SSR Mining Reports Third Quarter 2017 Results
Third Quarter 2017 Highlights:
(All figures are in
- Increased cash position: Quarter-end cash increased to
$424.0 million , up$70.5 million over the previous quarter, marking this as the eighth consecutive quarter of increased cash. - Solid operating cash flow: Cash generated by operating activities totaled
$30.3 million for the quarter and$99.6 million year-to-date. - Net Income: Attributable net income for the quarter was
$1.1 million , or$0.01 per share, with adjusted net income totaling$4.4 million , or$0.04 per share.
- Delivered Seabee mine expansion plan: Seabee PEA evaluates sustained milling rate of 1,050 tonnes per day for a seven-year mine life with average 100,000 ounces of gold per year, a 29% increase from 2016 production, at lower cash costs over the period from 2018 to 2023.
- Strong operating performance at Seabee: Sustained daily throughput and recovery rates generated solid gold production, positioning Seabee to achieve previously improved annual production and cash costs guidance.
- Record quarterly material moved at Marigold: Mined over 20 million tonnes of material at
$1.52 per tonne during the quarter with ore stacked increasing to over 7 million tonnes. - Puna Operations exceeds expectations: The Pirquitas mill operated at a rate of approximately 5,000 tonnes per day, with higher than expected grades resulting in production of 1.5 million ounces of silver during the quarter and 5.0 million ounces year-to-date, surpassing the lower end of annual production guidance. The operation is on track to achieve annual cash costs guidance.
Marigold mine,
|
Three months ended |
||||||||||
|
Operating data |
|
|
|
|
|
|||||
|
Total material mined (kt) |
20,311 |
17,985 |
16,736 |
19,559 |
19,558 |
|||||
|
Waste removed (kt) |
13,149 |
11,075 |
11,062 |
13,123 |
14,741 |
|||||
|
Total ore stacked (kt) |
7,162 |
6,910 |
5,674 |
6,436 |
4,817 |
|||||
|
Strip ratio |
1.8 |
1.6 |
1.9 |
2.0 |
3.1 |
|||||
|
Mining costs ($/t mined) |
1.52 |
1.67 |
1.65 |
1.52 |
1.48 |
|||||
|
Gold stacked grade (g/t) |
0.31 |
0.31 |
0.42 |
0.48 |
0.42 |
|||||
|
Processing costs ($/t processed) |
0.89 |
0.82 |
0.89 |
0.80 |
0.95 |
|||||
|
Gold recovery (%) |
72.0 |
73.0 |
74.0 |
75.0 |
71.0 |
|||||
|
General and admin costs ($/t processed) |
0.40 |
0.42 |
0.52 |
0.46 |
0.56 |
|||||
|
Gold produced (oz) |
38,699 |
55,558 |
55,215 |
59,945 |
47,456 |
|||||
|
Gold sold (oz) |
38,818 |
57,426 |
52,528 |
61,308 |
47,278 |
|||||
|
Realized gold price ($/oz) (1) |
1,270 |
1,265 |
1,214 |
1,247 |
1,330 |
|||||
|
Cash costs ($/oz) (1) |
684 |
632 |
585 |
585 |
636 |
|||||
|
|
979 |
833 |
799 |
835 |
1,139 |
|||||
|
Financial data ($000s) |
||||||||||
|
Revenue |
49,395 |
72,451 |
63,762 |
77,047 |
62,831 |
|||||
|
Income from mine operations |
11,189 |
21,373 |
21,327 |
28,648 |
23,156 |
|||||
|
Capital expenditures |
3,855 |
5,272 |
3,043 |
3,271 |
8,310 |
|||||
|
Capitalized stripping |
6,056 |
4,350 |
6,745 |
10,171 |
13,787 |
|||||
|
Exploration expenditures (2) |
1,130 |
1,538 |
1,024 |
1,276 |
1,145 |
|||||
|
(1) |
We report the non-GAAP financial measures of realized gold prices, cash costs and all-in sustaining costs ("AISC") per payable ounce of gold sold to manage and evaluate operating performance at the Marigold mine. For a better understanding and a reconciliation of these measures to cost of sales, as shown in our consolidated statements of comprehensive income (loss), please refer to "Non-GAAP and Additional GAAP Financial Measures" in section 12 of our management's discussion and analysis of the financial position and results of operation for the three and nine months ended |
|
(2) |
Includes capitalized and expensed exploration expenses. |
Mine production
In the third quarter of 2017, the Marigold mine produced 38,699 ounces of gold, 30.3% less than the previous quarter due to lower grades of ore stacked as we began mining the upper benches of the current phase of the Mackay pit. Additionally, within these upper benches more clay ore was encountered than anticipated which negatively impacted the leaching cycle as the solution pumping rate was decreased to eliminate ponding in certain low permeability areas on the pads.
A quarterly record of 20.3 million tonnes of material was mined in the third quarter of 2017, 13% more than the second quarter of 2017, primarily due to planned shorter hauls for waste. Approximately 7.2 million tonnes of ore were delivered to the heap leach pads at an average gold grade of 0.31 g/t. This compares to 6.9 million tonnes of ore delivered to the heap leach pads at a gold grade of 0.31 g/t in the second quarter of 2017. The strip ratio was 1.8:1 for the quarter, a 13% increase compared to the previous quarter.
