Notice Type: Combine Solicitation
Posted Date:
Office Address:
Subject: Emergency Drydock Repairs CGC Barracuda
Classification Code: 20 - Ship and marine equipment
Solicitation Number: HSCG80-14-Q-P45H77
Contact:
Setaside: Total Small BusinessTotal Small Business
Place of Performance (address): Per US Coast Guard Area Instruction 3100.1F, the vessel is restricted to the
Place of Performance Country: US
Description:
NOTICE FOR FILING AGENCY PROTESTS United States Coast Guard Ombudsman Program It is the policy of the
Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester's concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the
COMMANDANT (CG-9131) U S COAST GUARD OMBUDSMAN PROGRAM FOR AGENCY PROTESTS 2100 2ND ST SW STOP 7112 WASHINGTON DC 20593-7112
The Ombudsman Hotline telephone number is 202-372-3695.
COMBINED SYNOPSIS/ SOLICITATION FOR DOCK SIDE REPAIRS FOR USCGC BARRACUDA (WPB-87301)
This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in FAR Subpart 12.6, supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a separate written solicitation will not be issued.
The solicitation is issued as a Request for Quotation (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-72. This requirement is being solicited as a Total Small Business Set-aside using Simplified Acquisition Procedures per FAR Subpart 13.5. The NAICS Code is 336611,
CONTRACT ADMINISTRATION:
The
Contracting Officer: Susan A. Kreider Telephone #: (757) 628-4644 E-Mail: [email protected] Fax #: (757) 628-4676
Alternate Contracting Officer(s): Any warranted USCG SFLC CPD Contracting Officer
Contract Administrator (Contract Specialist): Serves as the point of contact between the Contractor and the Contracting Officer(s); however, this person does not have a warrant that provides the authority to contractually commit the Government.
Contract Specialist: Jaime Smith Telephone #: (757) 628-4646 E-Mail: [email protected] Fax #: (757) 628-4676
The Contracting Officer's Representative (COR): Is a Government employee designated in writing by the Contracting Officer to act as a technical advisor for the Contracting Officer for services/items within the scope of the contract. The COR performs functions such as review and/or inspection and acceptance of supplies and services and of a technical nature. A designation letter will set forth the name of the COR and the authorities and limitations of the COR under the contract. This person does not have a warrant that provides the authority to contractually commit the Government or to modify any terms and conditions of a contract. COR: LTJG William Veilleux Telephone #: (733) 973-8905 E-Mail: [email protected]
REQUIRED DOCUMENT
Each quoter shall furnish the information required by the solicitation, which includes:
1. Schedule of Supplies and Services filled out with a cost associated with each CLIN and cost and breakdown as outlined on page 4 2. Past Performance Documentation as outlined on page 25 3. Small Business Self Certification 4. Proof of Insurance (Statement of Coverage from current Insurance carrier) as outlined on page 14 5. Welding Certifications and Procedures 6. Proof of Insurance (Statement of Coverage from current Insurance carrier) 7. Dry Dock Facility and or Dry Dock Cradle ( if applicable) Certification 8. Pre-Award Dry Dock Calculations for US Coast Guard Cutter 87 foot WPB
PLACE OF PERFORMANCE
The place of performance will be at Contractor's Facility (to be incorporated at time of award).
GEOGRAPHIC RESTRICTION: Per U. S. Coast Guard Pacific Area Instruction 3100.1F, the vessel is restricted to the
The anticipated award date is on or about
Work covered by this solicitation shall be completed within fourteen (14) calendar days from the date the vessel becomes available to the Contractor. The availability is scheduled to start on or about
QUESTIONS AND REQUEST FOR DRAWINGS: The last day to request drawings or ask questions regarding this solicitation is
QUOTATION DUE DATE
Quotations must arrive no later than
PLEASE NOTE: QUOTATIONS THAT DO NOT INCLUDE ALL REQUIRED DOCUMENTS MAY BE CONSIDERED INCOMPLETE AND MAY NOT BE CONSIDERED. DESCRIPTION OF WORK (a) The Contractor shall furnish all necessary labor, material, services, equipment, supplies, accessories, consumables, and such other things as are necessary, except as otherwise specified, to perform dock side repairs and alterations to the vessel, in accordance with this solicitation and attached USCGC BARRACUDA (WPB-87301) specification for drydock repairs FY2014, Rev-0,
(b) Failure to read the specifications in their entirety will not relieve the offeror from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the offeror's risk. All Quotations submitted in response to this solicitation shall stand firm for 60 calendar days from the response date of this solicitation.
