Procedures for Implementing the National Environmental Policy Act
Final rule.
CFR Part: "18 CFR Part 1318"
Citation: "85 FR 17434"
Page Number: "17434"
"Rules and Regulations"
Agency: "
SUMMARY: This final rule amends the procedures of the
DATES:
This final rule is effective
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
I. Background This final rule revises
In 2016,
The final rule incorporates: (1) Updates to organizational references to clarify roles and responsibilities within
When established in 1980,
On
Like
In its Notice of Proposed Rule,
After considering the public comments on the proposed rule, additional internal review, and consultation with CEQ,
II. Comments on the Proposed Rule and
During the 2017 public review period,
The following discussion includes the comments received,
A. General Comments on the Proposed Rule
Comment:
Response:
A CE is a form of NEPA compliance, and not an exemption from NEPA. A CE is established for a category of actions that
Although there is no requirement under NEPA or CEQ regulations to do so, to ensure transparency,
In addition,
Comment:
Response: The final rule does not reduce
Comment: We oppose the proposed amendments to the TVA NEPA procedures. We do not trust
Response:
Comment:
Response: Protecting public health and safety is among the key considerations in all NEPA reviews, including the establishment and application of CEs, and is
Comment:
Response:
Comment: The proposed procedures do not address the increased uncertainty due to climate change and state that
Response:
Comment:
Response:
Comment: We are concerned about the wind energy project proposed to be constructed near
Response: The concerns expressed in this comment relate to a specific wind energy development project that is no longer under consideration. While comments related to the
Comment:
Response: Thank you for expressing interest in collaborating with
Comment:
Response: CEQ instructs agencies to develop their own NEPA procedures that supplement CEQ regulations (40 CFR 1507.3(a)).
The commenter asserted that
Comment: Given the complexity of
Response: The publication of the proposed rule in the
Comment:
Response:
B. Comments on Subpart A--General Information
Comment:
Response: The language in the rule reflects current case law addressing the meaning of "controversial" under NEPA. Courts have consistently held that controversy refers to disagreement with respect to the characterization of the effects on the quality of the human environment, rather than opposition to a proposal. See, e.g.,
Comment: The Commonwealth of
Response:
C. Comments on Subpart C--Categorical Exclusions
Comment: Under its procedures addressing "extraordinary circumstances,"
Response:
Under
Comment:
Response: In response to the
Comment:
Response: A commenter who raised concerns about a specific wind energy project also stated that a potential electrical transmission interconnection to wind turbine projects should be considered an extraordinary circumstance.
Comment: The proposed procedures regarding the identification of extraordinary circumstances are inconsistent with NEPA and CEQ guidance.
Response: Under SEC 1318.201(a), the final rule provides that an action that may otherwise be categorically excluded may not be so classified if an extraordinary circumstance is present and cannot be mitigated. If any of the extraordinary circumstances listed in Section 1318.201(a) apply to the proposed action,
Other agencies have recently promulgated similar procedures for extraordinary circumstances, including the
As noted above, when issuing its final 2010 guidance on CEs, CEQ stated in its preamble that it had received specific comments noting that, "the determination that an extraordinary circumstance will require additional environmental review in an EA or an EIS should depend not solely on the existence of the extraordinary circumstance but rather on an analysis of its impacts." In reply to this comment, CEQ stated that it agreed with this perspective (75 FR 75629,
Comment:
Response: The division of the section into separate paragraphs (with
Comment:
Response: As previously stated,
Comment:
Response:
In its 1983 guidance on NEPA regulations, CEQ encouraged agencies to "consider broadly defined criteria which characterize types of actions that, based on the agency's experience, do not cause significant environmental effects" (48 FR 34263,
As discussed in the Supporting Documentation prepared by
For most activities that could qualify for a CE,
As
Comment:
Response: CEQ's 2010 guidance on CEs provides direction on how to substantiate new or revised CEs: "An agency's assessment of the environmental effects of previously implemented or ongoing actions is an important source of information to substantiate a categorical exclusion. Such assessment allows the agency's experience with implementation and operating procedures to be taken into account in developing the proposed categorical exclusion." (75 FR 75631,
Comment:
Response:
When establishing its NEPA procedures in 1980,
Comment:
Response: A team of environmental and legal professionals was involved in the development of the revised procedures. The team included
Comment: The Commonwealth of
Response: In response to this recommendation,
Comment:
Response: This practice is currently observed by
Comment: Using CEs leads to less thorough environmental reviews and less robust decisionmaking (e.g., it does not allow for considerations such as mitigation measures).
Response: A categorical exclusion is not an exemption from environmental review under NEPA, but is instead the result of an agency's evaluation of a class of actions that, in the absence of extraordinary circumstances, do not individually or cumulatively have the potential to cause significant environmental impacts.
Comment:
Response:
Comment: In its Supporting Documentation,
Response: CEQ's guidance to agencies on establishing CEs directs the preparation of documentation with sufficient information to substantiate the new CEs (75 FR 75628,
Consistent with CEQ's 2010 guidance, the discussions of revised or new CEs vary. The amount of information provided by
Comment: The Supporting Documentation fails to provide any analysis of the potential for cumulatively significant effects on any of the 50 proposed CEs.
Response:
Comment: In its Supporting Documentation,
Response: As noted above,
Comment: The EAs and EISs cited by
Response: The Supporting Documentation provided by
Many of the EAs and associated FONSIs cited by
Several mitigation measures identified in the cited EAs and FONSIs were developed through other environmental compliance processes (e.g., through consultation with
Commenters request that the mitigation measures listed in the cited EAs and FONSIs be included in the definition of the CE because they are integral components of the category of actions. Because the majority of mitigation measures listed in the cited EAs and FONSIs are included in the project design or derive from
Based on public input,
Comments addressing the segmentation of actions addressed under programmatic EISs are address above.
Comment: The CEs of other agencies that
Response: The inclusion in
Comment: By proposing to categorically exclude electricity contracts (under CE 6) without limiting application to situations where the contract will definitively not have such impacts,
Response: The proposed revision to the CE established by
Comment: Proposed CE 15, which addresses transmission line maintenance actions, violates and contravenes the injunction of the
Response:
Comment: The implementation of proposed CEs 15 and 19, both of which deal with the vegetation management decisions in
Response: As noted above,
Comment: Proposed CE 16, which includes the construction of new transmission lines and substations, would allow
Response: CEQ regulations and guidance and
As stated in the Supporting Documentation, the CE limits actions to no more than 10 miles in length and no more than 125 acres of new ROWs. This CE's acreage limit applied to actions involving new 500-kV transmission line construction would limit the length of such lines to less than 5.9 miles.
