National Environmental Policy Act Regulations
Final rule.
CFR Part: "1 CFR Part 601"
Citation: "82 FR 45421"
Page Number: "45421"
"Rules and Regulations"
SUMMARY: The
DATES: This rule is effective
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
I. Summary of Changes
A. Background
NCPC's 2004 Policies were adopted in 2004 (69 FR 41299,
B. Elimination of Section 106 Procedures
One of the most significant changes reflected in the new rule is the elimination of procedures for complying with Section 106 of the National Historic Preservation Act (NHPA). In 2004, when it adopted the 2004 Policies, NCPC opted to issue combined NEPA and NHPA guidance to ensure coordinated implementation of both procedures. However, regulations promulgated by the
C. Federal and Non-Federal Agencies
To clarify roles and responsibilities, these Regulations distinguish between
D. Timing and Sequencing of Submission of NEPA Documents
These Regulations also alter the timing and sequencing of an applicant's submission of NEPA documentation for applications governed by the National Capital Planning Act and the Commemorative Works Act. Under the 2004 Policies, an applicant was required to complete the NEPA process at the time of preliminary review. Under this rule, an applicant must complete its NEPA process at the time of final review. This revised approach allows the Commission an opportunity to provide input on a project when it is still in the developmental phase. It also provides a NEPA sequencing consistent with
E. Categorical Exclusions
NCPC's rule also includes changes to the list of projects eligible for application of a Categorical Exclusion (CATEX). The Regulations include several new CATEXs. NCPC eliminated several existing CATEXs because they were based on old, antiquated authorities which have little to no relationship to NCPC's present day review roles. The rule also increase the number of extraordinary circumstances which negate the application of a CATEX.
II. Summary of and Response to Comments
A. General
NCPC published a Proposed Rule (82 FR 42570,
NCPC received a little under 100 comments on its proposed NEPA rule Regulations. Comments were submitted by the
The major comments can be grouped into six categories: (1) The elimination of detailed reference to compliance with Section 106 of the NHPA; (2) the treatment of Non-Federal Agencies in the Regulations; (3) the timing and sequencing of submitting NEPA Documents/Co-Signing a Finding of No Significant Impact (FONSI) or a Record of Decision (ROD); (4) NCPC's reliance on the CATEX of other government agencies; and (5) the minimal focus on public participation in the NEPA process/lack of public knowledge of process for administering CATEXs.
B. Revised
NCPC decided to rename its NEPA requirements the National Environmental Policy Act Regulations (Regulations). This title is more descriptive of the true nature of the Regulations versus the title of Environmental Policies and Procedures conferred on the 2004 Policies.
C. Elimination of NHPA Section 106 Requirements
Several comments addressed the elimination of NHPA Section 106 procedures from the Regulations.
D. Role of Non-Federal Agencies
The role of Non-Federal Agencies in the NEPA process generated a number of comments. The
One member of the public challenged the legality of designating Non-Federal Agencies as "Cooperating Agencies" given that the CEQ regulatory definition only designates "federal agencies" as capable of serving in this capacity. NCPC notes this statement is only partially correct. The definition of
NCPC also agrees with the same individual's multiple comments that NCPC does not undertake NEPA "on behalf" of Non-Federal Agencies. NCPC recognizes that the NEPA obligation for a
Turning to an alternative approach for NEPA compliance for
NCPC will enter into a Memorandum of Agreement (MOA) (renamed from a Memorandum of Understanding or MOU in the proposed rule) with Non-Federal Agencies. The MOA will specify, among others, the information the
NCPC notes that in a follow-up conversation with the commenter to explore the rationale for opposing an MOA, the commenter agreed the MOA approach as outlined above is legally sufficient. NCPC conducted the follow-up conversation after the comment period closed, and no new comments were discussed during the conversation.
E. Timing and Sequencing of Submitting NEPA Documents/Co-Signing FONSIs and RODs
All the government agencies supported NCPC's process change of moving NEPA completion to coincide with the Commission's final approval. There was one concern expressed about the sequencing of NEPA and the Commemorative Works Act's review process, but NCPC believes the comment was the result of a misunderstanding of the process.
Multiple Federal Agencies also advised against incorporation of a provision allowing NCPC to co-sign another agency's FONSI or ROD. NCPC notes that the Regulations render this practice discretionary. However, if both agencies agree on the contents of a FONSI or ROD, it makes no sense for NCPC to prepare a duplicated document for NCPC to sign. Obviously, if the two agencies have different reasons for reaching a FONSI or a ROD, co-signature is not an option, and each agency will have to prepare its own document. Co-signature is also not an option if there is disagreement over the ability to reach a FONSI or ROD. This disagreement points to problems with the Environmental Document that must be resolved before the project can be presented to the Commission. Finally, NCPC reminds Federal Agencies that co-signing a FONSI or ROD is entirely consistent with the Administration's efforts to streamline regulatory processes especially NEPA.
F. Use of
The inclusion of five Categorical Exclusions that allowed NCPC to use the exclusion of another agency when it had no corresponding CATEX generated a number of comments pro and con. Federal Agencies supported the concept because it removed the possible need for them to prepare an EA if they used a Categorical Exclusions for their project but NCPC had no exclusion it could apply.
As required, NCPC submitted an administrative record to CEQ for all of its proposed CATEX, most of which are carry-overs from several iterations of prior regulations. The administrative record noted that the five CATEXs predicated upon use of another agency's exclusion had not been enlarged in scope and the CATEX continued to be appropriately limited by extraordinary circumstances, the number of which has been significantly increased in the Regulations.