ALL CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE RECEIPT OF THEIR QUOTES. PRICING DATA
Base Contract Line Item Numbers (CLINs) are marked as "D" for Definitive. Optional CLINs are marked "O" for Optional. Insert unit prices in all CLINs listed in the Schedule unless "NSP" is printed in the Unit Price column for any CLIN. "NSP" in the section means "Not Separately Priced." ITEM DESCRIPTION UNIT PRICE UNIT QTY EXTENDED PRICE D-001 Propulsion Shafts, Remove, Inspect, and Reinstall (D) JOB 1 O-002 Propulsion Shaft, Repair (O) JOB 1 O-003 Propulsion Shaft, Straighten (O) JOB 1 D-004 Propellers, Remove, Inspect, and Reinstall (D) JOB 1 D-005 Rudder Assemblies, Remove, Inspect and Reinstall (D) JOB 1 D-006 Drydocking (D) JOB 1 D-007 Temporary Services, Provide (D) JOB 1 D-008 Sea Trial Performance, Support, Provide (D) JOB 1 O-009 Main Engine/Reduction Gear, Realign (O) JOB 1 O-010 Intermediate Water-Lubricated Propulsion Shaft Bearing, Renew (O) JOB 1 O-011 Aft Water-Lubricated Propulsion Shaft Bearing, Renew (O) JOB 1 O-012 Intermediate Bearing Carrier, Renew (O) JOB 1 O-013 Stern Tubes, Interior Surfaces, Repair (O) JOB 1 D-014 Cathodic Protection/Zinc Anodes, Renew (D) JOB 1 O-015 Aft Bearing Carrier, Renew (O) JOB 1 O-A Composite Labor Rate` Hour 110 D-B GFP Report NSP EA 1 NSP O-Z Laydays` Day 5 Total Price of Definite Items Total Price of Optional Items Total Price of Definite and Optional Items Inspection and Acceptance is at destination CONTRACT CLAUSES (1) FAR CLAUSE 52.212-4 CONTRACT TERMS AND CONDITIONS ---COMMERCIAL ITEMS (
The Government may require the performance of the numbered line items, identified in the Schedule as option items, at the unit prices stated in the Schedule. The option quantities shown in the Schedule are estimates only. The Government has the right to require performance of these items at the quantities deemed necessary. Therefore, the Government may exercise an option item on more than one occasion during the contract performance period. The Contracting Officer will provide initial notification of the exercise of an option either verbally, by facsimile, or both. When time is of essence, initial notification will be provided verbally followed within 24 hours by a facsimile of confirmation. A contract modification will be executed shortly thereafter to include those options wherein exercise notification was provided. Such options may be exercised at any phase during the contract performance period as stated herein, or any extension of the performance period. To maintain the contract performance period the Contractor shall commence performance of an option item immediately upon receiving initial notification; but, not later than 24 hours thereafter, unless proper sequencing of the work requires a delay in beginning performance of the option. In that case, the option item shall be commenced as soon as proper sequencing permits. The exercise of any option item listed in the Schedule will not normally extend the contract performance period. However, the Contracting Officer may consider a request by the Contractor for contract extension if an option is exercised after 50% of the contract performance period has expired. (3) 52.232-40 - PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.arnet.gov/far/index.html
FAR 52.211-14 Notice of Priority Rating For National Defense EMERGENCY Preparedness, and Energy Program Use (DO) (
(End of clause)
(7) HAZARDOUS WASTE
Contractors performing dockside ship repair work at Government facilities are required to comply with FAR 52.223-3, Hazardous Material Identification and Material Safety Data (
(a) Contractors are required to comply with federal, state and local VOC compliance laws and regulations. Among other requirements, certain Contractors may also be required to operate pursuant to a Title V permit. The need for such a permit will depend on the provisions of the applicable state's "State Implementation Plan" (SIP) and the type/quantity of the Contractor's regulated emissions, including VOCs. Certain SIPs may also mandate certain Contractors to operate under the terms of a compliance plan intended to reduce VOC emissions.