Mine operating costs
Cash costs and
Cash costs, which include all costs of inventory, refining costs and royalties, of
Mine sales
A total of 38,818 ounces of gold were sold at an average price of
Exploration
Exploration activities continued with the objective of Mineral Reserve growth in proximity to, and within, existing open pits. During the third quarter of 2017, we completed 13,167 meters of drilling in 39 reverse circulation ("RC") holes at the
On
In the third quarter of 2017, we also received results that indicate a higher grade zone exists 200 meters west of our current Mineral Resource pit at Red Dot. At our North Red Dot target, drillhole MRA6512 intersected 50.3 meters at a grade of 0.95 g/t gold within an area currently modeled as narrow lower grade mineralization.
See in this news release Table 1 for selected exploration results, Table 3 for drill results and Table 4 for a list of all drillholes completed for the relevant period.
Seabee Gold Operation,
|
Three months ended |
||||||
|
Operating data
|
|
|
|
|
|
|
|
Total ore milled (t) |
84,315 |
84,469 |
72,394 |
84,526 |
82,756 |
|
|
Ore milled per day (t/day) |
916 |
928 |
804 |
919 |
900 |
|
|
Gold mill feed grade (g/t) |
7.03 |
7.97 |
9.22 |
7.40 |
7.40 |
|
|
Mining costs ($/t mined) |
74 |
60 |
68 |
62 |
58 |
|
|
Processing costs ($/t processed) |
22 |
20 |
23 |
19 |
19 |
|
|
Gold recovery (%) |
97.2 |
97.3 |
97.7 |
97.0 |
96.5 |
|
|
General and admin costs ($/t |
53 |
50 |
59 |
44 |
37 |
|
|
Gold produced (oz) |
18,058 |
20,690 |
21,023 |
19,711 |
20,142 |
|
|
Gold sold (oz) |
21,798 |
17,909 |
22,411 |
17,229 |
21,911 |
|
|
Realized gold price ($/oz) (1) |
1,269 |
1,257 |
1,233 |
1,230 |
1,334 |
|
|
Cash costs ($/oz) (1, 3) |
634 |
592 |
574 |
595 |
661 |
|
|
|
775 |
831 |
990 |
833 |
841 |
|
|
Financial data ($000s) |
||||||
|
Revenue |
27,652 |
22,502 |
27,609 |
21,175 |
29,214 |
|
|
Income from mine operations |
3,643 |
4,083 |
4,995 |
2,864 |
4,126 |
|
|
Capital expenditures |
799 |
711 |
4,760 |
1,010 |
579 |
|
|
Capitalized development |
1,314 |
2,165 |
2,514 |
2,432 |
2,141 |
|
|
Exploration expenditures (2) |
1,253 |
1,566 |
1,953 |
829 |
1,206 |
|
|
(1) |
We report the non-GAAP financial measures of realized gold prices, cash costs and |
|
(2) |
Includes capitalized and expensed exploration expenses. |
|
(3) |
The non-GAAP financial measures of cash costs per payable ounce of gold sold and |
Mine production
In the third quarter of 2017, the Seabee Gold Operation produced 18,058 ounces of gold, a strong result considering several operating interruptions.
During the third quarter, 84,315 tonnes of ore were milled at an average gold grade of 7.03 g/t. This compares to a total of 84,469 tonnes of ore at an average grade of 7.97 g/t in the second quarter. The Santoy mine supplied 85% of ore milled, predominantly from long hole stopes. Underground mining activities at Santoy experienced operating interruptions during the third quarter as a result of forest-fire-related power outages and smoke ingress.
The mill achieved an average throughput of 916 tonnes per day during the quarter, 1.3% lower than the previous quarter due to a combination of scheduled crusher maintenance activities and forest-fire-related power outages.
Mine operating costs
Cash costs and
Cash costs per payable ounce of gold sold, which include all costs of inventory, refining costs and royalties, were
Mine sales
A total of 21,798 ounces of gold were sold at an average price of
Exploration
Mineral Resource conversion remained the main exploration objective in the third quarter of 2017. During the period, we completed 13,218 meters of underground drilling and 2,592 meters of surface drilling. Underground drilling was active at the Santoy and Seabee mines with the majority of expenditures at Santoy.
Drilling at Santoy Gap in the third quarter has yielded several intercepts that extend the limits of the Mineral Resources, including 2.4 meters at a grade of 14.77 g/t gold in drillhole SUG-17-050 and 1.3 meters at a grade of 14.39 g/t gold in drillhole SUG-17-047 within the Santoy Gap 9B vein. Similarly, step out drilling on the Santoy 8A vein returned 2.1 meters at a grade of 24.00 g/t gold in drillhole SUG-17-923. Drilling at the 8A target transects the Santoy 8A Footwall structural horizon and an intercept outside the Mineral Resource returned 2.5 meters at a grade of 17.31 g/t gold in drillhole JOY-17-770. One notable intercept was returned from the Gap Hanging Wall target including 2.2 meters at a grade of 9.91 g/t gold in the eastern sector, as reported in our news release dated
Greenfields exploration at the Seabee Gold Operation included the completion of a soils grid in the area of the Santoy mine. The results show the down-ice dispersion of anomalous gold values associated with the Santoy shear zone. We have identified two additional anomalous areas for follow up.