Comment:
Response:
In its Supporting Documentation,
As stated in
Comment: In CE 16,
Response:
When considering the extent of a proposal's wetland impacts,
Comment: Construction actions such as those under CE 16 should not be exempted from NEPA due to the projects' potential to impact the environment and surrounding citizens negatively.
Response: As stated in a previous response, CEs are not exemptions from or waivers of NEPA review; they are a type of NEPA review. Under CE 16,
As previously noted,
Comment: Proposed CE 17 would allow
Response: As presented in the Supporting Documentation, CE 17 is based on
Transmission system CECs are typically prepared for small and isolated projects. Any system-wide effort to uprate a portion of the
CEQ guidance affirms that CEs are not exemptions or waivers of NEPA review; they are simply one type of NEPA review. Under CE 17,
Comment: Proposed CEs 15, 16, and 17 do not adequately address cumulative impacts, which should be considered in siting.
Response:
In the Supporting Documentation,
Comment: Proposed CEs 15, 16 and 17 should be withdrawn because
Response: As noted above,
Comment: Proposed CE 18 contains no limit to the length, geographic scope, or environmental impacts that the installation of fiber optics, electricity transmission control devices and supporting towers could have under the CE. The CE does not set forth specific criteria for and identification of the actions that it proposes to categorically exclude (40 CFR 1507.3(b)(2)).
Response:
Comment: Regarding CE 19, tree clearing and vegetation management practices for existing transmission infrastructure have significant environmental indirect, direct, individual, and cumulative effects, thereby requiring an EIS. If the tree clearing for maintaining rights-of-way and existing transmission has significant environmental effects, surely the same is true for new transmission infrastructure.
Response: Categorical exclusion 19 addresses the common activities
As explained in the Supporting Documentation, the 25-mile limit for redevelopment along existing ROWs is supported by previous environmental reviews conducted by
The spatial limit for area of disturbance (125 acres) is consistent with the limitation included in CE 16, which is also supported by
The summary of potential impacts in the Supporting Documentation is consistent with CEQ's 2010 guidance and adequately substantiates the creation of CE 19.
Comment: Proposed CE 20 should not include surplus transmission or generation properties that have recreational and/or natural resource value.
Response: This CE does not apply to generation properties. It applies only to existing transmission-related equipment and facilities. Generally, any properties addressed in CE 20 are industrial in character and, thus, are not suitable for recreational use and have limited natural resources value.
Comment: The definition of proposed CE 20 does not set forth "specific criteria for and identification of" the actions that it proposes to categorically exclude, as instructed by CEQ (40 CFR 1507.3(b)(2)). CE 20 must be rewritten to describe specific activities.
Response:
The replacement of the word "sale" with the word "disposal" in the definition of the CE clarifies that the action includes any transfer of ownership, rather than just monetary purchases. The word "disposal" refers to the transfer of the property, not the destruction or demolition of the infrastructure; this definition of disposal is well understood within
These actions are distinct from other actions relating to
Comment: Proposed CE 21 lacks the specificity required by NEPA and the CEQ regulations to ensure that no significant environmental impacts will occur as a result of application of the CE.
Response: In response to this comment,
Under the final rule,
Comment:
Response: The definition of the CE sufficiently defines discrete and routine types of actions in well-defined settings.
The discussion of impacts in each section of the Supporting Documentation is, as noted in the document, a summary of
As noted above,
An example action listed in the proposed CE 22 was the "stabilization of sites."
Comment:
Response:
Comment: Proposed CE 24 lacks specificity and should be either revised by
Response: The revisions to this CE do not expand its scope.
Comment: Proposed CE 25 would allow
Response:
Comment: Proposed CEs 24 and 25 are too broad and could be misconstrued.
Response: Based on
Comment: Proposed CE 26 lacks specificity; it should be revised to comply with NEPA or withdrawn.
Response: The comments do not specifically address the addition by
Comment:
Response: Approvals of minor shoreline structures and facilities are among
Comment:
Response: As noted above,
The spatial limitation of 0.5 mile for stabilization projects is intended to ensure that actions under this CE are minor in nature. To identify a spatial limit for the definition of this CE,
Based on the suggestion by a commenter,
Comment:
Response:
Comment:
Response: The scope of CE 28 is limited to minor land allocation modifications and would not affect broad swaths of lands.
Also,
Comment:
Response: Based on extensive experience in conducting minor natural resource management actions,
After publication of the Notice of Proposed Rule,
When applying CE 29,
CEQ regulations prohibit the practice of segmenting projects into smaller components in order to avoid finding a significant impact of a project considered as a whole.
Comment:
Response:
In addition, comments also asserted that two of the 19 CEs cited by
Comment: Proposed CE 31 lacks specificity, impacts of such actions are significant, and cited EAs, EISs, and benchmarked CEs do not support
Response: The comments relating to the definition of the CE (e.g., use of the limiting terms and failure to specify the geographic area when conducting actions), the potential that such actions may result in significant impacts, the adequacy of the EAs and EISs cited in the Supporting Documentation, and the appropriateness of using CEs for certain natural resource program actions have been previously asserted; the responses above are equally applicable here.
Again,
Comment:
Response:
As previously stated,
Comment:
Response:
Comment: Proposed CE 35 lacks the specificity required by CEQ and NEPA to ensure that actions would have little potential for significant impacts. Commenters suggested various changes, including eliminating the CE entirely, removing groundwater supply wells from the category of actions, applying a low volume limit on covered water supply wells, eliminating its applicability to other types of wells (e.g., oil and gas), and providing clarification for determining what is "low potential" during site characterization. The water quality incident in
Response: Based on consideration of the comments received,
By comparison,
Regarding comments on plugging of wells,
The CE includes a statement limiting its use to circumstances when there is "low potential for seismicity, subsidence, and contamination of freshwater aquifers." The inclusion of this text ensures that
Finally,
Comment: CE 36 sweeps in far too much, and would exempt from NEPA review exactly the sort of activities that should be reviewed under NEPA. CE 36 should be withdrawn, or at the very least,
Response: As previously noted, CEs are not exemptions from or waivers of NEPA review; they are simply one type of NEPA review. Among the actions falling under CE 36 are some of
As demonstrated in the Supporting Documentation,
The terms used in the definition of the CE (e.g., routine, in-kind, replacement, maintenance) are well understood by
Commenters also assert that "a category of action is only appropriate for a CE if those activities are incapable of causing significant environmental impact" and that "[f]or something to be categorically excluded, it should never have significant environmental effects." However, Federal agencies, in developing their NEPA procedures, are required to consider extraordinary circumstances in which a normally excluded action may have a significant environmental effect." See 40 CFR 1508.4. CEQ describes such extraordinary circumstances as "factors or circumstances in which a normally excluded action may have a significant environmental effect. . . ." (75 FR 75629,
In the
Comment: The
Response: Under the final rule,
Comment: Proposed CE 37 is inconsistent with the requirements of NEPA, and the actions covered by proposed CE 37 are exactly the sort that should be subjected to NEPA analysis. It is inappropriate to benchmark to the
Response:
Since 1980, activities under CE 37 have been categorically excluded under 5.2.1 of
Comment: The current language of proposed CE 38 is too broad and would allow
Response: The construction of new buildings and associated infrastructure in small areas are activities common to
CE 38 would not apply to the siting, construction, and use of new power generating facilities. The CE is intended to address only buildings and associated infrastructure (e.g., parking areas, utility lines serving the building). To improve clarity,
Comment:
Response: The suggestion is noted. The commenter did not explain why the suggested limits would be more appropriate.