NCPC's Administrative Record for the five CATEXs at issue was initially accepted, but upon further reflection CEQ has decided to adhere to its long standing policy to disallow such an approach. Consequently, NCPC has removed all five of the CATEXs at issue. Since four of the five CATEX at issue have been put to little use for a prolonged period of time, NCPC does not believe its implementation of NEPA will be unduly burdened by this removal. The addition of new CATEX may also fill the gap.
G. Public Participation/Public Knowledge of Process for Administering CATEX
The Committee of 100 on the Federal City commented on the silence of the proposed regulation on the goals, criteria and process for meaningful public participation. They encouraged the incorporation of meaningful public participation policy and goals to rectify this deficiency.
NCPC is fully committed to open government and transparency and believes its past actions amply substantiate this commitment not only in the NEPA and Section 106 processes but to all of its significant planning activities. Accordingly, the Regulations clearly articulate a policy of using the NEPA process to ". . . foster meaningful public involvement in NCPC's decisions." Moreover, throughout the Regulations, there are repeated opportunities for public participation to include in the EIS scoping process with an option for NCPC to conduct a public scoping process for Environmental Assessments as well; in the review of draft Environmental Assessments (EAs) (at NCPC's option) and Environmental Impact Statements (EISs); and in the review of FONSIs and RODs. Moreover, at the suggestion of another commenter, documents required to be published in the
The Committee of 100 on the Federal City also expressed concern about the Regulation's silence on the administrative process for the application of a CATEX. NCPC notes that among the Commission's official delegations is one conferring administrative responsibility for NEPA on the Executive Director. In the future, owing to the recent redesign of NCPC's Web site, the delegations will be listed on the Web site. However, NCPC notes this responsibility, how and when it is made, and how the public is notified of the decision is set forth in SUBSEC 601.11(c) and 601.12(b) of the Regulations.
H. CEQ Comments
As required by CEQ Regulations, NCPC submitted a draft of this final rule to CEQ for its review and approval following revisions to the Regulations to reflect comments received during the public comment period. CEQ responded with a number of recommendations. Most of the recommendations were minor in nature and involved language clarifications, addition of cross-references to relevant sections of CEQ's regulations, and inclusion of additional language.
The one recommendation falling outside the minor category related to the timing of the signing FONSIs and RODs by
In response to CEQ's comment, the rule requires NCPC to sign its decision documents following Commission final approval of an application. As to Federal Agencies, the rule is silent as to when the
Following incorporation of all of CEQ's recommended changes into the regulations, NCPC received final CEQ sign off on
III. Compliance With Laws and Executive Orders
Executive Orders 12866 and 13563
By Memorandum dated
Executive Order 13771
NCPC is exempt from this Executive Order because it is exempt from E.O. 12866, NCPC confirmed this fact with OIRA.
Regulatory Flexibility Act
As required by the Regulatory Flexibility Act (5 U.S.C.
Small Business Regulatory Enforcement Fairness Act
This is not a major rule under 5 U.S.C. 804(2), the Small Business Regulatory Enforcement Fairness Act. It does not have an annual effect on the economy of
Unfunded Mandates Reform Act (2 U.S.C.
A statement regarding the Unfunded Mandates Reform Act is not required. The rule neither imposes an unfunded mandate of more than
Federalism (Executive Order 13132)
In accordance with Executive Order 13132, the rule does not have sufficient federalism implications to warrant the preparation of a Federalism Assessment. The rule does not substantially and directly affect the relationship between the Federal and state governments.
Civil Justice Reform (Executive Order 12988)
The General Counsel of NCPC has determined that the rule does not unduly burden the judicial system and meets the requirements of Executive Order 12988 3(a) and 3(b)(2).
Paperwork Reduction Act
The rule does not contain information collection requirements, and it does not require a submission to the
National Environmental Policy Act
The rule is of an administrative nature, and its adoption does not constitute a major Federal action significantly affecting the quality of the human environment. NCPC's adoption of the rule will have minimal or no effect on the environment; impose no significant change to existing environmental conditions; and will have no cumulative environmental impacts.
Clarity of the Regulation
Executive Order 12866, Executive Order 12988, and the Presidential Memorandum of
Public Availability of Comments
Be advised that personal information such as name, address, phone number electronic address, or other identifying personal information contained in a comment may be made publically available. Individuals may ask NCPC to withhold the personal information in their comment, but there is no guarantee the agency can do so.
List of Subjects in 1 CFR Part 601
Environmental impact statements, Environmental protection.
For the reasons stated in the preamble, the
PART 601--IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT
Subpart A--General
Sec.
601.1 Purpose.
601.2 Policies.
601.3 Definitions.
Subpart B--Lead and Cooperating Agencies
601.4 Designation of
601.5
601.6 Resolving disputes over
601.7 Cooperating Agencies.
Subpart C--NEPA Submission Schedules
601.8 NEPA submission schedule for applications governed by the National Capital Planning Act.
601.9 NEPA submission schedule for applications governed by the Commemorative Works Act.
Subpart D--Initiating the NEPA Process
601.10 Characteristics of Commission actions eligible for a Categorical Exclusion.
601.11 Extraordinary Circumstances.
601.12 National Capital Planning Commission Categorical Exclusions.
Subpart E--Environmental Assessments
601.13 Characteristics of Commission actions eligible for an Environmental Assessment.
601.14 Commission actions generally eligible for an Environmental Assessment.
601.15 Process for preparing an Environmental Assessment.
601.16 Finding of No Significant Impact.
601.17 Supplemental Environmental Assessments.
Subpart F--Environmental Impact Statements
601.18 Requirement for and timing of an Environmental Impact Statement.
601.19 Context, intensity, and significance of impacts.
601.20 Streamlining Environmental Impact Statements.
601.21 Programmatic Environmental Impact Statements and tiering.
601.22 Contents of an Environmental Impact Statement.
601.23 The Environmental Impact Statement process.
601.24 Final Environmental Impact Statement.
601.25 Record of Decision.
601.26 Supplemental Environmental Impact Statement.
601.27 Legislative Environmental Impact Statement.
Subpart G--Dispute Resolution
601.28 Dispute resolution.
601.29 [Reserved]
Authority: 40 CFR 1507.3.