At the Fisher property, where we have an option agreement with Eagle Plains Resources Ltd. to acquire up to an 80% interest on the adjacent 34,000 hectares south of the Santoy mine, we completed our field program of prospecting, mapping, a drone magnetic survey and geochemical surveying of soil and till. Prospecting results confirm two new gold showings 1.5 kilometers and 8.0 kilometers south of the Santoy mine. As previously reported, due to wildfire conditions in and around the Fisher project area, exploration activities were suspended in
Puna Operations,
(Amounts presented on a 100% basis unless otherwise stated)
|
Three months ended |
||||||
|
Operating data |
|
|
|
|
|
|
|
Ore milled (kt) |
461 |
446 |
449 |
476 |
455 |
|
|
Silver mill feed grade (g/t) |
153 |
185 |
145 |
194 |
264 |
|
|
Processing costs ($/t milled) |
11.92 |
12.94 |
13.66 |
14.17 |
14.78 |
|
|
Silver recovery (%) |
67.8 |
73.5 |
72.6 |
74.5 |
79.0 |
|
|
General and admin costs ($/t milled) |
4.81 |
5.00 |
5.22 |
6.19 |
5.84 |
|
|
Silver produced ('000 oz) |
1,541 |
1,947 |
1,520 |
2,210 |
3,047 |
|
|
Silver produced (attributable) ('000 oz) (1) |
1,156 |
1,777 |
1,520 |
2,210 |
3,047 |
|
|
Silver sold ('000 oz) |
2,076 |
1,655 |
1,443 |
2,633 |
2,947 |
|
|
Silver sold (attributable) ('000 oz) (1) |
1,557 |
1,473 |
1,443 |
2,633 |
2,947 |
|
|
Realized silver price ($/oz) (2) |
16.77 |
17.31 |
17.35 |
17.14 |
19.64 |
|
|
Cash costs ($/oz) (2) |
12.76 |
12.15 |
12.68 |
9.80 |
8.48 |
|
|
|
13.56 |
12.78 |
14.82 |
11.47 |
9.87 |
|
|
Financial Data ($000s) |
||||||
|
Revenue |
28,958 |
22,029 |
26,534 |
29,095 |
51,336 |
|
|
Income (loss) from mine operations |
7,690 |
4,006 |
13,767 |
(4,056 |
31,908 |
|
|
Capital expenditures |
1,006 |
420 |
2,261 |
3,467 |
3,158 |
|
|
Exploration expenditures (3) |
— |
— |
— |
11 |
7 |
|
|
(1) |
Attributable production and sales figures for the third quarter of 2017 are on 75% attributable basis. Attributable production and sales figures for the second quarter of 2017 represent 100% for April and |
|
(2) |
We report the non-GAAP financial measures of cash costs per payable ounce of silver sold, realized silver prices and |
|
(3) |
Does not include exploration or development of the Chinchillas project. |
Mine production
During the first nine months of 2017, the operation produced a total of 5.0 million ounces of silver, surpassing the lower end of our 2017 production guidance as stockpile grades and metallurgical performance continued to exceed plan. In the third quarter of 2017, silver production from stockpiles totaled 1.5 million ounces. Attributable share of silver production in the third quarter was 1.2 million ounces.
Ore was milled at an average rate of 5,012 tonnes per day in the third quarter, similar to the previous quarter. Ore milled in the third quarter of 2017 contained an average silver grade of 153 g/t, 17% lower than the 185 g/t reported in the second quarter of 2017 as we continue to process lower grade stockpiles. The average silver recovery in the third quarter was 67.8%, lower than the previous quarter as expected due to planned lower silver mill feed grade.
Mine operating costs
Cash costs and
Cash costs, which include cost of inventory, treatment and refining costs and, if applicable, by-product credits, increased by 5% to
Mine sales
We recognized sales of 2.1 million ounces of silver at an average price of
Chinchillas project,
Since the initiation of development activities in
Construction contracts have been issued for tender and, conditional upon receipts of permits, will be awarded in the fourth quarter of 2017. These contracts include concrete and earthworks and general electromechanical installation at Pirquitas, and infrastructure buildings at Chinchillas, including administration buildings, truck shop, diesel and explosives storage and distribution systems. The pre-stripping operations plan has been completed with detailed mine planning ongoing by the Puna Operations technical services team.
The project is awaiting environmental, operating and construction permit approvals, which are expected in the fourth quarter. Project planning and execution, based on such permit expectations, supports first ore feed to the Pirquitas mill in the second half of 2018.
Other Projects
SIB project,
During the third quarter of 2017, we completed 9,336 meters of diamond drilling in 12 holes at the SIB exploration project located near the high-grade, past-producing
The exploration target is precious metal enriched volcanogenic massive sulphides, and the SIB project boasts the only mineralization similar to
Once all the assay results and geophysical interpretations have been received, we will review and determine our next steps for the project.
Outlook
This section of the news release provides management's production and cost estimates. See "Cautionary Note Regarding Forward-Looking Statements."
