPTIONS
The selection criteria descriptions are provided below.
PROFESSIONAL QUALIFICATIONS NECESSARY FOR SATISFACTORY PERFORMANCE OF REQUIRED SERVICES.
Provide brief resumes of proposed team members who will specifically serve as the Project Managers and Designers of Record. The Designers of Record shall perform and direct the design within their respective discipline and shall sign and seal the drawings. All Designers of Record must be professionally registered in their discipline. Each resume shall include a minimum of two (2) specific completed projects that best illustrate the individual team members experience relevant to this contract scope;
SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE
Specialized experience and technical competence required for this specific project, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials.
CAPACITY
This factor evaluates the ability of the firm, given their current projected workload and the availability of their key personnel, to accomplish the possible myriad of design projects in the required time.
The general workload and staffing capacity of the design office will be evaluated.
List current projects with a design fee of greater than
Indicate the firms present workload and the availability
of the project team (including sub-consultants) for the specified contract performance period;
Describe experience in successfully delivering projects per
performance schedule, providing timely construction support, and successfully completing multiple projects with similar delivery dates
PAST PERFORMANCE:
VISN2 will evaluate past performance on recent and relevant contracts with government agencies (emphasis on
Recent is defined as performance occurring within 5 years of the date of this Sources Sought, except that ongoing projects must have begun no less than one (1) year prior to the issuance of this Sources Sought.
Relevancy is defined as performance of work on projects that are similar in scope to the types of projects anticipated under the resultant contracts.
Respondents with no previous past performance shall state this when addressing the selection criteria. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation.
Submission Requirements:
Submit a minimal of three (3) references; any of the following evaluations are acceptable:
A-E Contractor Appraisal Support System (ACASS),
Contractor Performance Assessment Report System (CPARS), or
Past Performance Questionnaire (PPQ) evaluation for each project submitted under Criterion 2.
If a completed CPARS evaluation is available, it shall be submitted with the completed SF330 package. If there is not a completed ACASS/CPARS evaluation, the PPQ included with this notice is provided for the Offeror or its team members to submit for each project included in criterion (2). If a PPQ is submitted, but an official ACASS/CPARS evaluation is found for that project in government databases, the official evaluation will take precedence. If an ACASS/CPARS evaluation is not available, ensure correct phone numbers and email addresses are provided for each contract customer/reference. Completed PPQs should be submitted with your SF330. If the A-E is unable to obtain a completed PPQ from a contract customer/reference for a project before the response date set forth in this notice, the A-E should complete and submit with their response the first page of the PPQ (Attachment #1), including contract and point of contact information for the respective projects.
A-Es should follow-up with references to ensure timely submittal of questionnaires. At the reference s request, questionnaires may be submitted directly to the Richard Adu via email at [email protected] prior to the response date. A-Es shall not incorporate by references into their response ACASS/CPARS or PPQ evaluations previously submitted in response to other A-E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Submitted ACASS/CPARS and PPQ evaluations will not be counted as part of the 30 page limitation and shall be attached to the SF330, behind the SF330 Part II document.
LOCATION
an evaluation criteria.
v. This distance is determined according to http://maps.google.com/
vi. This factor evaluates the distance the AE firm's design office or offices lies from the
location of work. Please provide the address (es) and distance of your closest office to
the address listed below.
ACCEPTABILITY UNDER OTHER APPROPRIATE EVALUATION CRITERIA.
LIMITATIONS
VA NOTICE OF TOTAL SERVICE DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (
SUBMISSION REQUIREMENTS
Qualified Service Disabled Veteran Owned Small Business firms are required to submit Three (3) hard copies of the SF 330 (which can be downloaded from (www.gsa.gov/forms) and Two (2) Compact Disc (CD) which contains digital copies of the SF 330. All packages shall be submitted no later than
The submission must include an insert detailing the following information:
1. Dun & Bradstreet Number;
2. Tax ID Number;
3. The e-mail address and phone number of the
4. A copy of the firms CVE verification as a Veteran Owned Small Business.
The Contracting Officer is not responsible for not receiving submissions due to the offeror misaddressing the package or illegibility of the information. NOTE: Any request for assistance with submission or other procedural matters shall be submitted via email only to [email protected]; telephone inquiries will not be honored.
THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT.
Link/URL: https://www.fbo.gov/spg/VA/BroVANAP/VAMD/VA24217N0908/listing.html



Attorney General Jackley Joins Settlement With Nationwide Insurance Over Data Breach
Iowa Stopgap Measure Economic and Actuarial Analysis Released
Advisor News
- What advisors and clients must know about Roth conversions
- Worker retirement confidence dips to lowest level in a decade
- What’s behind private equity investment in insurance brokerages
- Advisors get a win as NJ Senate passes independent contractor bill
- Why federal retirement benefits are more complex than advisors realize
More Advisor NewsAnnuity News
- Why annuities are gaining traction with younger investors
- Best’s Special Report: U.S. Life/Annuity Industry Sees Bottom-Line Growth Despite 18% Decline in Total Income in First-Quarter 2026
- Globe Life Inc. (NYSE: GL) Records 52-Week High Thursday Morning
- Fortitude Re Completes $500 Million FABN Issuance
- Reframing retirement income for greater certainty
More Annuity NewsHealth/Employee Benefits News
- ATTORNEY GENERAL JAMES ISSUES GUIDANCE TO NEW YORKERS FACING HEALTH INSURANCE CHANGES
- Findings from Brown University Provides New Data on Managed Care (Low-Value Care Following Hospital and Private Equity Acquisition in Primary Care): Managed Care
- Reports from University of Chicago Medicine Advance Knowledge in HIV/AIDS (A Community Located Insurance Navigation Intervention to Link Sexual and Gender Minorities in Status Neutral Care: Results From the Navigating Insurance Coverage …): Immune System Diseases and Conditions – HIV/AIDS
- New Insurance Findings from Johns Hopkins University Outlined (Medicare coverage choice is not neutral: how policy design shapes beneficiary enrollment): Insurance
- Collinsville man, St. Louis woman charged in Illinois health fraud case
More Health/Employee Benefits NewsLife Insurance News
- Researchers from Georgia Institute of Technology Report on Findings in Insurance (Black Life Insurance Companies, Mortgages, and African American Homeownership Before 1964): Insurance
- How much money do Connecticut residents need to retire comfortably?
- Earl Dudley Jr. to Become Chief Human Resources Officer at Mutual of Omaha
- How accelerated underwriting is transforming life insurance
- OVER $107 MILLION IN LIFE INSURANCE BENEFITS LOCATED FOR TENNESSEANS IN 2025 THROUGH NAIC'S LIFE INSURANCE POLICY LOCATOR SERVICE
More Life Insurance News