Subpart A--General
This part establishes rules that supplement the
(a) Compliance with NEPA, as amended (42 U.S.C. 4321 et seq.) and CEQ regulations for implementing the procedural provisions of NEPA (40 CFR parts 1501 through 1508).
(b) Compliance with other laws, regulations, and Executive Orders identified by NCPC as applicable to a particular application.
Consistent with 40 CFR 1500.1 and 1500.2, it shall be the policy of the NCPC to:
(a) Comply with the procedures and policies of NEPA and other related laws, regulations, and orders applicable to Commission actions.
(b) Provide applicants sufficient guidance to ensure plans and projects comply with the rules of this part and other laws, regulations, and orders applicable to Commission actions.
(c) Integrate NEPA into its decision-making process at the earliest possible stage.
(d) Integrate the requirements of NEPA and other planning and environmental reviews required by law including, without limitation, the National Historic Preservation Act, 54 U.S.C. 306108 (NHPA), to ensure all such procedures run concurrently.
(e) Use the NEPA process to identify and assess the reasonable alternatives to proposed actions that will avoid or minimize adverse effects on the quality of the human environment in the
(f) Use all practicable means to protect, restore, and enhance the quality of the human environment including the built and socioeconomic environments and historic properties within the
(g) Streamline the NEPA process and Environmental Impact Statements (EIS) to the maximum extent possible.
(h) Use the NEPA process to assure orderly and effective NCPC decision-making and to foster meaningful public involvement in NCPC's decisions.
For purposes of this part, the following definitions shall apply:
Administrative Record means a compilation of all materials (written and electronic) that were before the agency at the time it made its final decision. An Administrative Record documents an agency's decision-making process and the basis for the decision.
Categorical Exclusion or CATEX means, as defined by 40 CFR 1508.4, a category of actions which do not individually or cumulatively have a significant effect on the human environment except under Extraordinary Circumstances and which have been found to have no such effect in procedures adopted by a
Central Area means the geographic area in the
Chairman means the Chairman of the
Commemorative Works Act or CWA means the Federal law codified at 40 U.S.C. 8901 et seq. that sets forth the requirements for the location and development of new memorials and monuments on land under the jurisdiction of the
Commission means the
Comprehensive Plan means The Comprehensive Plan for the
Cooperating Agency means, as defined in 40 CFR 1508.5, any
Cumulative impact means, as defined in 40 CFR 1508.7, the impact on the environment that results from the incremental impact of an action when added to other past, present, and reasonably foreseeable future actions regardless of what agency (Federal or Non-Federal) or person undertakes such other actions. Cumulative impacts can result from individually minor, but collectively significant, actions taking place over a period of time.
Emergency Circumstances means a sudden and serious occurrence or situation requiring immediate attention to protect the lives and safety of the public and protect property and ecological resources and functions from imminent harm.
Environmental Assessment or EA means, as defined in 40 CFR 1508.9, a concise document for which a
Environmental Document means, as set forth in 40 CFR 1508.10, an Environmental Assessment, and Environmental Impact Statement, and for purposes of these regulations, a Categorical Exclusion determination.
Environmental Impact Statement or EIS means, as defined in 40 CFR 1508.11, a detailed written statement as required by 42 U.S.C. 4332(2)(C).
Environs means the territory surrounding the
Executive Director means the Executive Director employed by the
Executive Director's Recommendation or EDR means a concise written report and recommendation prepared by NCPC staff under the direction of NCPC's Executive Director regarding a proposed action that is transmitted to the Commission for its consideration.
Extraordinary Circumstances means special circumstances that when present negate an agency's ability to categorically exclude a project and require an agency to undertake further NEPA review.
Federal Agency means the executive agencies of the Federal government as defined in 5 U.S.C. 105.
Finding of No Significant Impact or FONSI means, as defined at 40 CFR 1508.13, a document prepared by NCPC or a
Lead Agency means, as defined in 40 CFR 1508.16, the agency or agencies preparing or having primary responsibility for preparing an EA or an EIS.
Memorandum of Agreement or MOA means for purposes of implementing the regulations in this part, a written agreement entered into between a
Mitigation means, as defined in 40 CFR 1508.20, avoiding an impact altogether by not taking a certain action or parts of an action; minimizing impacts by limiting the degree or magnitude of the action and its implementation; rectifying the impact by repairing, rehabilitating, or restoring the affected environment; reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action; and compensating for the impact by replacing or providing substitute resources or environments.
Monumental Core means the general area encompassed by the
National Capital Planning Act means the
National Capital Region means, as defined in 40 U.S.C. 8702(2), the
Non-Federal Agency for purposes of the National Environmental Policy Act and the regulations in this part means those applicants outside the definition of
Notice of Availability or NOA means a public notice or other means of public communication that announces the availability of an EA or an EIS for public review.
Notice of Intent or NOI means, as defined in 40 CFR 1508.22, a notice published in the
Purpose and need as described in 40 CFR 1502.13 means the underlying purpose and need for agency action to which the agency is responding in proposing the alternatives including the proposed action.