We expect our total production to be within our previously improved annual production guidance as a result of strong results at the Seabee Gold Operation and Puna Operations, offset by lower production results at the Marigold mine. Production guidance at Marigold has been reduced by 10,000 ounces and is now expected to be between 195,000 and 205,000 ounces of gold. This change reflects third quarter gold production, lower pumping rates to the leach pads in the third and fourth quarters due to higher clay content, and the subsequent fourth quarter incident at Marigold mine. Within the current phase of the Mackay pit, more ore tonnes and gold ounces have been encountered, however, the majority of these incremental tonnes have been of a clay nature. Blending of these clay ores with rock ores is required as they are loaded on the leach pads to improve permeability and rate of recovery and this has been and will be an increased focus for the operation through the fourth quarter. While these incremental tonnes and gold ounces encountered are longer term positive, these operating impacts have reduced near term production. Mining of higher clay ore is expected through to the end of the first quarter of 2018.
Due to positive cost performance at all three operations throughout the year and enhanced production results at both the Seabee Gold Operation and Puna Operations, we expect our corporate cash cost per payable ounce sold to remain within the previously reduced guidance range.
As previously disclosed, the Marigold mine was shut down due to an incident on
|
Revised Operating Guidance |
Marigold mine |
Seabee Gold Operation |
Puna Operations |
||
|
Gold Production |
oz |
195,000 - 205,000 |
75,000 - 85,000 |
— |
|
|
Silver Production |
Moz |
— |
— |
5.0 - 6.0 |
|
|
Cash Costs per Payable Ounce Sold (1) |
$/oz |
640 - 670 |
575 - 625 |
12.50 - 14.00 |
|
|
Capital Expenditures |
$M |
30 |
8 |
5 |
|
|
Capitalized Stripping / Capitalized |
$M |
20 |
11 |
— |
|
|
Exploration Expenditures (2) |
$M |
5 |
5 |
— |
|
|
(1) |
We report the non-GAAP financial measure of cash costs per payable ounce of gold and silver sold to manage and evaluate operating performance at the Marigold mine, the Seabee Gold Operation and Puna Operations. See "Cautionary Note Regarding Non-GAAP Measures". |
|
(2) |
Includes capitalized and expensed exploration expenses. |
|
(3) |
Shown on a 100% basis. |
Consolidated Financial Summary
|
Selected Financial Data (1) |
||||||
|
Three months ended |
Nine months ended |
|||||
|
2017 |
2016 |
2017 |
2016 |
|||
|
$ |
$ |
$ |
$ |
|||
|
Revenue |
106,005 |
143,381 |
340,892 |
363,669 |
||
|
Income from mine operations |
22,522 |
59,190 |
92,073 |
126,550 |
||
|
Operating income |
10,393 |
50,248 |
81,395 |
89,099 |
||
|
Net income |
1,821 |
38,042 |
54,616 |
52,825 |
||
|
Basic attributable income per share |
0.01 |
0.32 |
0.45 |
0.54 |
||
|
Adjusted attributable income before |
4,252 |
45,168 |
42,739 |
83,996 |
||
|
Adjusted attributable net income (2) |
4,387 |
37,214 |
37,213 |
69,405 |
||
|
Adjusted basic attributable income |
0.04 |
0.31 |
0.31 |
0.71 |
||
|
Cash generated by operating |
30,292 |
53,066 |
99,550 |
96,554 |
||
|
Cash generated by (used in) |
38,570 |
(10,581) |
(5,861) |
(19,222) |
||
|
Cash generated by (used in) |
1,774 |
2,599 |
2,659 |
(11,400) |
||
|
Financial Position |
|
|
||||
|
Cash and cash equivalents |
424,025 |
327,127 |
||||
|
Marketable securities |
109,721 |
148,944 |
||||
|
Current assets (including cash and |
756,731 |
704,240 |
||||
|
Current liabilities |
72,654 |
144,306 |
||||
|
Working capital (2) |
684,077 |
559,934 |
||||
|
Total assets |
1,499,220 |
1,438,688 |
||||
|
(1) |
All values are presented in thousands of |
|
(2) |
We report non-GAAP measures including adjusted attributable income before- and after-tax, adjusted basic attributable income per share attributable to our shareholders and working capital to manage and evaluate our operating performance. Please see "Cautionary Note Regarding Non-GAAP Measures". |
Quarterly financial summary
As a result of lower sales and lower average prices for both gold and silver, consolidated quarterly revenue decreased by 26% relative to the comparative quarter. We sold 18% less payable ounces of gold from the Marigold mine compared to the same quarter of 2016 as Marigold production declined as expected due to lower grades of the pit phases mined through the third quarter of 2017. Seabee Gold Operation production was impacted by forest fires in the third quarter of 2017 which caused intermittent power and mine operations interruptions. Despite this, sales were unchanged compared to the same quarter of 2016 due to selling down of inventories. Due to the planned lower production from processing stockpiles at Puna Operations, 30% less ounces of silver were sold relative to the comparative period in 2016.