Comment:
Response:
Comment: Several commenters expressed concern with the scope of actions covered under CE 45. Two commenters recommended that
Response: Upon further consideration,
Comment:
Response:
As described in the Supporting Documentation, this CE is benchmarked closely with those of other federal agencies, primarily the
Comment: Proposed CE 45 item (b), which addresses solar photovoltaic systems, should be revised to remove the reference to on-the-ground systems, thereby limiting the category to solar system mountings on existing buildings or structures.
Response: The comment expressing this preference is noted.
Comment: We are opposed to any green field development.
Response: Comment noted.
Comment: Commenters expressed opposition to the proposed CE 46 because
Response: Based on public comment and additional internal consideration,
Comment: Several commenters expressed concern with proposed CE 47, regarding modifications of
Response: During the public review period for this rulemaking,
Comment: CE 47 would reverse
Response: As noted above,
Based on further internal deliberation and consideration of public input,
Although a proposed action may meet the definition of a CE (i.e., may fall within the category of actions),
Comment: The definition of CE 47 lacks specificity for "minor" increases and the scope of extraordinary circumstances that would constitute the need for an EA or EIS.
Response: As noted above,
Comment:
Response: The new CE established by
D. Comments on Subpart D--Environmental Assessments
Comment:
Response: To ensure consistency with CEQ regulations at 40 CFR 1501.4(e)(2),
Comment:
Response: The comments address a contradiction between [Sec.]
Further,
Comment:
Response:
Comment:
Response:
CEQ regulations describe EAs as "concise" documents that offer brief discussions of environmental impacts, sufficient to determine whether preparation of an EIS is required and to aid in compliance with NEPA when no EIS is necessary.
The final rule does not substantively revise procedures relating to the scope of EISs.
E. Comments on Subpart E--Environmental Impact Statements
Comment: Contrary to the requirements of NEPA and the CEQ regulations,
Response: When determining the scope of its revision to these procedures,
Comment: Wind turbine projects are actions that should normally require an EIS.
Response: Comment noted. The appropriate level of NEPA review would be determined by
Comment: The procedures addressing the adoption of environmental reviews of other agencies are inconsistent with NEPA and the CEQ regulations.
Response: Based on this comment as well as further deliberation,
Comment: The procedures addressing records of decision is inconsistent with NEPA and the CEQ regulations.
Response:
Comment: The procedures for developing EISs inappropriately give
Response: Except for minor edits to reflect current
Based on
Comment: The procedures addressing the supplementation of EISs are not consistent with NEPA or CEQ's regulations.
Response: In response to this comment,
Comment:
Response:
F. Comments on Subpart F--Miscellaneous Procedures
Comment: Procedures addressing mitigation are inconsistent with NEPA and the CEQ regulations.
Response:
Comment: The procedures addressing programmatic NEPA reviews are inconsistent with NEPA and the CEQ regulations because they would allow
Response: It is not the intent of the final rule to allow interim actions under consideration to be implemented prior to the conclusion of a NEPA review. Section 1318.503(c) addresses implementing actions that have been previously planned and approved by
Comments related to the need to incorporate CEQ guidance relating to public involvement and transparency are noted.
The commenter also suggested adding numerous provisions to the final rule to incorporate the CEQ guidance. These comments are noted.
Comment: Procedures in Subpart F regarding emergency actions and "unforeseen situations" are inconsistent with NEPA and the CEQ regulations.
Response: In response to the comment,
G. Comments on Subpart G--Floodplains and Wetlands
Comment:
Response: Although TVA did not propose any revisions to the sentence addressed in this comment,
Comment:
Response:
Comment:
Response: Science-based methods and tools for wetland identification, delineations, and assessment are integral for an accurate analysis to meet NEPA standards. For all proposed projects,
Environmental effects of proposed actions upon wetlands are assessed for site-specific wetland conditions and include an analysis of cumulative impacts to wetlands within a watershed and ecoregion context. Regional wetland status and trends data is obtained through land use/land cover analysis. These wetland evaluation methods utilize current best practices and are fundamentally based on botany, hydrology, pedology, ecology, and geomorphology. These methods are also tied to regulatory-standards for wetland identification and delineation; these standards are developed by multiple national advisory teams and undergo periodic evaluation and updates based on changes in wetland science.
Comment:
Response: Comment noted.
Comment: When TVA published its proposed rule, it provided its document addressing "Determination of Project Specific Federal Flood Risk Management Standard (FFRMS) Elevations and Their Applicability." This document is unclear concerning climate change and the effects of weather.
Response: During the public review of the proposed rule,
This PFHA system gives
III. Description of Changes Made
As indicated in many of the responses to public comments,
Subpart A--General Information
Subpart B--Initiating the NEPA Process
Subpart C--Categorical Exclusions
In the final rule,
Appendix A--Categorical exclusions. In the final rule, the list of CEs was revised based on public input on the proposed rule and additional internal deliberation.
* In the final rule,
* In the list of example actions of CE 13,
* For CE 17,
* For CE 21, based on public input,
* In the list of example actions of CE 22,
*
*
*
* As a result of public comment,
*
*
*
*
*
*
*
* Items (c) and (d) were removed from CE 45's list of covered actions in response to public comment and
*
* As a result of public comment and further internal deliberation,
Incorporating all of these changes has resulted in changes to the list of 28 CEs established by
Subpart D--Environmental Assessments
Subpart E--Environmental Impacts Statements
Subpart F--Miscellaneous Procedures
Subpart G--Floodplains and Wetlands
As noted above, in its proposed rule,
IV. Administrative Requirements
A. Unfunded Mandates Reform Act and Various Executive Orders Including E.O. 12866, Regulatory Planning and Review; E.O. 12898, Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Populations; E.O. 12988, Civil Justice Reform Act; E.O. 13045, Protection of Children From Environmental Health Risks; E.O. 13132, Federalism; E.O. 13175, Consultation and Coordination With Indian Tribal Governments; E.O. 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, and Use; and E.O. 13771, Reducing Regulation and Controlling Regulatory Costs
This rule amends
B. Regulatory Flexibility Act
Under the Regulatory Flexibility Act, 5 U.S.C.