Programmatic NEPA Review means a broad or high level NEPA review that assesses the environmental impacts of proposed policies, plans or programs, or projects for which subsequent project or site-specific NEPA analysis will be conducted. A Programmatic NEPA Review utilizes a tiering approach.
Record of Decision or ROD means a concise public record of an agency's decision in cases requiring an EIS that is prepared in accordance with 40 CFR 1505.2.
Scope means, as defined in 40 U.S.C. 1508.25, the range of actions (connected, cumulative and similar); alternatives (no action, other reasonable courses of action; and Mitigation measures not included in the proposed action); and impacts (direct, indirect and cumulative) considered in an EIS or an EA. The process of defining and determining the scope of issues to be addressed in an EIS or EA with public involvement shall be referred to as Public Scoping. Internal scoping activities shall be referred to by the word scoping without capitalization.
Submission Guidelines means the formally-adopted document which describes the application process and application requirements for projects requiring review by the Commission.
Tiering means, as defined in 40 CFR 1508.28, an approach where
Subpart B--Lead and Cooperating Agencies
(a) A
(1) An application that requires Commission approval; and
(2) An application for action on a master plan that includes future projects that require Commission approval; provided that:
(i) The applicant intends to submit individual projects covered by the master plan to the Commission within five years of the date of Commission action on the master plan; and
(ii) The applicant intends to use the master plan EA or EIS to satisfy its NEPA obligation for specific projects referenced in the master plan.
(b) NCPC shall serve as
(1) An application submitted by a
(2) An application submitted by a
(i)
(ii)
(3) An application for approval of land acquisitions undertaken pursuant to 40 U.S.C. 8731-8732.
(a) The obligations of a
(1) Act as
(2) Integrate other environmental reviews and other applicable regulatory requirements to include, without limitation, Section 106 of the NHPA.
(3) Allow NCPC, to participate as a Co-lead or
(4) Invite affected Federal, state, regional and local agencies to participate as a
(5) Consult with the affected agencies as early as possible in the planning process to obtain guidance on the goals, objectives, standards, purpose, need, and alternatives for the NEPA analysis.
(6) Work with Cooperating Agencies and stakeholders in the following manner:
(i) Keep them informed on the project schedule and substantive matters; and
(ii) Allow them an opportunity to review and comment within reasonable time frames on, without limitation, Public Scoping notices; technical reports; public materials (including responses to comments received from the public); potential Mitigation measures; the draft EA or EIS; and the draft FONSI or ROD.
(7) Prepare the appropriate Environmental Document consistent with the applicant's NEPA regulations, the requirements of this part, and CEQ regulations. If the
(8) Determine in its Environmental Document whether an action will have an adverse environmental impact or would limit the choice of reasonable alternatives under 40 CFR 1505.1(e) and take appropriate action to ensure that the objectives and procedures of NEPA are achieved.
(9) Prepare, make available for public review, and issue a FONSI or ROD.
(10) Ensure that the draft and final EIS comply with the requirements of 40 CFR 1506.5(c) and include a disclosure statement executed by any contractor (or subcontractor) under contract to prepare the EIS document and that the disclosure appears as an appendix to the EIS.
(11) Compile, maintain, and produce the Administrative Record.
(12) Provide periodic reports on implementation of Mitigation measures to NCPC and other Cooperating Parties consistent with a schedule established in the Environmental Document. All such reports shall be posted on NCPC's Web site.
(13) For an application that has yet to obtain final Commission approval, re-evaluate and update Environmental Documents that are five or more years old as measured from the time of their adoption when either or both of the following criteria apply:
(i) There are substantial changes to the proposed action that are relevant to environmental concerns.
(ii) There are significant new circumstances or information that are relevant to environmental concerns and have a bearing on the proposed action or its impacts.
(14) Consult with NCPC on the outcome of the re-evaluation of its Environmental Document; provided that if NCPC disagrees with the
(b) When NCPC serves as
(1)
(2) The MOA may be prepared as a programmatic MOA that addresses a uniform approach for the treatment of all applications from a particular
(3) A MOA with a
(4) Upon adoption of the MOA, NCPC shall publish the MOA in the
(a) In the event of a dispute with a
(b) If internal resolution at higher agency levels proves unsuccessful, at NCPC's sole discretion, one of the following actions shall be pursued: The parties shall request CEQ's determination on which agency shall serve as Lead, or NCPC shall prepare its own Environmental Document, or NCPC shall decline to take action on the underlying application.
(c) Disputes other than those relating to the designation of
(a) When a
(1) Act as a
(2) Assist in the preparation of and sign a MOA with terms agreeable to NCPC if requested by the
(3) Participate in the NEPA process by providing comprehensive, timely reviews of and comments on key NEPA materials including, without limitation, Public Scoping notices; technical reports; documents (including responses to comments received from the public); the draft and final EA or EIS; and the Draft FONSI or ROD.
(4) Supply available data, assessments, and other information that may be helpful in the preparation of the Environmental Document or the Administrative Record in a timely manner.
(5) Make an independent evaluation of the
(6) Prepare and, following Commission final approval of an application, sign a FONSI or ROD. Alternatively, if NCPC concurs with the contents of a
(7) Provide documentation requested and needed by the
(b) In the event a
Subpart C--NEPA Submission Schedules
(a) NEPA compliance requirements.
(1) Projects requiring Commission approval; and
(2) Master plans requiring Commission action with future projects requiring subsequent Commission approval; provided that:
(i) The applicant intends to submit individual projects depicted in the master plan to the Commission within five years of the date of Commission action on the master plan; and
(ii) The applicant intends to use the master plan EA or EIS to satisfy its NEPA obligation for specific projects referenced in the master plan.