Income from mine operations in the third quarter of 2017 generated a gross margin of 21%, lower than the 41% margin in the third quarter of 2016. This was due to higher cost of sales at Puna Operations where we are processing stockpiles, and due to higher unit costs at both the Marigold mine and the Seabee Gold Operation, as a result of lower grades and higher depreciation and depletion, respectively, in addition to lower realized prices per ounce of gold and silver sold. Net income for the third quarter of 2017 of
Cash generated by operating activities decreased to
Year-to-date financial summary
The 6% decrease in revenue compared to the nine months of 2016 was due to 39% lower ounces of silver sold, as a result of planned processing of lower grade stockpiles at Puna Operations, at comparable realized prices, partially offset by a 20% increase in gold ounces sold, although at 2% lower prices. The increase in gold ounces sold was largely due to sales from the Seabee Gold Operation, which we acquired in
Income from mine operations in the nine months ended
Cash generated by operating activities was
Corporate summary
Effective
On
In the third quarter of 2017, we sold 6.4 million common shares of Pretium, realizing pre-tax cash proceeds of C$67.5 million. Subsequent to the quarter end, we sold an additional 1.5 million Pretium shares, realizing pre-tax cash proceeds of
Third Quarter 2017 Selected Drill Results
Table 1. Third Quarter 2017 Selected Drill Results at the Marigold mine,
|
Hole ID |
UTM-N |
UTM-E |
Elevation |
From |
To |
Width |
Gold |
Area |
|
MRA6512 |
4508157 |
484800 |
1579 |
301.8 |
352.0 |
50.3 |
0.95 |
North Red |
|
including |
306.4 |
313.9 |
7.6 |
3.63 |
North Red |
|||
|
MRA6517 |
4507274 |
485067 |
1604 |
269.7 |
317.0 |
47.2 |
0.79 |
Red Dot |
|
Note: See Table 3 and Table 4 in this news release for a list of all drillholes completed for the period from |
Table 2. Third Quarter 2017 Selected Drill Results at the Seabee Gold Operation,
|
Hole ID |
From |
To |
Mine E |
Mine N |
Elevation |
Gold |
Ture Width |
Area |
|
SUG-17-046 |
188.4 |
191.0 |
3620.4 |
4982.4 |
-421.5 |
21.66 |
1.21 |
9C |
|
SUG-17-048 |
185.0 |
196.6 |
3627.0 |
4969.4 |
-417.9 |
3.47 |
6.09 |
9A |
|
SUG-17-049 |
142.9 |
148.4 |
3673.7 |
4992.2 |
-433.1 |
5.94 |
3.47 |
9C |
|
SUG-17-050 |
132.5 |
136.0 |
3692.5 |
4997.4 |
-444.9 |
8.15 |
2.58 |
9C |
|
SUG-17-052 |
229.1 |
231.0 |
3612.9 |
4921.1 |
-378.3 |
27.28 |
0.84 |
9A |
|
SUG-17-922 |
317.4 |
320.7 |
4541.2 |
5181.4 |
-479.5 |
6.67 |
2.41 |
8A |
|
SUG-17-923 |
468.4 |
473.3 |
4525.0 |
5325.2 |
-605.9 |
24.00 |
2.14 |
8A |
|
Notes: Drillholes presented in this table have gram-meter value greater than 15. See Table 5 in this news release for a list of all drillholes completed for the period from |
|
|
1 Midpoints of the intercept determined where mineralized structure intersected. |
|
|
2 Gold values cut to 75 g/t. |
Sampling and Analytical Procedures
All drill samples in respect of the Marigold mine drilling program are sent for processing and analysis to the offices of
All drill samples in respect of the Seabee Gold Operation drilling program are assayed by our onsite non-accredited assay laboratory, which is not independent from
Qualified Persons
The scientific and technical information contained in this news release relating to the Marigold mine has been reviewed and approved by
Management Discussion & Analysis and Conference Call
This news release should be read in conjunction with our unaudited condensed consolidated interim financial statements and our MD&A as filed with the Canadian Securities Administrators and available at www.sedar.com or our website at www.ssrmining.com.
- Conference call and webcast:
Wednesday, November 8, 2017 , at11:00 a.m. EST .
|
Toll-free in |
+1 (800) 319-4610 |
|
All other callers: |
+1 (416) 915-3239 |
|
Webcast: |
- The conference call will be archived and available on our website.
