Sources Sought Notice – S– Pest Control Leavenworth VAMC
| Federal Information & News Dispatch, Inc. |
Notice Type: Sources Sought Notice
Posted Date:
Office Address:
Subject: S-- Pest Control Leavenworth VAMC
Classification Code: S - Utilities and housekeeping services
<p>Solicitation Number: VA25514Q0974
Contact: Wayne HenthorneContract Specialist 913-946-1965 mailto:[email protected]
Description:
VA Heartland Network
This is not a solicitation announcement. This is a sources sought synopsis only. The purpose of this synopsis is to gain knowledge of potential qualified sources and their size classification (Hubzone, 8(a), Small Business, Small Disadvantaged Business, Veteran Owned Small Business or Service Disabled Veteran Owned Small Business) relative to NAICS 561710 (Size Standard
PEST CONTROL DESCRIPTION/WORK STATEMENT
GENERAL
The Contractor shall provide all supplies, materials, equipment, labor, supervision, management and transportation to perform all tasks as identified below and in the attached Area Treatment/Frequency Chart (See Exhibit 1). All work will be performed in accordance with the guidelines established by Federal, State and local ordinances and as shown in the
SCHEDULING:
a. The Area Treatment/Frequency Chart (Exhibit 1) and the indicated time frames shall be the minimum basis for the scheduling of pest management tasks. The Contractor shall provide the work scheduling of when services will be performed based on information contained in Exhibit 1 and submit schedule to the Environmental Management Service designee, who will be functioning as the Contracting Officers Technical Representative (COTR), no later than the contract start date. Service shall be scheduled so that each building and area of the Medical Center complex will receive pest control service a minimum of once per month or as indicated by Exhibit 1. Areas such as Nutrition & Food, Domiciliary and Canteen may require treatment and/or special treatment as often as once per week.
b. Pest management tasks shall be scheduled so as to be performed on definite appointed dates and in no event shall the Contractor carry on work outside regular agreed upon working hours without prior approval of the Contracting Officer's Technical Representative.
c. In the event climate or weather conditions become unsuitable for work or may induce an environmental hazard, the entire work shall be rescheduled to a date and time satisfactory to the Contractor and the Contracting Officer's Technical Representative. Postponement will not reflect any penalties assessed to the Contractor, nor should there be any additional cost to the Government.
STANDARDS:
All Integrated Pest Management (IPM) tasks shall meet the guidelines as shown in
TASKS: (All work pertains to the interior and exterior of designated buildings)
a. Inspection to determine which pest management measures is appropriate and required.
b. Recommending environmental sanitation practices that restrict or eliminate food, water, or harborage for pests.
c. Selection and utilization of non-chemical control methods that eliminate exclude or repels pests (i.e., insect electrocution devices, insect traps, caulking, air screens, etc.). Bug lights are to be emptied as needed.
d. Selection and use of the most environmentally sound pesticides(s) to affect control when chemical control methods are necessary.
e. Control of general structural anthropoid pests (i.e., cockroaches, ants, carpet beetles, spiders, carpenter bees, etc.).
f. Control of flying insect pests (i.e., housefly, stable fly, blowflies, etc.) Electric Fly Lights maintenance and bulb replacement cost to be included in bid. Not a separate line item.
g. Control of predatory pests (i.e., fleas, mites, ticks, bees, wasps, mosquitoes, scorpions, chiggers, etc.). Includes small picnic areas where tables are located.
h. Control of stored product pests (i.e., saw tooth grain beetle, red/confused flour beetles, trogoderma beetles, grain moth, etc.).
i. Control of mice and rats (i.e., house mouse, field mouse, roof rat,
j. Evaluation of control measures through follow-up inspections.
k. The Contractor will be required to inspect for all wood destroying organisms during scheduled inspections. When wood destroying organisms are found (termites, carpenter ants), the contractor will report the finding to the Contracting Officer's Technical Representative, who will take other actions, including separate contract action as warranted, to treat the infestation. COTR reserves the right to accept bids from other vendors in these cases.
l. Control of other vertebra pests (i.e., squirrels, gophers, moles, skunks, snakes, rabbits, raccoons, etc.). Trapping and removal shall be price out in a separate Line Items and done on an as needed basis. This establishes a competitive firm fix price for COTR consideration when taking other actions, including separate contract action, as warranted, to trap and remove vermin.
m. Control of pigeons, starlings, sparrows, and bats will be priced out on case by case basis. These measures are outside the scope of the FSS Contract. However the COTR can request the Vendor to submit an estimate to address a bird or bat problem on facility grounds. A separate PO will be generated to cover this action. COTR reserves the right to accept bids from other vendors in these cases.
n. Room treatments for Bedbugs will be listed as a separate Line Item price and done on an as needed basis. This will establish a competitive firm fixed price for COTR consideration when taking action on the infestations, including separate Contract action, as warranted, for Bedbug treatment.
o. Control of ornamental pests (i.e., aphids, scales, meal bugs, mites, weevils, lead miners caterpillars, sawflies, chafer, bacterial diseases, fungi, etc.).