(b) Timing of NEPA compliance. When
(c) Concept review. The NEPA Public Scoping process shall have been initiated by the
(d) Preliminary review. A Draft Environmental Document shall be issued or published before the applicant submits an application for preliminary review. The NEPA information shall be provided to the Commission to facilitate the Commission's preliminary review and the provision of meaningful Commission comments and direction.
(e) Final review. (1) At the time a
(2) If at the time of final review, the Commission denies a
(f) Deviations from the submission schedule for Emergency Circumstances. (1) This paragraph (f) applies when the following three conditions exist: NCPC is the
(2) When the three conditions described above exist, NCPC shall undertake one of the following actions:
(i) When Emergency Circumstances render it necessary to take an action that requires an EA, the Executive Director shall prepare a concise, focused EA consistent with CEQ guidance. At the earliest opportunity, the Commission shall grant approval for the EA.
(ii) Where Emergency Circumstances make it necessary for the Commission to take an action with significant environmental impact without observing the provisions of these regulations, NCPC shall consult with CEQ about alternative arrangements. NCPC will limit such arrangements to actions necessary to control the immediate impacts of the emergency. Other actions remain subject to NEPA review.
(a) Timing of NEPA compliance. When, pursuant to the Commemorative Works Act, the
(b) Concept site review. (1) The NEPA Scoping Process shall have been initiated by NPS or GSA before the appropriate agency submits an application to the Commission for concept site review. Available NEPA documentation for all concept sites shall be included in the application to facilitate effective Commission concept review.
(2) The Commission shall provide comments to NPS or GSA on the multiple sites to assist the applicant in selecting a preferred site.
(c) Concept design review for preferred sites. (1) The NEPA Public Scoping Process shall have been initiated before NPS or GSA submits an application to the Commission for concept design review. Available NEPA documentation shall be included in the application to facilitate effective Commission concept review.
(2) The Commission shall provide comments to NPS or GSA on the preferred site(s) and the concept designs for each site to facilitate selection of a preferred site and refinement of the memorial design for that site. The Commission may establish guidelines for the applicant to follow in preparing its preliminary and final commemorative work design to avoid, minimize or mitigate environmental impacts including adverse effects on historic properties. If the Commission imposes guidelines to avoid, minimize or mitigate adverse impacts, the applicant shall address the guidelines in its Environmental Document.
(d) Preliminary site and design review. (1) NPS or GSA shall have issued or published its Draft Environmental Document for the site selection process and the memorial design and shall have initiated the requisite public comment period before the applicant submits an application for preliminary site and design approval. The NEPA information shall be provided to the Commission to facilitate the Commission's preliminary review and the provision of meaningful Commission comments and directions.
(2) The Commission shall take an action on the preliminary site and design and provide comments to the applicant on the preliminary design to assist the applicant's preparation of a final design.
(e) Final site and design review. (1) At the time NPS or GSA submits an application to the Commission for final site and design review, the determination (FONSI or ROD) resulting from the Environmental Document shall be submitted by the applicant in a form consistent with its NEPA regulations. As a
(2) If at the time of final review, the Commission denies the NPS or GSA project and requests changes thereto, the applicant shall proceed in a manner consistent with applicable law.
Subpart D--Initiating the NEPA Process
(a) A Categorical Exclusion is a type of action that does not individually or cumulatively have a significant effect on the human environment and which has been found to have no such effect by NCPC.
(b) Actions that generally qualify for application of a Categorical Exclusion and do not require either an EA or an EIS exhibit the following characteristics:
(1) Minimal or no effect on the human environment;
(2) No significant change to existing environmental conditions;
(3) No significant cumulative environmental impacts; and
(4) Similarity to actions previously assessed in an EA concluding in a FONSI and monitored to confirm the FONSI.
(a) Before applying a CATEX listed in
(b) Extraordinary Circumstances that negate the application of a CATEX include:
(1) A reasonable likelihood of significant impact on public health or safety.
(2) A reasonable likelihood of significant environmental impacts on sensitive resources unless the impacts have been or will be avoided, minimized, or mitigated to non-significant levels through another process to include, without limitation, Section 106 of the NHPA. Environmentally sensitive resources include without limitation:
(i) Proposed federally listed, threatened or endangered species or their designated critical habitats.
(ii) Properties listed or eligible for listing on the
(iii) Areas having special designation or recognition based on Federal law or an Executive Order, to include without limitation, National Historic Landmarks, floodplains, wetlands, and National Parks.
(iv) Cultural, scientific or historic resources.
(3) A reasonable likelihood of effects on the environment that are risky, highly uncertain, or unique.
(4) A reasonable likelihood of violating an Executive Order, or Federal, state or local law or requirements imposed for the protection of the environment.
(5) A reasonable likelihood of causing a significant increase in surface transportation congestion, disruption of mass transit, and interference with pedestrian and bicycle movements.
(6) A reasonable likelihood of significantly degrading air quality or violating air quality control standards under the Clean Air Act (42 U.S.C. 7401-7671q).
(7) A reasonable likelihood of significantly impacting water quality, public water supply systems, or state or local water quality control standards under the Clean Water Act (33 U.S.C.
(8) A reasonable likelihood of a disproportionately high and adverse effect on low income and minority populations.
(9) A reasonable likelihood of degrading existing unsatisfactory environmental conditions.
(10) A reasonable likelihood of establishing a precedent for future action or making a decision in principle about future actions with potentially significant environmental effects.
(11) Any other circumstance that makes the action sufficiently unique in its potential impacts on the human environment that further environmental analysis and review is appropriate.