C. Paperwork Reduction Act
This final rule does not contain information collection requirements that require approval by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq.
D. National Environmental Policy Act
The CEQ does not direct agencies to prepare a NEPA analysis before establishing agency procedures that supplement the CEQ regulations for implementing NEPA.
List of Subjects in 18 CFR Part 1318 Administrative practice and procedure, Environmental impact statements, Environmental protection, Floodplains, Floods, Wetlands.
For the reasons stated in the preamble,
PART 1318--IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969
Subpart A--General Information
Sec.
1318.10Purpose.
1318.20Policy.
1318.30Abbreviations.
1318.40Definitions.
Subpart B--Initiating the NEPA Process
1318.100Action formulation.
1318.101NEPA determination.
Subpart C--Categorical Exclusions
1318.200Purpose and scope.
1318.201Extraordinary circumstances.
1318.202Public notice.
Appendix A to Subpart C of Part 1318--Categorical Exclusions
Subpart D--Environmental Assessments
1318.300 Purpose and scope.
1318.301Public and stakeholder participation in the EA process.
1318.302 EA preparation.
1318.303 Finding of No Significant Impact.
1318.304Supplements and adoptions.
Subpart E--Environmental Impact Statements
1318.400Purpose and scope.
1318.401Lead and cooperating agency determinations.
1318.402Scoping process.
1318.403DEIS preparation, transmittal, and review.
1318.404FEIS preparation and transmittal.
1318.405Agency decision.
1318.406Supplements.
1318.407EIS adoption.
Subpart F--Miscellaneous Procedures
1318.500Public participation.
1318.501Mitigation commitment identification, auditing, and reporting.
1318.502Tiering.
1318.503Programmatic and generic NEPA documents.
1318.504Private applicants.
1318.505Non-TVA EISs.
1318.506Documents.
1318.507Reducing paperwork and delay.
1318.508Supplemental guidance.
1318.509Substantial compliance.
1318.510Emergency actions.
1318.511Modification of assignments.
1318.512Status reports.
Subpart G--Floodplains and Wetlands
1318.600Purpose and scope.
1318.601Area of impact.
1318.602Actions that will affect floodplains or wetlands.
1318.603Public notice.
1318.604Disposition of real property.
1318.605General and class reviews.
Authority:42 U.S.C. 4321 et seq.
Subpart A--General Information
This part establishes procedures for
(a) The National Environmental Policy Act (NEPA) of 1969, as amended (42 U.S.C. 4321 et seq.);
(b) Other applicable guidelines, regulations and Executive orders implementing NEPA; and
(c)
It is the policy of
(a)
(b) Commencing at the earliest possible point and continuing through implementation, appropriate and careful consideration of the environmental aspects of proposed actions is built into the decision-making process in order that adverse environmental effects may be avoided or minimized, consistent with the requirements of NEPA.
(c) Environmental reviews under NEPA will assist decision makers in making better, more knowledgeable decisions that consider those reasonable alternatives to the proposed action that fulfill the purpose and need for the action, concisely present the environmental impacts and other information regarding the proposed action and its alternatives, are consistent with the environmental importance of the action, concentrate on truly significant environmental issues, and are practicable.
(a) CE--Categorical Exclusion
(b) CEQ--Council on Environmental Quality
(c) DEIS--Draft Environmental Impact Statement
(d) EA--Environmental Assessment
(e) EIS--Environmental Impact Statement
(f)
(g) FEIS--Final Environmental Impact Statement
(h) FONSI--Finding of No Significant Impact
(i) NEPA--National Environmental Policy Act
(j) ROD--Record of Decision
(k) TVA--
The following definitions apply throughout this part. All other applicable terms should be given the same meaning as set forth in CEQ's currently effective regulations (40 CFR part 1508) unless such a reading would make the terms inconsistent with the context in which they appear.
Controversial refers to scientifically supported commentary that casts substantial doubt on the agency's methodology or data, but does not mean commentary expressing mere opposition.
Floodplain refers to the lowland and relatively flat areas adjoining flowing inland waters and reservoirs. Floodplain generally refers to the base floodplain, i.e., that area subject to a 1 percent or greater chance of flooding in any given year.
Important farmland includes prime farmland, unique farmland, and farmland of statewide importance as defined in 7 CFR part 657.
Natural and beneficial floodplain and wetland values refer to such attributes as the capability of floodplains and wetlands to provide natural moderation of floodwaters, water quality maintenance, fish and wildlife habitat, plant habitat, open space, natural beauty, scientific and educational study areas, and recreation.
Official responsible for NEPA compliance refers to the
Practicable, as used in subpart G of this part, refers to the capability of an action being performed within existing constraints. The test of what is practicable depends on the situation and includes an evaluation of all pertinent factors, such as environmental impact, economic costs, statutory authority, legality, technological achievability, and engineering constraints.
Wetland refers to an area inundated by surface or ground water with a frequency sufficient to support, and that under normal circumstances does or would support, a prevalence of vegetation or aquatic life that requires saturated or seasonally saturated soil conditions for growth and reproduction. Wetlands do not include temporary human-made ponds associated with active construction projects.
Subpart B--Initiating the NEPA Process
(a) Each office, group, or department ("entity") within
(b) Environmental analyses should be included in or circulated with and reviewed at the same time as other planning documents. This responsibility is to be carried out in accordance with the environmental review procedures contained herein.
(c)
(a) NEPA applies to proposed actions with potential impacts on the human environment that would result in a non-trivial change to the environmental status quo.
(b) At the earliest possible time, the
(c) The level of review will be in one of the following categories: Categorical Exclusions, Environmental Assessments, and Environmental Impact Statements.
(d) The NEPA compliance staff shall determine whether the action is already covered under an existing NEPA review, including a programmatic or generic review. Before such an action proceeds, the NEPA compliance staff shall evaluate and adequately document whether the new action is essentially similar to the previously analyzed action, the alternatives previously analyzed are adequate for the new action, there are significant new circumstances or information relevant to environmental concerns that would substantially change the analysis in the existing NEPA review, and there are effects that would result from the new action that were not addressed in the previous analysis
(e) NEPA and its implementing regulations (both CEQ's and
(f)
Subpart C--Categorical Exclusions
(a) Categories of actions addressed in this section are those that do not normally have, either individually or cumulatively, a significant impact on the human environment and therefore do not require the preparation of an EA or an EIS.