Audio replay will be available for two weeks by calling:
|
Toll-free in |
+1 (855) 669-9658, replay code 1719 |
|
All other callers: |
+1 (412) 317-0088, replay code 1719 |
About
For further information contact:
Vice President, Business Development and Strategy
Toll free: +1 (888) 338-0046
All others: +1 (604) 689-3846
E-Mail: invest@ssrmining.com
To receive
Table 3. Drill Results at the Marigold mine,
|
Hole ID |
From (meters) |
To (meters) |
Width (meters) |
Gold Grade |
Area |
|
MR6496 |
173.7 |
259.1 |
85.3 |
0.28 |
|
|
(including) |
196.6 |
204.2 |
7.6 |
1.16 |
|
|
MRA6508 |
303.3 |
342.9 |
39.6 |
0.71 |
|
|
(including) |
303.3 |
307.8 |
4.6 |
3.86 |
|
|
MRA6510 |
374.9 |
408.4 |
33.5 |
0.64 |
North Red Dot |
|
(including) |
405.4 |
408.4 |
3.0 |
5.75 |
|
|
MRA6512 |
301.8 |
352.0 |
50.3 |
0.95 |
North Red Dot |
|
(including) |
306.3 |
313.9 |
7.6 |
3.63 |
|
|
(including) |
339.9 |
342.9 |
3.0 |
1.17 |
|
|
MR6515 |
172.2 |
210.3 |
38.1 |
0.71 |
|
|
(including) |
172.2 |
178.3 |
6.1 |
1.38 |
|
|
(including) |
192.0 |
204.2 |
12.2 |
1.11 |
|
|
and |
231.6 |
268.2 |
36.6 |
0.70 |
|
|
(including) |
253.0 |
262.1 |
9.1 |
1.92 |
|
|
MR6517 |
269.7 |
317.0 |
47.2 |
0.79 |
|
|
(including) |
274.3 |
281.9 |
7.6 |
3.26 |
|
|
MRA6523 |
262.1 |
283.5 |
21.3 |
1.85 |
|
|
(including) |
263.7 |
278.9 |
15.2 |
2.51 |
|
|
MRA6526 |
243.8 |
259.1 |
15.2 |
1.55 |
|
|
(including) |
245.4 |
256.0 |
10.7 |
2.07 |
|
|
MR6540 |
195.1 |
216.4 |
21.3 |
1.49 |
|
|
(including) |
195.1 |
204.2 |
9.1 |
2.97 |
|
Notes: Width in meters represents downhole intersected length, which may or may not be a true thickness of the mineralization. Drillholes presented in this table have gram-meter value greater than 20. The drillhole collars table (see Table 4) provides information if the drillhole has a Mineral Resource intercept of six meters at 0.3 g/t gold. "Width" may not equal the difference between "From" and "To" due to rounding. |
Table 4. Drillhole collars from the exploration drill programs at the Marigold mine,
|
HOLE ID |
UTM-N |
UTM-E |
Elevation |
Azimuth |
Dip |
Length |
Area |
|
MR6496 |
4504346 |
487089 |
1926 |
120 |
-89 |
367 |
|
|
MRA6508 |
4507547 |
485065 |
1590 |
84 |
-69 |
343 |
|
|
MRA6509 |
4508072 |
484747 |
1586 |
87 |
-70 |
428 |
North Red Dot |
|
MRA6510 |
4508035 |
484765 |
1589 |
90 |
-75 |
428 |
North Red Dot |
|
MRA6511 |
4508127 |
484793 |
1580 |
90 |
-74 |
428 |
North Red Dot |
|
MRA6512 |
4508157 |
484800 |
1579 |
91 |
-74 |
428 |
North Red Dot |
|
MR6514 |
4504347 |
487140 |
1924 |
225 |
-90 |
396 |
|
|
MR6515 |
4504348 |
487116 |
1925 |
127 |
-89 |
379 |
|
|
MR6516 |
4504316 |
487085 |
1940 |
346 |
-90 |
386 |
|
|
MR6517 |
4507274 |
485067 |
1604 |
64 |
-89 |
392 |
|
|
MRA6518 |
4508096 |
484835 |
1580 |
97 |
-75 |
367 |
North Red Dot |
|
MRA6519 |
4503531 |
487799 |
2117 |
307 |
-71 |
274 |
|
|
MRA6520 |
4503399 |
487444 |
2060 |
132 |
-70 |
386 |
|
|
MRA6521 |
4503730 |
487774 |
2086 |
268 |
-51 |
221 |
|
|
MRA6522 |
4503677 |
487777 |
2095 |
269 |
-49 |
325 |
|
|
MRA6523 |
4507249 |
485061 |
1604 |
88 |
-56 |
383 |
|
|
MRA6524 |
4503799 |
487737 |
2075 |
265 |
-51 |
171 |
|
|
MRA6525 |
4507274 |
485067 |
1604 |
86 |
-76 |
386 |
|
|
MRA6526 |
4507274 |
485068 |
1604 |
89 |
-51 |
367 |
|
|
MRA6529 |
4503674 |
487710 |
2093 |
269 |
-49 |
305 |
|
|
MRA6530 |
4503585 |
487288 |
2030 |
270 |
-65 |
264 |
|
|
MRA6532 |
4503312 |
487288 |
2048 |
265 |
-66 |
270 |
|
|
MR6534 |
4504744 |
487111 |
1852 |
100 |
-89 |
215 |
|
|
MRA6536 |
4507089 |
485327 |
1455 |
89 |
-54 |
123 |
|
|
MRA6537 |
4507029 |
485282 |
1455 |
90 |
-45 |
123 |
|
|
MR6539 |
4504861 |
487200 |
1859 |
220 |
-89 |
245 |
|
|
MR6540 |
4504350 |
487233 |
1902 |
302 |
-90 |
322 |
|
|
Note: The numerical gaps in the drillhole sequence result from drillholes reported previously or drillholes expected to be drilled in later 2017. |
Table 5. Drill Results at the Seabee Gold Operation,
|
Hole ID |
From |
To |
Mine E |
Mine N |
Elevation |
Gold |
True |
Zone |
|
SUG-17-043 |
150.8 |
155.6 |
3663.2 |
5003.4 |
-449.3 |
1.10 |
3.01 |
9C |
|
161.4 |
162.5 |
3656.7 |
4999.0 |
-453.0 |
0.67 |
0.69 |
9B |
|
|
SUG-17-044 |
146 |
148.2 |
3672.9 |
5009.1 |
-457.6 |
0.35 |
1.47 |
9C |
|
152.3 |
157.8 |
3667.3 |
5005.1 |
-461.6 |
0.67 |
3.68 |
9B |
|
|
SUG-17-045 |
138.3 |
141.9 |
3685.5 |
5012.8 |
-464.0 |
0.01 |
2.61 |
9C |
|
144.9 |
147.9 |
3681.4 |
5009.6 |
-467.5 |
0.18 |
2.17 |
9B |
|
|
159 |
161.9 |
3672.2 |
5002.3 |
-475.3 |
0.05 |
2.09 |
9A |
|
|