(b) Contractors, therefore, must submit the following to the designated Port Engineer not later than two weeks after contract award: 1) Copies of any federal, state or local permits required and applicable to the use or application of VOCs at Contractor's facility or offsite work places; 2) Copies of any compliance plans required and applicable to the use or application of VOCs at Contractor's facility or offsite work places.
(c) If no federal, state or local permits or compliance plans are required and applicable to the use or application of VOCs at Contractor's facility or offsite workplaces, then Contractor shall submit to the designated Port Engineer a letter, notarized under oath, that such documents are not required. (d) Contractors will submit the following to the designated Port Engineer not later than two weeks after contract award: Data Sheets (MSDS) documents, certificates, specifications or any other manufacturing data verifying the VOC ratings of paints to be applied to the Cutter in accordance with MLCA Standard Spec 63000N, Section 5.3.1.
(9) TELEPHONE CHARGE
The Commanding Officer of the Cutter will pay all toll charges and applicable taxes and surcharges for long-distance telephone calls placed by ship's personnel. All other charges shall be borne by the Contractor.
(10) ACCESSIBILITY OF CONTRACTOR'S FACILITY
The Contractor shall provide a facility accessible from a navigable waterway at which a ship of the characteristics described in the attached specification can, using its own propulsion, safely arrive, lie afloat and depart at all states of the tide and at any time day or night. The facility and its approaches shall have a minimum water depth of 12 feet and a minimum vertical clearance of 60 feet.
(11) REQUIRED INSURANCE
The Contractor shall, at its own expense, procure and maintain the following kinds of insurance with respect to performance under the contract. In accordance with HSAR 3052.228-70, Insurance (
The insurance certificate must provide the name of the US Coast Guard vessel and the contract and/or solicitation number as specifically insured.
(12) ACCESS TO VESSEL
(a) A reasonable number of officers, employees, and associates of the Government, or other Prime Contractors with the Government, and their subContractors, shall, as authorized by the Contracting Officer, have, at all reasonable times, admission to the plant, and access to vessel(s) to perform and fulfill their respective obligations to the Government on a noninterference basis.
The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Contracting Officer, to be given admission to the Contractor's facilities and access to the vessel(s) and to office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of their respective responsibilities and reasonable to their performance. All such above personnel shall be required to comply with all Contractor rules and regulations governing personnel at its shipyard, including those relative to safety and security.
(b) The Contractor further agrees, as authorized by the Contracting Officer, to afford to a reasonable number of officers, employees, and associates of bidders on other contemplated work, the same privileges of admission to the Contractor's plant and access to the vessel(s) on a noninterference basis subject to all Contractor rules and regulations governing personnel in its shipyard, including those relative to safety and security.
(13) INDEMNIFICATION FOR ACCESS TO VESSELS
Notwithstanding any provision in the "Access to Vessels" clause, or any other clause of the contract, the Contractor agrees to allow officers, employees, and associates of the Government, or other Prime Contractors with the Government and their subContractors, and officers, employees, and associates of quoters on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not been previously included in the contract price.
(14) INSPECTIONS
Except as specified elsewhere, the
Records of all inspection work by the Contractor shall be kept complete and available to the Government during the term of this contract and for such longer period as may be specified elsewhere in this contract.
The name and telephone number of the U.S. Coast Guard Inspector will be provided after the award of a contract resulting from this solicitation.