(b) The
(c) In order to find that a proposal can be categorically excluded,
(d) The actions listed in appendix A of this part are classes of actions that
(e) The use of a categorical exclusion for an action does not relieve
(a) An action that would normally qualify as a categorical exclusion must not be so classified if an extraordinary circumstance is present and cannot be mitigated, including through the application of other environmental regulatory processes. In order to determine whether extraordinary circumstances exist,
(1) The action has the potential to significantly impact environmental resources, including the following resources:
(i) Species listed or proposed to be listed under the Endangered Species Act, or the proposed or designated Critical Habitat for these species,
(ii) Wetlands or floodplains,
(iii) Cultural or historical resources,
(iv) Areas having special designation or recognition such as wild and scenic rivers, parklands, or wilderness areas, and
(v) Important farmland; and
(2) The significance of the environmental impacts associated with the proposed action is or may be highly controversial.
(b) The mere presence of one or more of the resources under paragraph (a)(1) of this section does not by itself preclude use of a categorical exclusion. Rather, the determination that extraordinary circumstances are present depends upon the finding of a causal relationship between a proposed action and the potential effect on these resource conditions, and, if such a relationship exists, the degree of the potential effect of a proposed action on these resource conditions.
Appendix A to Subpart C of Part 1318--Categorical Exclusions
The
1. Educational or informational activities undertaken by
2. Technical and planning assistance provided to State, local and private organizations and entities.
3. Personnel actions.
4. Procurement actions.
5. Accounting, auditing, financial reports and disbursement of funds.
6. Contracts or agreements for the sale, purchase, or interchange of electricity.
7. Administrative actions consisting solely of paperwork.
8. Communication, transportation, computer service and office services.
9. Property protection activities that do not physically alter facilities or grounds, law enforcement and other legal activities.
10. Emergency preparedness actions not involving the modification of existing facilities or grounds.
11. Minor actions to address threats to public health and safety, including, but not limited to, temporary prohibition of existing uses of
12. Site characterization, data collection, inventory preparation, planning, monitoring, and other similar activities that have little to no physical impact.
13. Engineering and environmental studies that involve minor physical impacts, including but not limited to, geotechnical borings, dye-testing, installation of monitoring stations and groundwater test wells, and minor actions to facilitate access to a site.
14. Conducting or funding minor research, development and demonstration projects and programs.
15. Reserved.
16. Construction of new transmission line infrastructure, including electric transmission lines generally no more than 10 miles in length and that require no more than 125 acres of new developed rights-of-way and no more than 1 mile of new access road construction outside the right-of-way; and/or construction of electric power substations or interconnection facilities, including switching stations, phase or voltage conversions, and support facilities that generally require the physical disturbance of no more than 10 acres.
17. Routine modification, repair, and maintenance of, and minor upgrade of and addition to, existing transmission infrastructure, including the addition, retirement, and/or replacement of breakers, transformers, bushings, and relays; transmission line uprate, modification, reconductoring, and clearance resolution; and limited pole replacement. This exclusion also applies to improvements of existing access roads and construction of new access roads outside of the right-of-way that are generally no more than 1 mile in length.
18. Construction, modification and operation of communication facilities and/or equipment, including power line carriers, insulated overhead ground wires/fiber optic cables, devices for electricity transmission control and monitoring, VHF radios, and microwaves and support towers.
19. Removal of conductors and structures, and/or the cessation of right-of-way vegetation management, when existing transmissions lines are retired; or the rebuilding of transmission lines within or contiguous to existing rights-of-way involving generally no more than 25 miles in length and no more than 125 acres of expansion of the existing right-of-way.
20. Purchase, conveyance, exchange, lease, license, and/or disposal of existing substations, substation equipment, switchyards, and/or transmission lines and rights-of-way and associated equipment between
21. Purchase or lease and subsequent operation of existing combustion turbine or combined-cycle plants for which there is existing adequate transmission and interconnection to the
22. Development of dispersed recreation sites (generally not to exceed 10 acres in size) to support activities such as hunting, fishing, primitive camping, wildlife observation, hiking, and mountain biking. Actions include, but are not limited to, installation of guardrails, gates and signage, hardening and stabilization of sites, trail construction, and access improvements/controls.
23. Development of public use areas that generally result in the physical disturbance of no more than 10 acres, including, but not limited to, construction of parking areas, campgrounds, stream access points, and day use areas.
24. Minor actions conducted by non-
25. Transfer, lease, or disposal (sale, abandonment or exchange) of (a) minor tracts of land, mineral rights, and landrights, and (b) minor rights in ownership of permanent structures.
26. Approvals under Section 26a of the TVA Act of minor structures, boat docks and ramps, and shoreline facilities.
27. Installation of minor shoreline structures or facilities, boat docks and ramps, and actions to stabilize shoreline (generally up to 1/2 mile in length) by
28. Minor modifications to land use allocations outside of a normal land planning cycle to: Rectify administrative errors; incorporate new information that is consistent with a previously approved decision included in the land use plan; or implement
29. Actions to restore and enhance wetlands, riparian, and aquatic ecosystems that generally involve physical disturbance of no more than 10 acres, including, but not limited to, construction of small water control structures; revegetation actions using native materials; construction of small berms, dikes, and fish attractors; removal of debris and sediment following natural or human-caused disturbance events; installation of silt fences; construction of limited access routes for purposes of routine maintenance and management; and reintroduction or supplementation of native, formerly native, or established species into suitable habitat within their historic or established range.
30. Actions to maintain, restore, or enhance terrestrial ecosystems that generally involve physical disturbance of no more than 125 acres, including, but not limited to, establishment and maintenance of non-invasive vegetation; bush hogging; prescribed fires; installation of nesting and roosting structures, fencing, and cave gates; and reintroduction or supplementation of native, formerly native, or established species into suitable habitat within their historic or established range.
31. The following forest management activities:
a. Actions to manipulate species composition and age class, including, but not limited to, harvesting or thinning of live trees and other timber stand improvement actions (e.g., prescribed burns, non-commercial removal, chemical control), generally covering up to 125 acres and requiring no more than 1 mile of temporary or seasonal permanent road construction;
b. Actions to salvage dead and/or dying trees including, but not limited to, harvesting of trees to control insects or disease or address storm damage (including removal of affected trees and adjacent live, unaffected trees as determined necessary to control the spread of insects or disease), generally covering up to 250 acres and requiring no more than 1 mile of temporary or seasonal permanent road construction; and
c. Actions to regenerate forest stands, including, but not limited to, planting of native tree species upon site preparation, generally covering up to 125 acres and requiring no more than 1 mile of temporary or seasonal permanent road construction.
32. Actions to manage invasive plants including, but not limited to, chemical applications, mechanical removal, and manual treatments that generally do not physically disturb more than 125 acres of land.
