Combine Solicitation – Exterior Door Replacement Project
| Federal Information & News Dispatch, Inc. |
Notice Type: Combine Solicitation
Posted Date:
Office Address:
Subject:
Classification Code: 56 - Construction & building materials
Solicitation Number: LR-SOW-LRJC14-003
Contact:
Setaside: N/AN/A
Place of Performance (address):
Place of Performance (zipcode): 72209
Place of Performance Country: US
Description:
Little Rock Job Corps Center
This is a Subcontracting Opportunity with Little Rock Job Corps Center /
Operated by
Mailing Address: Little Rock Job Corps Center 6900 Scott Hamilton Dr.
Site Visit:
Submission of Proposals: Little Rock Job Corps Center Attn: Carlas Smith [email protected] Fax: 501-618-2594
The only Bids that will be considered will be from vendors who attend the mandatory bid conference on the day and time specified above.
Project Summary: Removal and replacement of aluminum frames and aluminum exterior doors with heavy duty galvanized steel frames and doors at the Little Rock Job Corps Center,
BID REQUIREMENTS
1. Each bidder shall submit a sealed bid based upon the Extent of Work that includes reference to the project listed in this scope of work. Any variations from the base scope of work are to be noted as distinctly separate from the base bid. 2. Bids shall be submitted for the work as a basis for the contract. The prospective bidder shall submit a bid for a Single Lump Sum Contract. 3. The bid shall include all labor, material, and equipment costs, and all incidental costs necessary to complete the work. 4. The contractor must include with his/her proposal, certification that he/she will conform to the latest
ALL FIRMS SUBMITTING PROPOSALS FOR THIS PROJECT SHALL HAVE NO LESS THAN FIVE CONSECUTIVE YEARS OF RELEVANT EXPERIENCE.
IV. EVALUATION CRITERIA
Award will be made to the offeror who provides Best Value to the Center when all Evaluation Criteria are considered. Lowest Price does not guarantee award of Sub Contract.
Evaluation Criteria Point Value Price: Responsible Contractor who can perform effective services at the lowest reasonable price. 60
Quality: Demonstrated experience and knowledge capabilities; Technical Excellence; Management Capabilities; Personnel qualification; Quality of the Tender packages; Technical excellence including where necessary, technical drawings, blue prints. 20
Past Performance: Past services to center or list of references for verification purposes. 10
Schedule: Explanation on how services will be carried out and the delivery timeframe. 10 TOTAL POINTS 100
EXTENT OF WORK
A. PRECONSTRUCTION ACTIVITIES * Submit a construction plan that limits the impact to the operations of the facility. The Plan must provide at a minimum one entrance way to every building that is under demolition or construction at all times. The areas to be remediated will be marked onsite by the contractor per "SITE SURVEY" and verified by the Center Director's representative.
B. DEMOLITION ACTIVITIES * All materials removed during construction will be disposed of offsite.
C.CONSTRUCTION ACTIVITIES * Remove five (5) each 6' x 7' doors with transoms. * Furnish and install five (5) each 6' x 7' doors and frames with transoms and removable mullion bars. * Remove seventeen (17) each 3' x 7' doors with transoms. * Furnish and install seventeen (17) 3' x 7' doors and frames with transoms. * Door frames will be a heavy duty 14 gauge galvanized frame with a 4" profile. * New doors will be heavy duty 16 gauge galvanized steel. * Furnish and install new glass in transoms and doors. * Doors will have half glass window kits, continuous hinges, exit devices, locks, handles, closures, weather stripping thresholds, and sweeps. * Paint new doors and frames. * Clean area and remove all debris. * Door ways shall meet
WAGE DETERMINATION The bidders shall conform to the latest Davis-Bacon prevailing wage rate decisions for the area. (See the attached wage rate) General Decision Number: AR140132
CARPENTER, Includes Acoustical Ceiling Installation, Batt Insulation, Drywall Hanging, Form Work, and Metal Stud Installation.
Link/URL: https://www.fbo.gov/spg/DOL/ETA/LRJC1/LR-SOW-LRJC14-003/listing.html
| Copyright: | (c) 2013 Federal Information & News Dispatch, Inc. |
| Wordcount: | 1034 |



Combine Solicitation – CGC HAMMER LEAD BALLAST & LEAD ABATEMENT IAW SOW
Advisor News
- What advisors think about pooled employer plans, alternative investments
- AI, stablecoins and private market expansion may reshape financial services by 2030
- Cheers to summer, and planning for what comes next
- Why seniors fear spending their own retirement wealth
- The McEwen Group Merges with Prairie Wealth Advisors to Form Billion Dollar RIA
More Advisor NewsAnnuity News
- AuguStar Retirement launches StarStream Variable Annuity
- Prismic Life Announces Completion of Oversubscribed Capital Raise
- Guaranteed income streams help preserve assets later in retirement
- MassMutual turns 175, Marking Generations of Delivering on its Commitments
- ALIRT Insurance Research: U.S. Life Insurance Industry In Transition
More Annuity NewsHealth/Employee Benefits News
- Providence to end most health insurance plans, forcing hundreds of thousands in Oregon to switch
- Flemington-Raritan Seeking Assistance From State Regarding Rising Health Insurance Costs
- Mandela Barnes proposes blocking use of AI to boost consumer prices
- NCOIL adopts Individual Coverage Health Reimbursement Arrangement Model Act
- All about AHCCCS: Navigating Arizona Medicaid’s changing landscape
More Health/Employee Benefits NewsLife Insurance News
- AI, stablecoins and private market expansion may reshape financial services by 2030
- Transgender plaintiffs win preliminary victories in three gender-affirming care lawsuits
- AM Best Upgrades Issuer Credit Rating of Southern Farm Bureau Life Insurance Company
- Industry Innovator Scores New High-Water Mark: Reliance Matrix Logs 8 Millionth Employee Benefit/Absence Claim
- $150M+ asset sale payout distributed to Greg Lindberg policyholders
More Life Insurance News