(c) The Executive Director shall include in his/her EDR, or the documentation of a delegated action, his/her decision to apply a Categorical Exclusion including consideration of possible Extraordinary Circumstances or not apply a Categorical Exclusion because of Extraordinary Circumstances.
(a) Commission actions that may be categorically excluded and normally do not require either an EA or an EIS are listed in paragraphs (a)(1) through (13) of this section. An action not specifically included in the list is not eligible for a Categorical Exclusion even if it appears to meet the general criteria listed in
(1) Approval of the installation or restoration of onsite primary or secondary electrical distribution systems including minor solar panel arrays.
(2) Approval of the installation or restoration of minor site elements, such as but not limited to identification signs, sidewalks, patios, fences, curbs, retaining walls, landscaping, and trail or stream improvements. Additional features include water distribution lines and sewer lines which involve work that is essentially replacement in kind.
(3) Approval of the installation or restoration of minor building elements, such as, but not limited to windows, doors, roofs, building signs, and rooftop equipment and green roofs.
(4) Adoption of a Federal Element of the Comprehensive Plan or amendment thereto or broad based policy or feasibility plans prepared and adopted by the Commission in response to the Comprehensive Plan.
(5) Approval of the installation of communication antennae on Federal buildings and co-location of communication antennae on Federal property consistent with GSA Bulletin FMR D-242, Placement of Commercial Antennas on Federal Property.
(6) Approval of Federal and District government agency proposals for new construction, building expansion, or improvements to existing facilities, when all of the following apply:
(i) The new structure and proposed use are in compliance with local planning and zoning and any applicable
(ii) The site and the scale of construction are consistent with those of existing adjacent or nearby buildings.
(iii) The proposed use will not substantially increase the number of motor vehicles in the vicinity of the facility.
(iv) There is little to no evidence of unresolved resource conflicts or community controversy related to environmental concerns or other environmental issues.
(7) Approval of transfers of jurisdiction pursuant to 40 U.S.C. 8124 that are not anticipated to result in changes in land-use and that have no potential for environmental impact.
(8) Approval of a minor modification to a General Development Plan applicable to lands acquired pursuant to the Capper-Cramton Act, 46 Stat. 482 (1930), as amended, when non-significant environmental impacts are anticipated.
(9) Reorganization of NCPC.
(10) Personnel actions, including, but not limited to, investigations; performance reviews; award of personal service contracts, promotions and awards; reductions in force, reassignments and relocations; and employee supervision and training.
(11) Legal activities including, but not limited to, legal advice and opinions; litigation or other methods of dispute resolution; and procurement of outside legal services.
(12) Procurement of goods and services, transactions, and other types of activities related to the routine and continuing administration, management, maintenance and operations of the Commission or its facilities.
(13) Adoption and issuance of rules, directives, official policies, guidelines, and publications or recommendations of an educational, financial, informational, legal, technical or procedural nature.
(b) The Executive Director shall include in his/her EDR, or the documentation of a delegated action, his/her decision to apply a Categorical Exclusion and the rationale for this decision.
Subpart E--Environmental Assessments
(a) An EA is a concise document with sufficient information and analysis to enable the Executive Director to determine whether to issue a FONSI or prepare an EIS.
(b) Commission actions that generally require an EA exhibit the following characteristics:
(1) Minor but likely insignificant degradation of environmental quality;
(2) Minor but likely insignificant cumulative impact on environmental quality; and
(3) Minor but likely insignificant impact on protected resources.
Commission actions that typically require preparation of an EA include without limitation:
(a) Approval of final plans for Federal public buildings in the
(b) Approval of final plans for
(c) Recommendations to a Federal or
(d) Approval of a final site and design for a commemorative work authorized under the Commemorative Works Act pursuant to 40 U.S.C. 8905.
(e) Approval of transfers of jurisdiction over properties within the
An EA prepared by NCPC as the
(a) The EA shall include, without limitation, a brief discussion of the proposed action; the purpose and need for the proposed action; the environmental impacts of the proposed action; the environmental impacts of the alternatives considered; Mitigation measures, if necessary; and a list of agencies and persons consulted in preparation of the assessment.
(b) The NCPC shall involve to the extent practicable applicants; Federal and
(c) The NCPC, at the sole discretion of the Executive Director, may undertake Public Scoping for an action requiring an EA. The Public Scoping shall generally commence after issuance of a public notice in a media source with widespread circulation and the NCPC Web site of NCPC's intent to prepare an EA. The notice shall include the date, time and location of the Public Scoping meeting.
(d) The NCPC may solicit public review and comment of a Draft EA. The public comment period generally shall be thirty (30) calendar days. The public comment period shall begin when the Executive Director announces the availability of the Draft EA on the NCPC Web site (www.ncpc.gov). The NCPC, at its sole discretion, may decline to circulate a draft EA for non-controversial projects.
(a) If NCPC is the
(b) If NCPC is not the
(c) In certain limited circumstances described in 40 CFR 1501.4(e)(2)(i) and (ii), a FONSI prepared by NCPC shall be available for public review for thirty (30) days before NCPC makes it final determination. NCPC shall also publish all FONSIs on its Web site seven (7) calendar days before the Commission takes action on the underlying application.
(d) If the Commission determines a
(a) The NCPC shall prepare a supplemental EA if five or more years have elapsed since adoption of the EA and:
(1) There are substantial changes to the proposed action that are relevant to environmental concerns; or
(2) There are significant new circumstances or information that are relevant to environmental concerns and have a bearing on the proposed action or its impacts.