VISITS:
a. Normal inspection and treatment of most buildings are to be made during regular Medical Center work hours of
b. Inspection and treatment of food areas, and specialized areas (i.e. Surgery, Nutrition and Food, Canteen, etc.) will be done during other than normal working hours as designated by the Contracting Officer's Technical Representative and outlined in Exhibit 1.
c. The Government estimates the Contractor will be required on station 40 hours per week to perform routine inspections, maintain and perform the required services. If the contractor can provide the quality services utilizing fewer personnel hours, and accomplish all contract requirements, the contractor may utilize professional judgment in determining the personnel hours required to perform the contract functions. The contractor is still required to accomplish all work in accordance with the specifications.
d. Contractor personnel are required to interrupt their work at any time so as not to interfere with the normal functioning of the facility, including utility services, fire protection systems and passage of facility patients, personnel, equipment and carts.
CALL BACK REQUIREMENT:
a. Routine:
The Contractor shall within 12 hours after receipt of notification by the Contracting Officer or his/her representative, and at no additional charge to the Government, retreat previously treated areas when inadequate control (as per specifications) was obtained.
b. Emergency;
The Contractor shall within 4 hours after receipt of notification by the Contracting Officer or his/her representative, and at no additional charge to the Government, performs IPM Services to correct the emergent condition.
RESIDUAL TREATMENT:
a. During regular scheduled visits the Contractor shall apply a residual treatment for control of roaches in such a manner as to ensure all areas of the hospital complex are properly treated.
b. The Contractor will properly treat those areas from which complaints have been received.
c. Crack and crevice residual treatment technique of pesticides will be used in food preparation areas according to label instructions.
d. Formulations of pesticides and methods of application must be approved by the Contracting Officer's Technical Representative and comply with all Federal, State and local laws and regulations.
e. Contractor personnel shall utilize pesticides with as low volatility and as odor free as possible in patient occupied areas in order to keep odor levels from affecting patients.
RESTRICTION OF PEST CONTROL MATERIALS:
a. All rodenticides and/or traps shall be placed only at times and in areas approved by the Contracting Officer's Technical Representative and unused portions shall be recovered at the latest by a time limit approved by the Contracting Officer's Technical Representative. Contractor will provide Contracting Officer's Technical Representative with a map identifying the location of baits and traps. All traps/bait stations shall be dated.
b. The use of rodenticides shall be restricted to locations approved by the Contracting Officer's Technical Representative.
c. The Contractor will be required to furnish the
d. No pesticide will be disposed of on
e. The following are examples of pesticides not to be used at this station:
(1) Phosphorus Paste
(2) Thallium Sulfate
(3) Parathion
(4) Sodium Fluoride
(5) Dindane in Vaporizers
(6) DDT
(7) Products containing binyl chloride
f. Residual pesticides will be used per label instructions in food preparation and food distributing areas.
g. The Contractor will not prepare chemicals within the Medical Center buildings.
h. The Contractor's trucks will be kept locked.
i. Pest management operations and use and types of pesticides will meet all federal, state and local regulations.
REMOVAL OF DEAD ANIMALS, DROPPINGS:
All trapped and/or dead or dying animals (i.e. geese, rodents, raccoons, opossums, skunks, squirrels, bats, birds, pigeons, etc.) shall be recovered and disposed of by the Contractor daily or whenever reported, as established by the Contracting Officer's Technical Representative. Contractor is responsible for cleaning guano, droppings, etc. in a timeframe approved by the Contracting Officer's Technical Representative.
STORAGE OF PEST CONTROL MATERIALS:
No pest control materials or equipment shall be stored or kept at the
DISPOSAL OF HAZARDOUS WASTE:
The Contractor shall not dispose of any excess pesticide containers or any other materials contaminated by pesticides at any location on the medical facility premises except as specified by Facilities Management Manager.
REQUIRED CONTRACTOR REPORTING:
a. Contractor personnel will sign in at the beginning of the scheduled work shift and out at the end of the work shift. This will be done at the Contracting Officer's Technical Representative's office. Upon signing in at the office, a tentative itinerary for the tour of duty will be provided to the Contracting Officer's Technical Representative.
b. Contractor is responsible for supplying, completing and submitting all reports required or requested by Federal, State or local ordinances, which pertain to any duties contained in the contract.
c. Quality pest control will be accomplished by tracking specific pest control problems by area and generation of an automatic need for the possibility of additional inspections and/or control methods. All Pest control measures will require no less than one follow-up inspection to insure pest problems have been eliminated.
d. The Contractor shall develop and submit, for approval, to the Contracting Officer's Technical Representative, a schedule of internal monitoring for implementation by the Contractor for quality assurance. At a minimum, the report should track specific pest control problems by area and generate an automatic need for the possibility of additional inspections and/or control methods. A monthly report of findings will be submitted to the Environmental Management Service designee at the end of each month in writing.