SUG-17-046 |
188.4 |
191 |
3620.4 |
4982.4 |
-421.5 |
21.66 |
1.21 |
9C |
|
198.2 |
201 |
3612.1 |
4977.4 |
-423.5 |
3.56 |
1.30 |
9B |
|
|
SUG-17-047 |
216.8 |
220.7 |
3592.1 |
4968.0 |
-406.9 |
3.54 |
1.58 |
9C |
|
258.7 |
262 |
3556.5 |
4947.2 |
-412.0 |
14.39 |
1.31 |
9B |
|
|
SUG-17-048 |
171.8 |
172.8 |
3641.7 |
4980.1 |
-414.5 |
0.01 |
0.52 |
9C |
|
171.8 |
172.8 |
3633.4 |
4974.1 |
-416.5 |
1.63 |
2.31 |
9B |
|
|
185.0 |
196.6 |
3627.0 |
4969.4 |
-417.9 |
3.47 |
6.09 |
9A |
|
|
SUG-17-049 |
142.9 |
148.4 |
3673.7 |
4992.2 |
-433.1 |
5.94 |
3.47 |
9C |
|
153.1 |
155.5 |
3667.4 |
4986.9 |
-435.9 |
0.05 |
1.50 |
9B |
|
|
SUG-17-050 |
132.5 |
136 |
3692.5 |
4997.4 |
-444.9 |
8.15 |
2.58 |
9C |
|
144.7 |
148 |
3685.0 |
4989.7 |
-450.4 |
14.77 |
2.43 |
9B |
|
|
SUG-17-051 |
184 |
187 |
3638.3 |
4959.4 |
-391.7 |
0.05 |
1.40 |
9C |
|
202.5 |
203.3 |
3625.0 |
4948.2 |
-392.9 |
2.50 |
0.37 |
9B |
|
|
SUG-17-052 |
183.8 |
189 |
3645.4 |
4950.3 |
-377.9 |
0.05 |
2.31 |
9C |
|
220.5 |
221.8 |
3619.6 |
4927.1 |
-378.2 |
0.03 |
0.58 |
9B |
|
|
229.1 |
231 |
3612.9 |
4921.1 |
-378.3 |
27.28 |
0.84 |
9A |
|
|
SUG-17-053 |
205.5 |
209.1 |
3631.3 |
4936.5 |
-362.2 |
0.11 |
1.66 |
9C |
|
263.3 |
266.6 |
3588.9 |
4897.6 |
-359.8 |
0.60 |
1.51 |
9A |
|
|
SUG-17-054 |
229.1 |
238.1 |
3573.0 |
5033.1 |
-485.1 |
0.01 |
3.89 |
9C |
|
280.6 |
281.7 |
3531.9 |
5023.0 |
-506.7 |
0.01 |
0.48 |
9A |
|
|
SUG-17-302 |
340.8 |
351.6 |
4149.6 |
5269.2 |
-365.2 |
0.01 |
5.58 |
Gap HW |
|
JOY-17-769 |
223.7 |
226.2 |
4776.9 |
5190.2 |
-184.8 |
4.36 |
2.46 |
Gap HW |
|
413.3 |
416.8 |
4763.7 |
5070.0 |
-331.3 |
4.18 |
3.43 |
8A |
|
|
422.2 |
427 |
4762.7 |
5063.8 |
-338.5 |
0.07 |
4.70 |
8A Footwall |
|
|
JOY-17-770 |
411.5 |
414.6 |
4761.5 |
5048.3 |
-310.4 |
0.61 |
3.02 |
8A |
|
418.9 |
421.5 |
4760.5 |
5043.3 |
-315.4 |
17.31 |
2.54 |
8A Footwall |
|
|
JOY-17-771 |
411 |
417.9 |
4774.4 |
5047.5 |
-312 |
3.89 |
6.83 |
8A |
|
420.9 |
424.7 |
4774.0 |
5041.5 |
-317.8 |
0.25 |
3.76 |
8A Footwall |
|
|
SUG-17-920 |
286.6 |
291.3 |
4558.6 |
5154.7 |
-448.7 |
0.14 |
5.83 |
8A |
|
304.8 |
307 |
4560.6 |
5152.4 |
-465.4 |
2.23 |
1.36 |
8A Footwall |
|
|
SUG-17-921 |
380.3 |
390 |
4603.9 |
5244.8 |
-532.5 |
0.14 |
5.83 |
8A |
|
SUG-17-922 |
317.4 |
320.7 |
4541.2 |
5181.4 |
-479.5 |
6.67 |
2.41 |
8A |
|
327.7 |
330 |
4541.8 |
5181.1 |
-489.3 |
0.01 |
1.68 |
8A Footwall |
|
|
SUG-17-923 |
468.4 |
473.3 |
4525.0 |
5325.2 |
-605.9 |
24.00 |
2.14 |
8A |
|
Notes: |
|
|
1 Midpoints of the intercept determined where mineralized structure intersected. |
|
|
2 Gold values cut to 75 g/t. |
Cautionary Note Regarding Forward-Looking Statements
This news release contains forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of the
Generally, forward-looking statements can be identified by the use of words or phrases such as "expects," "anticipates," "plans," "projects," "estimates," "assumes," "intends," "strategy," "goals," "objectives," "potential," "believes," or variations thereof, or stating that certain actions, events or results "may," "could," "would," "might" or "will" be taken, occur or be achieved, or the negative of any of these terms or similar expressions. The forward-looking statements in this news release relate to, among other things: future production of gold, silver and other metals; future costs of inventory, and cash costs, total costs and
These forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied, including, without limitation, the following: uncertainty of production, development plans and cost estimates for the Marigold mine, the Seabee Gold Operation, Puna Operations and our projects; our ability to replace Mineral Reserves; our ability to obtain necessary permits for the Chinchillas project; commodity price fluctuations; political or economic instability and unexpected regulatory changes; currency and interest rate fluctuations; the possibility of future losses; general economic conditions; fully realizing the value of our shareholdings in Pretium and our other marketable securities, due to changes in price, liquidity or disposal cost of such marketable securities; counterparty and market risks related to the sale of our concentrate and metals; uncertainty in the accuracy of Mineral Reserves and Mineral Resources estimates and in our ability to extract mineralization profitably; differences in