33. Actions to protect cultural resources including, but not limited to, fencing, gating, signing, and bank stabilization (generally up to 1/2 mile in length when along stream banks or reservoir shoreline).
34. Reburial of human remains and funerary objects under the Native American
35. Installation or modification (but not expansion) of low-volume groundwater withdrawal wells (provided that there would be no drawdown other than in the immediate vicinity of the pumping well and that there is no potential for long-term decline of the water table or degradation of the aquifer), or plugging of groundwater or other wells at the end of their operating life. Site characterization must verify a low potential for seismicity, subsidence, and contamination of freshwater aquifers.
36. Routine operation, repair or in-kind replacement, and maintenance actions for existing buildings, infrastructure systems, facility grounds, public use areas, recreation sites, and operating equipment at or within the immediate vicinity of
a. Regular servicing of in-plant and on-site equipment (including during routine outages) such as gear boxes, generators, turbines and bearings, duct work, conveyers, and air preheaters; fuel supply systems; unloading and handling equipment for fuel; handling equipment for ash, gypsum or other by-products or waste; hydropower, navigation and flood control equipment; water quality and air emissions control or reduction equipment; and other operating system or ancillary components that do not increase emissions or discharges beyond current permitted levels;
b. Regular servicing of power equipment and structures within existing transmission substations and switching stations;
c. Routine testing and calibration of facility components, subsystems, or portable equipment (such as control valves, in-core monitoring devices, transformers, capacitors, monitoring wells, weather stations, and flumes);
d. Routine cleaning and decontamination, including to surfaces of equipment, rooms, and building systems (including HVAC, septic systems, and tanks);
e. Repair or replacement of plumbing, electrical equipment, small HVAC systems, sewerage, pipes, and telephone and other communication service;
f. Repair or replacement of doors, windows, walls, ceilings, roofs, floors and lighting fixtures in structures less than 50 years old;
g. Painting and paint removal at structures less than 50 years old, including actions taken to contain, remove, or dispose of lead-based paint when in accordance with applicable requirements;
h. Recycling and/or removal of materials, debris, and solid waste from facilities, in accordance with applicable requirements;
i. Groundskeeping actions, including mowing and landscaping, snow and ice removal, application of fertilizer, erosion control and soil stabilization measures (such as reseeding and revegetation), removal of dead or undesirable vegetation with a diameter of less than 3 inches (at breast height), and leaf and litter collection and removal;
j. Repair or replacement of gates and fences;
k. Maintenance of hazard buoys;
l. Maintenance of groundwater wells, discharge structures, pipes and diffusers;
m. Maintenance and repair of process, wastewater, and stormwater ponds and associated piping, pumping, and treatment systems;
n. Maintenance and repair of subimpoundments and associated piping and water control structures;
o. Debris removal and maintenance of intake structures and constructed intake channels including sediment removal to return them to the originally-constructed configuration; and
p. Clean up of minor spills as part of routine operations.
37. Modifications, upgrades, uprates, and other actions that alter existing buildings, infrastructure systems, facility grounds, and plant equipment, or their function, performance, and operation. Such actions, which generally will not physically disturb more than 10 acres, include but are not limited to, the following:
a. Replacement or changes to major components of existing buildings, facilities, infrastructure systems, facility grounds, and equipment that are like-kind in nature;
b. Modifications, improvements, or operational changes to in-plant and on-site equipment that do not substantially alter emissions or discharges beyond current permitted limits. Examples of equipment include, but are not limited to: Gear boxes, generators, turbines and bearings, duct work, conveyers, superheaters, economizers, air preheaters, unloading and handling equipment for fuel; handling equipment for ash, gypsum or other by-products or waste; hydropower, navigation and flood control equipment; air and water quality control equipment; control, storage, and treatment systems (e.g. automation, alarms, fire suppression, ash ponds, gypsum storage, and ammonia storage and handling systems); and other operating system or ancillary components;
c. Installation of new sidewalks, fencing, and parking areas at an existing facility;
d. Installation or upgrades of large HVAC systems;
e. Modifications to water intake and outflow structures provided that intake velocities and volumes and water effluent quality and volumes are consistent with existing permit limits;
f. Repair or replacement of doors, windows, walls, ceilings, roofs, floors and lighting fixtures in structures greater than 50 years old; and
g. Painting and paint removal at structures greater than 50 years old, including actions taken to contain, remove and dispose of lead-based paint when in accordance with applicable requirements.
38. Siting, construction, and use of buildings and associated infrastructure (e.g., utility lines serving the building), physically disturbing generally no more than 10 acres of land not previously disturbed by human activity or 25 acres of land so disturbed.
39. Siting and temporary placement and operation of trailers, prefabricated and modular buildings, or tanks on previously disturbed sites at an existing
40. Demolition and disposal of structures, buildings, equipment and associated infrastructure and subsequent site reclamation, subject to applicable review for historical value, on sites generally less than 10 acres in size.
41. Actions to maintain roads, trails, and parking areas (including resurfacing, cleaning, asphalt repairs, and placing gravel) that do not involve new ground disturbance (i.e., no grading).
42. Improvements to existing roads, trails, and parking areas, including, but not limited to, scraping and regrading; regrading of embankments; installation or replacement of culverts; and other such minor expansions.
43. Actions to enhance and control access to
44. Small-scale, non-emergency cleanup of solid waste or hazardous waste (other than high-level radioactive waste and spent nuclear fuel) to reduce risk to human health or the environment. Actions include collection and treatment (such as incineration, encapsulation, physical or chemical separation, and compaction), recovery, storage, or disposal of wastes at existing facilities currently handling the type of waste involved in the action.
45. Installation, modification, and operation of the following types of renewable or waste-heat recovery energy projects which increase generating capacity at an existing
a. Combined heat and power or cogeneration systems at existing buildings or sites; and
b. Solar photovoltaic systems mounted on the ground, an existing building or other structure (such as a rooftop, parking lot or facility and mounted to signage lighting, gates or fences).
46. Transactions (contracts or agreements) for purchase of electricity from new methane gas electric generating systems using commercially available technology and installed within an area previously developed or disturbed by human activity.
47. Modifications to the
48. Financial and technical assistance for programs conducted by non-
49. Financial assistance including, but not limited to, approving and administering grants, loans and rebates for the renovation or minor upgrading of existing facilities, established or developing industrial parks, or existing infrastructure; the extension of infrastructure; geotechnical boring; and construction of commercial and light industrial buildings. Generally, such assistance supports actions that physically disturb no more than 10 acres of land not previously disturbed by human activity or no more than 25 acres of land so disturbed.