SPECIAL PROVISIONS:
The Contractor personnel in performing pesticide applications of the areas specified below shall adhere to the following provisions:
a. Food Handling Areas: Treatment of these areas is limited to only times when food is not being held, processed, prepared, served, and while not occupied by facility employees. The Contractor personnel shall at no time enter facility elevators, which are occupied by food service equipment while in the possession of pesticides or application equipment.
b. Critical Areas: The Contractor shall submit a list of pesticides for intended use in areas listed below for approval by the Contracting Officer's Technical Representative prior to any application. The planned use of pesticides in these areas requires recognition of the attendant hazards to occupants' supplies, equipment and surfaces. No substitution can be made at any time without written approval from the Contracting Officer's Technical Representative.
Intensive Care Unit Respiratory Care Units
Operating Rooms SPD
c. When space treatment is required in these areas, the Ultra Low Volume (ULV) method of pesticide application shall be utilized with approved equipment capable of delivering a particle size range of .5 to 15 microns.
AUTHORITY OF APPLICATOR(S):
Certified applicators are required in the performance of the work under the contract. Each applicator designated by the Contractor to perform work under the contract will furnish a copy of his/her certification (showing categories) to the Contracting Officer's Technical Representative prior to reporting to work. Applicator(s) must be certified in Category 7 and Category 3 to meet contract requirements. In cases where the contractor has two or more persons reporting to work under the contract, one of these should be designated as the supervisor and should be fully certified in all pest management categories in which work is to be performed. Non-certified employees may assist the supervisor in the performance of the work as long as they are in immediate contact with and visible to the supervisor. Orientation to the facility layout and functions to complete requirement of the contract will be accomplished initially with a VA representative along with the contractor. In the case of back-up applicators and/or replacement applicators, it will be the responsibility of the Contractor to orientate new employees to the layout and functions of individual areas. In no case will an applicator perform a pest control function without first being orientated to the facility.
INSPECTION AND ACCEPTANCE:
Environmental Management Service designee is designated the Contracting Officer's Technical Representative for inspection and acceptance of services under the contract. The foregoing is not to be construed as authorization to interpret or furnish advice and information to the contract or relative to the financial or legal specs.
TREATMENT OF VA OWNED RESIDENCE:
VA owned residences will be inspected and treated per established schedule. (See Exhibit 1). In the event of complaints, the Contracting Officer's Technical Representative will contact the contractor with complaints and it will be the responsibility of the contractor to schedule an inspection/treatment time with the occupant.
IDENTIFICATION:
The contractor's field service employee shall wear visible identification at all times while on the premises of the
VEHICLES:
All vehicles will be locked and the keys removed while performing service on the Medical Center's property. This is intended to protect the contractor's property and provide for the safety of the Medical Center's personnel. Vehicle(s) shall be identified. Parking in the appropriate designated parking areas is expected. Information on parking is available from the
SAFETY REQUIRMENTS:
In the performance of this contract, the contractor shall take such safety precautions as the Contracting Officer or designee may determine to be reasonably necessary to protect the lives and health of the occupants of any building. The Contracting Officer or designee will notify the contractor of any noncompliance with the foregoing provisions and action to be taken. After receipt of such notice, the contractor shall immediately correct the conditions to which attention has been directed. Such notice, when served on the contractor, or the representative at the site of the work, all is deemed sufficient for the purpose aforesaid.
Link/URL: https://www.fbo.gov/spg/VA/LeVAMC/VAMCKS/VA25514Q0974/listing.html
| Copyright: | (c) 2013 Federal Information & News Dispatch, Inc. |
| Wordcount: | 3157 |


Combine Solicitation – R– SECURITY GUARD SERVICES
Combine Solicitation – Class A Commercial Driving License Instruction
Advisor News
- Benefit Costs Squeeze Schools, Driving Cuts, Tax Hikes And Difficult Tradeoffs
- Why client insurance needs could change even if their life doesn’t
- Most Gen Z investors think less than a year ahead when making financial decisions
- IRI pitches retirement agenda to Jeffries as democrats shape affordability platform
- Help child-free clients plan for their later years
More Advisor NewsAnnuity News
- Ty J. Young Wealth Management Acquires Senior Insurance Services, Expanding Its Growing Annuity Firm: Ty J. Young Wealth Management
- Guidance, bulletin or reg? NAIC debates form of annuity illustration update
- Nationwide adds mutual fund-linked strategy to New Heights Select FIA
- NUNN INTRODUCES BILL TO CUT RED TAPE, GIVE IOWANS CLEARER INSURANCE INFORMATION
- NAIC working group pressed to accelerate annuity illustration overhaul
More Annuity NewsHealth/Employee Benefits News
Life Insurance News