(15) GROWTH WORK
(a) The Contractor shall not perform growth work without the Contracting Officer's authorization. Growth work is work within the scope of the contract, which has not been previously priced as a pre-priced CLIN. The Contracting Officer reserves the right to contract for growth work on the basis of a negotiated, firm, fixed price, when it is in the best interest of the Government. If a firm-fixed price contract is awarded, and during the performance period a repair within scope is identified but the Contracting Officer and Contractor are unable to agree on the cost of the work, a bilateral modification may be incorporated into the contract using a Time and Materials modification for this specific repair. In this situation, FAR 52.212-4, Alternate I, will be incorporated.
(b) The Contractor shall furnish a price breakdown directly to the Contracting Officer, itemized as required by the Contracting Officer, of any Quotation submitted for a contract modification. Unless otherwise directed, the breakdown shall be submitted on an SFLC 002 proposal form provided at the arrival conference permitting an analysis of all materials, labor, equipment, subcontract, overhead costs, and profit covering all work involved in the change/modification whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by a separate, similar price breakdown. If the Quotation includes a request for a time extension, justification shall be furnished with the Quotation.
(c) This clause is to be used in conjunction with the clause COMPOSITE LABOR RATE incorporated into this solicitation. The Contractor is required to have and/or furnish all tools and equipment incidental to each bench trade. Supplies such as wiping rags, hacksaw blades, sandpaper, welding wire, helium, etc., are also to be furnished by the Contractor and shall be included in the Composite Labor Rate. Other materials are to be charged at regular rates and prices currently in effect and as agreed to by the Contracting Officer. Material shall be best commercial quality available except where a precise specification is indicated in which case the specification shall apply, e.g., MILSPEC, FEDERAL SPEC.
(16) DISCOVERIES AND CHANGES TO CONTRACT Work requests can be transmitted electronically by using email. The bullets below display the process of how work requests are to be followed during an availability:
Work Request Process will occur in the following order:
1. Condition Found Report-Generated by the contractor and provided to COR 2. Condition Report Reply-Generated by the COR and provided to Contractor 3. Work Request- WR and IGE are generated by the COR and forwarded to KO 4. COR provides copy of Work Request to the Contractor 5. Contractor's Quotation- Provided to the KO for the identified tasking on WR 6. Negotiations- If needed, take place to establish pricing 7. Approved Work Request- Forwarded to Contractor and COR by the KO 8. Modification to Contract- The KS/KO will issue a modification covering all WR's
(17) COMPOSITE LABOR RATE
The composite labor rate offered shall be the sole labor hour rate used to price the Prime Contractor's direct labor hours for contract changes, i.e. growth work. The Contractor shall not receive any compensation in addition to this rate for the Prime Contractor's direct labor associated with such changes under this contract.
(a) The composite labor hour rate shall represent total compensation for the following:
(1) direct labor wages and salaries; (2) all employee benefits including, but not limited to, paid leave, supplemental pay, insurance, retirement, savings, and legally required benefits; (3) other direct costs associated with transit time, delay, disruption, consumables, expendable supplies, and equipment; (4) all indirect costs such as overhead and general and administrative expense; (5) any port or association fees, rents, or other levies; (6) profit (fee); (7) all direct and indirect costs and profit associated with the following support functions: Supervision and Management Planning and Estimating Material Handling Housekeeping Engineering Transportation/Drivers Quality Assurance Contract Administration Security Testing (8) all consumables;
(b) The composite labor hour rate will be applied to production labor hours only. Production labor hours include only those hours necessary and reasonable to perform direct production functions and do not include the hours expended on the support functions listed above. This exclusion of support function hours applies whether such support functions are normally charged directly or indirectly by the Contractor's accounting system. These support functions are to be priced into the composite labor rate quoted and shall not be separately compensated.
(c) The Quantity of Composite Labor hours indicated in the Schedule of Supplies/Services, is only an estimate and is an Optional Item pursuant to this solicitation. The Estimated Quantity represents the Government's best estimate of the total number of additional hours that may be required throughout the contract. The Government may elect to exceed this value at the prices stated in the schedule and its discretion during performance of the contract. The inclusion of this item does not obligate the Government to exercise the item nor entitle the Contractor to compensation if not exercised.