50. Financial assistance for the following actions: Approving and administering grants, loans and rebates for continued operations or purchase of existing facilities and infrastructure for uses substantially the same as the current use; purchasing, installing, and replacing equipment or machinery at existing facilities; and completing engineering designs, architectural drawings, surveys, and site assessments (except when tree clearing, geotechnical boring, or other land disturbance would occur).
Subpart D--Environmental Assessments
(a)
(b) An EA shall concisely communicate information and analyses about issues that are potentially significant and reasonable alternatives.
(a) The NEPA compliance staff, in consultation with the initiating
(b)
(c) A draft EA prepared for an action listed in
(d)
(a) As soon as practicable after deciding to prepare an EA, the initiating
(1) Reasonable alternatives,
(2) Permit requirements,
(3) Coordination with other agencies (consistent with
(4) Environmental issues,
(5) Public involvement, and
(6) A schedule for EA preparation.
(b) The EA will describe the proposed action and include brief discussions of the purpose and need for action, reasonable alternatives, the no-action alternative (consistent with
(c) As appropriate, EAs will identify alternatives that were considered, but not addressed in further detail in the EA.
(d) The EA will address comments made during any public comment period.
(e) The EA will briefly provide sufficient data and analysis for determining whether to prepare an EIS or a FONSI.
(f) The EA will be reviewed by the NEPA compliance staff and other interested
(g) After the EA is finalized and with the concurrence of
(1) A Finding of No Significant Impact,
(2) The action requires the preparation of an EIS, or
(3) The EA needs to be supplemented before the significance of potential impacts can be determined.
(a) If the NEPA compliance staff concludes, based on an EA, that a proposed action does not require the preparation of an EIS, the NEPA compliance staff, in consultation with
(b) A FONSI must concisely summarize the proposed action and the EA, which should be incorporated by reference, and identify any environmental mitigation measures to which
(c) A FONSI must be made available to the public.
(d) In the following circumstance, the NEPA compliance staff, in consultation with
(1) The proposed action is, or is closely similar to, an action listed in
(2)
(3) The nature of the proposed action is one without precedent.
(a) If new information concerning action modifications, alternatives, or probable environmental effects becomes available and there are important components of the proposed action that remain to be implemented, the NEPA compliance staff and
(b)
Subpart E--Environmental Impact Statements
(a) The following actions in paragraphs (a)(1) through (5) normally will require an EIS:
(1) New large water resource development and water control projects such as construction and operation of new dams or navigation locks.
(2) The construction and operation of new major power generating facilities at sites not previously used for industrial purposes.
(3) The development of integrated resource plans for power generation.
(4) The development of system-wide reservoir operations plans.
(5) Any major action whose environmental impacts are expected to be highly controversial.
(b) If TVA determines that an EIS will not be prepared for an action falling within one of these categories, the basis for the decision must be discussed in the environmental assessment or in a document that is made available to the public.
(c) An EIS shall describe the proposed action and reasonable alternatives, including no action; analyze the potential environmental impacts associated with the proposed action, alternatives, and identify any mitigation measures; and include a list of the major preparers of the EIS.
(d) The scope and detail of the EIS shall be reasonably related to the scope and the probable environmental impacts of the proposed action and alternative actions (see 40 CFR 1502.10 through 1502.18).
(e) The no-action alternative in an EIS (or an EA) should represent the environmental status quo and should be formulated to provide the environmental baseline from which the proposed action and other alternatives can be assessed even when
(a) As soon as practicable after the decision is made to prepare an EIS (or EA), the NEPA compliance staff, in consultation with the initiating
(b) If TVA is requested to participate in the preparation of an EIS (or EA) of another Federal agency, the NEPA compliance staff, in consultation with other interested
(a) As soon as practicable after the decision to prepare an EIS is made, the NEPA compliance staff, in consultation with other
(b) The scoping process may include interagency scoping sessions to coordinate an action with and obtain inputs from other interested agencies (including local, State, and other Federal agencies, as well as Indian tribes).
(c) The NEPA compliance staff, in consultation with other
(d) As soon as practicable in the scoping process, the NEPA compliance staff, in consultation with the initiating
(e) There will be a minimum public comment period of 30 days from the date of publication of the notice of intent in the
(f) On the basis of input received, the NEPA compliance staff, in consultation with other
(g) At the close of the scoping process, the NEPA compliance staff, in consultation with the other
(1) Purpose and need of the proposed action.
(2) Reasonable action alternatives.
(3) Environmental issues to be addressed in detail.
(4) Environmental issues that should be mentioned but not addressed in detail.
(5) Lead and cooperating agency roles and responsibilities.
(6) Related environmental documents.
(7) Other environmental review and consultation requirements.
(8) Delegation of DEIS work assignments to
(h) If a scoping report summarizing the preceding EIS components is prepared, it must be made available to the public.
(a) Based on information obtained and decisions made during the scoping process, the NEPA compliance staff, in cooperation with the initiating
(b) During preparation of the DEIS, the NEPA compliance staff will involve any cooperating agencies to obtain their input. If a cooperating agency's analysis of an environmental issue or impact differs from
(c) After approval of the DEIS by the official responsible for NEPA compliance, the senior manager of the initiating
(d)
(e) A minimum of 45 days from the date of publication of the notice of availability in the
(f) Materials to be made available to the public should be provided to the public without charge to the extent practicable.
(a) At the close of the DEIS public comment period, the NEPA compliance staff, in consultation with the initiating
(b) If changes to the DEIS in response to comments are minor and confined to factual corrections or explanations of why the comments do not warrant additional
(c) The FEIS should address all substantive comments on the DEIS that
(d) After approval of the FEIS by the official responsible for NEPA compliance, the senior manager of the initiating
(e)
(a)
(b) After release of the FEIS and after
(1) The decision;
(2) The basis for the decision and preferences among alternatives;
(3) The alternative(s) considered to be environmentally preferable;
(4) A summary of important environmental impacts;
(5) The monitoring, reporting, and administrative arrangements that have been made; and
(6) The measures that would mitigate or minimize adverse environmental impacts to which
(c) A ROD will be made available to the public.
(d) Until a ROD is made available to the public, no action should be taken to implement an alternative that would have adverse environmental impacts or limit the choice of reasonable alternatives.
If
(a)
(b) If the NEPA compliance staff determines that the actions covered by the other agency's EIS and
(c) If the NEPA compliance staff determines that the actions covered by the other agency's EIS and
(d) If TVA cooperated in the preparation of an EIS that
(e) If TVA did not cooperate in the preparation of an EIS that
(f)
Subpart F--Miscellaneous Procedures
(a)
(b) The type of and format for public participation will be selected as appropriate to best facilitate timely and meaningful public input.