(b) The NCPC may supplement a Draft or Final EA at any time to further the purposes of NEPA.
(c) The NCPC shall prepare, circulate, and file a supplement to a Draft or Final EA, and adopt a FONSI in accordance with the requirements of SUBSEC 601.15 and 601.16. If NCPC is not the
Subpart F--Environmental Impact Statements
Prior to the Commission's approval of a major Federal action significantly affecting the quality of the human environment, the Executive Director shall prepare an EIS for a
(a) As required by 40 CFR 1508.27(a) and (b), NCPC's determination of whether an EIS is required and whether impacts are significant shall be made with consideration to the context and intensity of the impacts associated with a proposed action.
(b) The significance of an action is determined in the context of its effects on society as a whole, the
(c) The significance of an action is also determined based on the severity of impacts imposed by the proposal. Severity shall be determined based on an evaluation of a proposal in the manner outlined in 40 CFR 1508.27(b)(1) through (10). The evaluation shall also be informed by the relevant policies of "The Comprehensive Plan for the
(d) Proposed actions shall also be deemed significant and require an EIS if they exhibit at least one of the following characteristics:
(1) The proposed action results in a substantial change to the Monumental Core.
(2) The proposed action causes substantial alteration to the important historical, cultural, and natural features of the
(3) The proposed action is likely to be controversial because of its impacts on the human environment.
The NCPC as
(a) The NCPC shall prepare a programmatic Environmental Document (Programmatic EA or PEA or Programmatic EIS or PEIS) to assess the impacts of proposed projects and plans when there is uncertainty regarding the timing, location and environmental impacts of subsequent implementing actions. At the time NCPC undertakes a site or project specific action within the parameters of the PEA or PEIS, NCPC shall tier its Environmental Document by summarizing information in the PEIS or PEA, as applicable, and concentrate on the issues applicable to the specific action.
(b) A PEIS or PEA prepared by NCPC shall be governed by the CEQ regulations and the rules of this part.
(a) When NCPC serves as
(1) A cover sheet. The cover sheet shall be one-page and include a list of responsible and Cooperating Agencies; the title of the proposed action that is the subject of the EIS; the name, address, and telephone number of the NCPC point of contact; the designation as to whether the statement is draft, final, or draft or final supplement; a one paragraph abstract of the EIS; and the date by which comments must be received.
(2) A summary. The summary shall accurately summarize the information presented in the EIS. The summary shall focus on the main conclusions, areas of controversy, and the issues to be resolved.
(3) A table of contents. The table of contents shall allow a reader to quickly locate subject matter in the EIS--either by topic area and/or alternatives analyzed.
(4) The purpose and need. A statement of the purpose of and need for the action briefly stating the underlying purpose and need to which the agency is responding.
(5) The identification of alternatives including the proposed action. This section shall provide a brief description and supporting documentation for all alternatives including the proposed action; the no action alternative; all reasonable alternatives including those not within the jurisdiction of the agency; alternatives considered but eliminated and the reason for their elimination; the agency's preferred alternative, if one exists; the environmentally preferred alternative; and Mitigation measures not already included in the proposed action.
(6) The identification of the affected environment. This section shall provide a succinct description of the environment to be affected by the proposed action and the alternatives considered. This section shall include, if applicable, other activities in the area affected by or related to the proposed action.
(7) The identification of environmental consequences. This section shall focus on the environmental impacts of the alternatives including the proposed action, any adverse environmental effects which cannot be avoided should the proposal be implemented, the relationship between short-term uses of the environment and the maintenance and enhancement of long-term productivity, and any irreversible commitments of resources which would be involved if the proposal is implemented. The impacts shall be discussed in terms of direct, indirect and cumulative effects and their significance, as well as any appropriate means to mitigate adverse impacts. The discussion shall also include issues and impact topics considered but dismissed to reveal non-impacted resources. Resource areas and issues requiring consideration shall include those identified in the scoping process, and, without limitation, the following:
(i) Possible conflicts between the proposed action and the land use plans, policies, or controls (local, state, or Indian tribe) for the area concerned.
(ii) Natural and biological resources including topography, hydrology, soils, flora, fauna, floodplains, wetlands, and endangered species.
(iii) Air quality.
(iv) Noise.
(v) Water resources including wastewater treatment and storm water management.
(vi) Utilities including energy requirements and conservation.
(vii) Solid waste and hazardous waste generation/removal.
(viii) Community facilities.
(ix) Housing.
(x) Transportation network.
(xi) Socio-cultural and economic environments.
(xii) Environmental Justice and the requirements of Executive Order 12898 (Federal Actions to Address Environmental Justice in Minority Populations).
(xiii) Urban quality and design of the built environment including visual resources and aesthetics.
(xiv) Historic and cultural resources to include documentation of the results of the Section 106 Consultation process.
(xv) Public health and safety.
(8) A list of preparers. This list shall include all pertinent organizations, agencies, individuals, and government representatives primarily responsible for the preparation of the EIS and their qualifications.
(9) An index. The index shall be structured to reasonably assist the reader of the Draft or Final EIS in identifying and locating major topic areas or elements of the EIS information. The level of detail of the index shall provide sufficient focus on areas of interest to any reader not just the most important topics.
(10) An appendix. The appendix shall consist of material prepared in connection with an EIS (as distinct from material which is incorporated by reference) and material which substantiates any analysis fundamental to the EIS. The material in the appendix shall be analytical and relevant to the decision to be made. The appendix shall be posted on NCPC's Web site.
(b) [Reserved]
(a) The NCPC shall involve the applicant, Federal and
(b) To determine the scope of an EIS through a Public Scoping process, NCPC shall proceed as follows:
(1) Disseminate a NOI in accordance with 40 CFR 1501.7 and 1506.6.