(18) MAINTAINING, REPORTING, AND DISPOSING OF GOVERNMENT PROPERTY IN THE PERFORMANCE OF A SHIP REPAIR CONTRACT
1. The Government Property Clause incorporated by reference delineates the Contractor's overall responsibility when taking possession of government property in performance of a contract. In performance of this contract the Contractor will be required to properly identify, track and control property within its possession. This includes, a) property furnished by the government (GFP) to the Contractor in conjunction with specific CLIN Items. These items and their values are listed in the specification, b) property that is pre-existing in a location that during the course of performance will be replaced or renewed. 2. The items listed in the specification, as government furnished property will be provided in the quantities designated. Government furnished property may be provided in person by an official
3. The Contractor shall complete the report provided herein, entitled, "Government Property Report". This report is intended as a living document whereby relevant fields shall be filled in, maintained and kept current at all times. All property described in paragraph 1 (a and b) above shall be reported on the report. At contract completion the Contractor and the Property Administrator shall ensure that all fields are appropriately completed. A signature block is provided at the end of the report for both parties to attest to the report's accuracy and completeness. The Government Property Report shall clearly delineate the complete track that all Government property took over the course of the contract. This completed report must accompany the Contractor's final invoice. Final payment may be delayed, without penalty of interest, until such time as the report is received. A separate copy of the completed report and any final DD 1149s or DD 1348s executed, as a result of carrying out disposition instructions shall be provided to the Property Administrator. 4. Pursuant to the Government Property Clause the authority to render disposition instructions of Government property associated with this contract is delegated to the Property Administrator. The Contractor shall comply with all instructions in the contract for the return of government property to the
No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.
(20) CONTRACTOR PERFORMANCE EVALUATION
The U.S. Coast Guard Surface Forces Logistic Center (SFLC) will monitor and evaluate the successful offeror's past performance of this contract and prepare a Contractor Performance Assessment Report (CPAR) in accordance with FAR Part 42.15. All information contained in this assessment may be used, within the limitations of FAR 42.15, by the government for future source selections and in accordance with FAR 15.304, when past performance is an evaluation factor for award.
(b) NOTIFICATION: Upon completion of the contract, the contractor will be notified of the assessment. The contractor will be allowed 30 days to respond to the SFLC's assessment of its performance entered into CPARS. The contractor's response, if any, will be made part of the CPAR system at https://www.cpars.csd.disa.mil.
(c) INFORMATION: Information included in the CPAR may include, but is not limited to, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; the contractor's record of integrity and business ethics, and generally, the contractor's business-like concern for the interest of the customer.
(d) RELEASE OF DATA: CPARS information is considered business sensitive and will not be released except: (1) to other Federal procurement activities which request it; (2) when SFLC must release pursuant to a Freedom of Information Act (FOIA) request; or (3) when prior written consent is requested and obtained from the contractor.
(21) METHOD OF PAYMENT AND INVOICING INSTRUCTIONS
INVOICE SUBMISSION PROCESS
1. The Contractor shall prepare a proper invoice IAW FAR clause 52.212-4, and in addition to the information required by FAR 52.212-4(g) as cited in the contract. All invoices shall be itemized to correlate to the Schedule of Supplies/Services. Invoices should be submitted for payment directly to the finance center upon completion of the contract.
All information must be included in an invoice for it to constitute a proper invoice. All improper invoices will be rejected which could delay payment.
2. Visit the U.S. Coast Guard Finance Center Website for instructions regarding electronic submission of invoices: http://www.fincen.uscg.mil/electron_cg23.htm. 3. A copy of the invoice and any supporting documentation shall also be e-mailed to the following individuals:
[email protected][email protected]
Additional work verbally agreed to by the parties that has not yet been incorporated into the contract by modification shall not be included in an invoice. Payments will not be made for any work to which a modification has not been properly executed. Invoices submitted for payment that includes such a request will be reduced by the unmodified amount NOTE: 10% OF THE TOTAL CONTRACT PRICE WILL BE WITHHELD UNTIL ALL DELIVERABLES, REQUIRED BY THE CONTRACT, ARE RECEIVED AND ACCEPTED.