This list is not exhaustive of the factors that may affect any of our forward-looking statements. Our forward-looking statements are based on what our management considers to be reasonable assumptions, beliefs, expectations and opinions based on the information currently available to it. Assumptions have been made regarding, among other things, our ability to carry on our exploration and development activities, our ability to meet our obligations under our property agreements, the timing and results of drilling programs, the discovery of Mineral Resources and Mineral Reserves on our mineral properties, the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction and operation of our projects, the price of the minerals we produce, the costs of operating and exploration expenditures, our ability to operate in a safe, efficient and effective manner, our ability to obtain financing as and when required and on reasonable terms and our ability to continue operating the Marigold mine, the Seabee Gold Operation and Puna Operations, the factors identified in the PEA which may affect the Mineral Resource estimate, the Mineral Reserve estimate and the economic analysis under the PEA, the capital and operating cost assumptions identified in the PEA, dilution and mining recovery assumptions, assumptions regarding stockpiles, the success of mining, processing, exploration and development activities, the accuracy of geological, mining and metallurgical estimates, no significant unanticipated operational or technical difficulties, maintaining good relations with the communities surrounding the Marigold mine, the Seabee Gold Operation and Puna Operations, no significant events or changes relating to regulatory, environmental, health and safety matters, certain tax matters and no significant and continuing adverse changes in general economic conditions or conditions in the financial markets (including commodity prices, foreign exchange rates and inflation rates). You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. We cannot assure you that actual events, performance or results will be consistent with these forward-looking statements, and management's assumptions may prove to be incorrect. Our forward-looking statements reflect current expectations regarding future events and operating performance and speak only as of the date hereof and we do not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place undue reliance on forward-looking statements.
Cautionary Note to U.S. Investors
This news release includes Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in
Cautionary Note Regarding Non-GAAP Measures
This news release includes certain terms or performance measures commonly used in the mining industry that are not defined under International Financial Reporting Standards ("IFRS"), including cash costs, total costs and
SOURCE


The Latest: Panel blocks bigger benefits for raising kids
Democrat Jones talks health care in Senate campaign stop
Advisor News
- After the midterms: Addressing your clients’ tax concerns
- Berkeley arts tax heads toward passage while public bank measure looks likely to fail
- Americans’ sense of overall prosperity still ticks upward
- Turning expanded eligibility into a better coverage plan for federal clients
- Election 2026: Which of Berkeley's 7 ballot measures will pass?
More Advisor NewsAnnuity News
- AM Best Affirms Credit Ratings of Knighthead Annuity & Life Assurance Company and Merit Life Insurance Co.
- Jackson reports record annuity sales, increases share repurchase authorization
- Why the market doesn’t need more carriers
- Equitable, Corebridge steam toward merger with strong Q3 annuity sales
- Jackson Announces New Annuity Offering for AARP Members
More Annuity NewsHealth/Employee Benefits News
- Open enrollment is now for 2027 health insurance coverage in Illinois: What to know
- Idaho insurance director details $13M school trust collapse
- Insurance program's collapse detailed at ISBA conference
- Boeing retirees ‘shocked’ by 400% jump in health insurance premiums
- MEDICAID PAYMENT TRANSPARENCY RULES: STATE REPORTING REQUIREMENTS AND LIMITATIONS
More Health/Employee Benefits NewsLife Insurance News
- AM Best Affirms Credit Ratings of Central States Indemnity Co. of Omaha and Its Subsidiary
- National Life Group Approves $23 Million Dividends for 2027
- Milliman’s proposed $15.5 million settlement puts life insurance underwriting data in focus
- Brighthouse Financial Announces Third Quarter 2026 Results
- Prudential earnings dip as Japan sales suspension offsets U.S. growth
More Life Insurance News