(2) Publish a NOI in the
(3) Include the date, time, and location of a Public Scoping meeting in the NOI. The public meeting shall be announced at least thirty (30) calendar days in advance of its scheduled date.
(4) Hold Public Scoping meeting(s) in facilities that are accessible to the disabled; include translators if requested in advance; include signers or interpreters for the hearing impaired if requested in advance; and allow special arrangements for consultation with affected Indian tribes or other Native American groups who have environmental concerns that cannot be shared in a public forum.
(5) Consider all comments received during the announced comment period regarding the analysis of alternatives, the affected environment, and identification of potential impacts.
(6) Apply the provisions of this section to a Supplemental EIS if the Executive Director of NCPC, in his/her sole discretion, determines a Public Scoping process is required for a Supplemental EIS.
(c) A Draft EIS shall be available to the public for their review and comment, for a period of generally forty-five (45) calendar days. The public comment period shall begin when NCPC shares a copy of the Draft EIS with
(a) The NCPC shall prepare a Final EIS following the public comment period and the public meeting(s) on the Draft EIS. The Final EIS shall respond to oral and written comments received during the Draft EIS public comment period.
(b) The Commission shall take final action on an application following a thirty (30) day Commission-sponsored review period of the Final EIS. The thirty (30) day period shall start when the
(a) If NCPC is the
(1) The ROD shall include among others:
(i) A statement of the decision.
(ii) The identification of alternatives considered in reaching a decision specifying the alternatives that were considered to be environmentally preferable. The ROD shall discuss preferences among alternatives based on relevant factors including economic and technical planning considerations and the Commission's statutory mission. The ROD shall identify those factors balanced to reach a decision and the influence of various factors on the decision.
(iii) A statement as to whether all practicable means to avoid or minimize environmental harm from the alternative selected has been adopted, and if not, why they are not.
(iv) A monitoring and enforcement program that summarizes Mitigation measures.
(v) Date of issuance.
(vi) Signature of the Chairman.
(2) The contents of the draft ROD proposed for Commission adoption shall be summarized in the EDR and a full version of the draft document shall be included as an Appendix to the EDR. The Draft ROD, independently of the EDR, shall be made available to the public for review fourteen (14) calendar days prior to the Commission's consideration of the proposed action for which the EIS was prepared.
(3) The Commission shall arrive at its decision about the proposed action for which NCPC serves as the
(b) If NCPC is not the
(c) If the Commission determines a
(a) The NCPC shall prepare a supplemental EIS if five or more years has elapsed since adoption of the EIS and:
(1) There are substantial changes to the proposed action that are relevant to environmental concerns; or
(2) There are significant new circumstances or information that are relevant to environmental concerns and have a bearing on the proposed action or its impacts.
(b) The NCPC may supplement a Draft or Final EIS at any time, to further the purposes of NEPA.
(c) The NCPC shall prepare, circulate, and file a supplement to a Draft or Final EIS in in accordance with the requirements of SUBSEC 601.22 through 601.24 except that Public Scoping is optional for a supplemental EIS.
(d) The NCPC shall prepare a ROD for a Supplemental EIS. The ROD's contents, the procedure for public review, and the manner in which it shall be adopted shall be as set forth in
(a) Consistent with 40 CFR1506.8, the Executive Director shall prepare an EIS for draft legislation initiated by NCPC for submission to
(b) The requirements of this section shall not apply to legislation
Subpart G--Dispute Resolution
Any disputes arising under this part, shall be resolved, unless otherwise otherwise provided by law or regulation by the parties through interagency, good faith negotiations starting at the working levels of each agency, and if necessary, by elevating such disputes within the respective Agencies. If resolution at higher levels is unsuccessful, the parties may participate in mediation.
Dated:
General Counsel.
[FR Doc. 2017-20614 Filed 9-28-17;
BILLING CODE P



Orchid Underwriters Announces Departure of Timothy Byrne, Sr.
Establishment of TRICARE Select and Other TRICARE Reforms
Advisor News
- How to manage credit card debt in retirement
- Reynolds signs temporary tax hike
- Gov. Kim Reynolds signs temporary tax hike to address Iowa Medicaid shortfall
- Reynolds signs temporary tax hike to address Iowa Medicaid shortfall
- Temporary tax hike to fill Iowa Medicaid gap heads to governor’s desk
More Advisor NewsAnnuity News
- Corebridge, Equitable merge to create potential new annuity sales king
- LIMRA: Final retail annuity sales total $464.1 billion in 2025
- How annuities can enhance retirement income for post-pension clients
- We can help find a loved one’s life insurance policy
- 2025: A record-breaking year for annuity sales via banks and BDs
More Annuity NewsHealth/Employee Benefits News
- The Superpowers of Disability Attorneys
- Avoid Mistakes: Common Reasons Why SSDI Claims are Denied
- BARB KALBACH: A pair of somber anniversaries
- FDA chief talks about the need for speed in drug approvals
- Northwestern Medicine steps up support for Crystal Lake community health clinic as insurance costs soar
More Health/Employee Benefits NewsLife Insurance News
- Corebridge, Equitable Merger Creates $1.5tr Platfrom
- AM Best Removes from Under Review with Positive Implications and Affirms Credit Ratings of Sompo Seguros Mexico S.A. de C.V.
- Corebridge, Equitable merge to create potential new annuity sales king
- Aflac adds new long-term care rider
- AM Best Affirms Credit Ratings of Nan Shan General Insurance Co., Ltd.
More Life Insurance News