FURTHER CONSIDERATIONS WITH INVOICING:
In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received: (1) On the later of: (i) For invoices that are mailed the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt. (ii) For invoices electronically transmitted by the contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or (ii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless- a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date; (2) On the date placed on the invoice by the contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be a proper invoice); or (3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice. (4) Web based submission by the contractor and receipt confirmation does not reflect government review or acceptance of the invoice. (5) For inquiries and payment status please visit https://fincen.uscg.mil/secure/payment.htm The Data Universal Numbering System (DUNS) number is the primary identifier in Central Contractor Registration (CCR), (see FAR 52.232-33, Payment by Electronic Funds Transfer - Central Contractor Registration (
All payments for partial performance rendered by the Government under this contract are based on the assumption that the Contractor will, in good faith, execute and honor all payment terms entered into between it, the Prime Contractor, and any subcontractor thereof in the performance of this contract. The Contractor hereby acknowledges the Government's right to reduce or suspend progress payments based on non-payment in accordance with any payment terms of the subcontract agreement.
Any amount deemed not payable will be deducted from the Contractor's invoice. Deducted amounts may be resubmitted on the next invoice for reconsideration.
(22) CONTRACT DEFICIENCY REPORT
The Contracting Officer or Contracting Officer's Representative (COR) may issue a Contract Deficiency Report (CDR), SFLC Form 005. The Contractor shall respond in writing within 24 hours of receipt, unless otherwise approved by the Contracting Officer, to the COR. The COR will comment on the Contractor's response and will forward the Deficiency Report and comments to the Contracting Officer, with a copy to the Contractor and Availability Program Manager. The Contracting Officer will render a final determination and provide it to the Contractor and COR in writing.
(End of FAR 52.212-4 Addendum) (23) FAR CLAUSE 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS-COMMERCIAL ITEMS (
(24) FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at: http://www.arnet.gov/index.html.
(25) FAR PROVISION 52.212-1 INSTRUCTIONS TO OFFEROR'S-COMMERCIAL ITEMS (
a. Orders for
(27) FAR PROVISION 52.215-20 REQUIREMENTS FOR COST OR PRICING DATA OR INFORMATION OTHER THAN COST OR PRICING DATA (
(a) Submission of cost or pricing data is not required
(b) If the contracting officer cannot determine price reasonableness either in the initial solicitation or in any change to the contract after award, the contracting officer will require submission information in sufficient detail in order to make such determination.
The information may be as follows:
REQUEST FOR INFORMAL COST BREAKDOWN
In addition to placing your offer in the appropriate place in Schedule of supplies and Prices, it is requested that you provide a breakdown of your costs, to include but not be limited to, those items identified in the sample format below: Trade, (i.e. laborers, rigger, etc.) Breakdown of labor grades by trade category Manhours per trade, per labor grade
The Request for Quotation (RFQ) is for the dock side repairs of the USCGC BARRACUDA hereinafter referred to as "vessel". The vessel's temporary homeport is
(30) FAR PROVISION 52.212-2 EVALUATION - COMMERCIAL ITEMS (
QUOTES SHALL BE EVALUATED USING THE FOLLOWING CRITERIA:
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
FACTOR 1 - PAST PERFORMANCE:
The offeror shall identify at least two (2) but no more than three (3) relevant (construction, overhaul, repair and alteration of ships) and current federal, state or local government or private contracts performed during the last three (3) years. For each contract, list:
(a) Contract number and customer point of contact (including two (2) points of contact with telephone numbers) (b) Dollar value of the contract (Original and Final) (c) Type of service performed and whether Prime or subcontractor (d) Required completion date for the contract (e) Date the services were actually completed (f) Ship Name, Hull Number (g) Contract type (FFP, IDIQ, Requirement, Cost Type) (h) Percentage of growth in contract price (Additional work divided by award price)
If subcontracting arrangement is proposed, the above data must also be provided for each first tier subcontractor. If a joint effort or teaming arrangement is proposed, highlight previous experience with the proposed team or subcontractor.