(c)
(d) When opportunities for public participation are provided,
(a) All appropriate measures to mitigate expected significant adverse environmental impacts ("mitigation measures") must be identified in an EA or EIS. Those mitigation measures to which
(b) Each mitigation commitment that is not required under regulations will be assigned by the NEPA compliance staff to the
(c) The responsible entity shall report to the NEPA compliance staff the status of mitigation commitments periodically or whenever a specific request is made.
(d) The NEPA compliance staff must ensure that commitments are met and will verify commitment progress.
(e) Circumstances may arise that warrant modifying or cancelling previously made commitments. The decision to modify or cancel a commitment will be made by the NEPA compliance staff in consultation with
(a) A programmatic or generic EA or EIS may be prepared to address a proposed program, policy, or plan, or a proposed action that has a wide geographic scope.
(b) A programmatic EA or EIS can support high-level or broad decisionmaking, and can provide the foundation for the efficient review of specific tiered implementing actions.
(c) Ongoing or previously planned and approved actions that are within the scope of a programmatic review may continue during the programmatic review period, so long as the criteria at 40 CFR 1506.1(c) are met.
(d) The identification of significant impacts in a programmatic EIS does not preclude the review of specific implementing actions in an EA that tiers from the programmatic EIS if the implementing actions would not result in new or different significant impacts.
(a) When a private applicant, individual, or other non-Federal entity ("private entity") proposes to undertake an action that will require
(b)
(c) In identifying reasonable alternatives,
(d) A private entity may be allowed to prepare draft and final EAs for
(e) A private entity normally will be required to reimburse
(f) Participation of a private entity in a TVA NEPA review, including reimbursement of
(a) The NEPA compliance staff, in consultation with other interested
(b) The NEPA compliance staff, in consultation with
The NEPA compliance staff must keep on file all final and approved environmental documents either in paper form or electronically, in accordance with
(a) These procedures are to be interpreted and applied with the aim of reducing paperwork and the delay of both the assessment and implementation of a proposed action.
(b) Data and analyses should be commensurate with the importance of associated impacts. Less important material should be summarized, consolidated, or referenced.
(c) An environmental document may be combined with any other document to reduce duplication and paperwork.
(d) Review of a proposed action under these procedures may be consolidated with other reviews where such consolidation would reduce duplication or increase efficiency.
The NEPA compliance staff, in consultation with interested
Substantial compliance with these procedures must be achieved. Minor deviations approved by the official responsible for NEPA compliance do not give rise to any independent cause of action.
(a) The NEPA compliance staff may consolidate, modify, or omit provisions of these procedures for actions necessary in an emergency.
(b) Where emergency circumstances make it necessary to take an action with significant environmental impact without observing the provisions of these regulations,
(c) The NEPA compliance staff, with the concurrence of
(d) The official responsible for NEPA compliance shall document the determination that an emergency exists and describe the responsive action(s) taken at the time the emergency exists. The form of that documentation is within the discretion of that official.
The assignments and responsibilities identified for
Information on the status of EISs and EAs under development shall be published on
Subpart G--Floodplains and Wetlands
(a) The review of a proposed action undertaken in accordance with [Sec.]
(b) Floodplain evaluations must apply any existing Federal flood risk management standard to federally-funded projects.
(c) A wetland evaluation under Executive Order 11990 is not required for the issuance of permits, licenses, or allocations to private parties for activities involving wetlands on non-Federal lands.
(a) If a proposed action will potentially occur in or affect wetlands or floodplains, the initiating
(b) Further floodplain or wetland evaluation is unnecessary if the
(1) Is outside the floodplain or wetland,
(2) Has no identifiable impacts on a floodplain or wetland, and
(3) Does not directly or indirectly support floodplain development or wetland alteration.
(a) When a proposed action can otherwise be categorically excluded under
(1) The initiating
(2) The
(b) If the action requires an EA or an EIS, the evaluation must consider:
(1) The effect of the proposed action on natural and beneficial floodplain and wetland values and
(2) Alternatives to the proposed action that would eliminate or minimize such effects.
(c) The initiating
(a) Once a determination of no practicable alternative is made in accordance with
(b) Public notices must at a minimum:
(1) Briefly describe the proposed action and the potential impact on the floodplain or wetland;
(2) Briefly identify alternative actions considered and explain why a determination of no practicable alternative has been proposed;
(3) Briefly discuss measures that would be taken to minimize or mitigate floodplain or wetland impacts;
(4) State when appropriate whether the action conforms to applicable Federal, State or local floodplain protection standards;
(5) Specify a reasonable period of time within which the public can comment on the proposal; and
(6) Identify the
(c) Such notices must be issued in a manner designed to bring the proposed action to the attention of those members of the public likely to be interested in or affected by the action's potential impact on the floodplain or wetland.
(d)
When
(a) Require the other party to comply with all applicable Federal, State or local floodplain and wetland regulations, and
(b) Identify other appropriate restrictions to minimize destruction, loss, or degradation of floodplains and wetlands and to preserve and enhance their natural and beneficial values, except when prohibited by law or unenforceable by
In lieu of site-specific reviews,
Vice President, Environment.
[FR Doc. 2020-05964 Filed 3-26-20;
BILLING CODE 8120-08-P


Maine Gov. Mills Administration Takes Steps to Support Nursing Homes in Response to COVID-19
Coalition Against Insurance Fraud: COVID-19 May Spark Insurance Scam Surge
Advisor News
- CT governor’s candidates claims: What’s true, and what’s misleading
- Retaining clients by giving them a memorable experience
- Addressing the longevity paradox
- Employers shift focus from retirement access to financial outcomes
- Helping widowed clients navigate their new financial reality
More Advisor NewsAnnuity News
- Foresters Financial appoints Tom Ross as chief distribution officer for U.S. annuity sales
- Symetra and TIAA Announce Launch of Mariner Re
- Jackson Launches Suite of Fixed Index Annuities Focused on Accumulation
- Farm Bureau P&C insurers post first underwriting gain since 2021
- Legacy Marketing, Malibu Life launch two fixed indexed annuities
More Annuity NewsHealth/Employee Benefits News
- NC's State Health Plan taps retiree funds amid cash crisis, reaches deal with Atrium Health
- Study: Colorado’s Medicaid covers more services than private insurance
- Studies from Northwell Health Describe New Findings in Managed Care (The Relative Value Scale Update Committee: Understanding How Dermatologists’ Work Is Valued): Managed Care
- Hofstra University Details Findings in Managed Care (A University and Community Partnership to Address Diaper Insecurity Among Infants in Suburban Communities Through Home Visiting Services): Managed Care
- Reports Outline Managed Care Study Results from Brown University School of Public Health (Organizational Perspectives on Access to Care Among Persons With End-Stage Kidney Disease After Enrollment in Medicare Advantage): Managed Care
More Health/Employee Benefits NewsLife Insurance News