The past performance evaluation will take into account the guidelines outlined at FAR 15.305(a)(2) Past Performance Evaluation. The Contractor's past performance will be evaluated according to the following factors and questions: Quality of Product or Service Did the customer get what was specified Did the customer consider the final product high in quality If warranty issues arose, were they promptly corrected Schedule Was the contract completed on time If not, reason why not (growth work, Contractor delayed, government delayed ) Business Relations How was the customer service Was the Contractor committed to customer satisfaction Would you use this company again (Why/Why not) Management of Key Personnel Were subcontracts involved Comments
In evaluating Contractors past performance, the government intends to also review U.S. Coast Guard Contractor Performance Assessment Reports and other existing past performance ratings on relevant contracts. General trends in a Contractor's performance will also be considered.
A quote without a record of relevant, past performance will not be evaluated favorably or unfavorably on past performance.
FACTOR 2 - PRICE: Offeror's price shall represent the best and final price in response to the request for quotes. The price shall be evaluated to determine fairness and reasonableness.
**** Past Performance is more important than Price****
Award may be made without any type of discussions or negotiations. This is based on the Contracting Officer's determination after an evaluation has been completed on all offers.
(31) FAR PROVISION 52.212-3 - OFFEROR REPRESENTATIONS AND CERTIFICATIONS - COMMERCIAL ITEM (
Line Item No. Country of Origin ______________ _________________ ______________ _________________ ______________ _________________ [List as necessary] (3) The Government will evaluate offers in accordance with the policies and procedures of FAR Part 25. (g)(1) Buy American Act-Free Trade Agreements-Israeli Trade Act Certificate. (Applies only if the clause at FAR 52.225-3, Buy American Act-Free Trade Agreements-Israeli Trade Act, is included in this solicitation.) (i) The offeror certifies that each end product, except those listed in paragraph (g)(1)(ii) or (g)(1)(iii) of this provision, is a domestic end product and that for other than COTS items, the offeror has considered components of unknown origin to have been mined, produced, or manufactured outside
Link/URL: https://www.fbo.gov/spg/DHS/USCG/COUSCGMLCA/HSCG80-14-Q-P45H77/listing.html
| Copyright: | (c) 2013 Federal Information & News Dispatch, Inc. |
| Wordcount: | 19033 |



Combine Solicitation – 49– Preventive Maintenance Alaris Infusion Pump
Advisor News
- Using digital retirement modeling to strengthen client understanding
- Fear of outliving money at a record high
- Cognitive decline is a growing threat to financial security
- Two lessons career changers wish they knew before starting the CFP journey
- Americans less confident about retirement as worries grow
More Advisor NewsAnnuity News
- CareScout Joins Ensight™ Intelligent Quote LTC & Life Marketplace
- Axonic Insurance Annuities, Built for Banks, Broker-Dealers and RIAs, Now Available through WealthVest.
- Allianz Life Adds New Accumulation-Focused Fixed Index Annuities
- Allianz Life adds new accumulation-focused FIAs
- Industry objects to ‘tone and tenor’ of draft NAIC Annuity Buyer’s Guide
More Annuity NewsHealth/Employee Benefits News
- After health insurance subsidies end, 30,000 Idahoans will be uninsured, government report says
- Georgia’s ACA enrollment plunges, raising concerns for rural hospitals
- Pending cuts to Georgia Medicaid payments could affect children who need therapy
- Orange schools, teachers union at impasse over health insurance
- Miami judge sides with cancer patient, orders insurer to cover pricey treatment
More Health/Employee Benefits NewsLife Insurance News
- Agam Capital and 1823 Partners Announce Strategic Partnership to Provide Life Insurers with an End-to-End Value Chain Solution
- AM Best Revises Outlooks to Positive for Western & Southern Financial Group, Inc. and Its Subsidiaries
- Principal Financial Group Announces First Quarter 2026 Results
- SBLI Enhances its OmniTrak Term to Deliver Faster Decisions, More Client Coverage, and Improved Pricing
- Life insurance premium surges, but coverage is still falling short for many
More Life Insurance News