Residents criticize Fayetteville for delays on storm drainage upgrades
From her front porch, a terrified Wilkes saw her trash cart float away and water from the open channel creep toward her brick home.
"You just feel so helpless," said Wilkes, who moved into the
Wilkes said she didn't realize the extent of the flooding problem before she bought her home on
She also didn't know that 17-year-old
In 2010, according to public records obtained by
"The city of
Today, one phase has been built, with the second to get started this summer. The third phase, which would improve the
The project is part of a stormwater capital-improvement plan totaling
The council is awaiting a staff proposal some time this year for a long-term capital plan and funding strategy to upgrade undersized, failing or nonexistent storm drainage systems in neighborhoods across the city.
It's a mammoth undertaking, one that city officials say will easily exceed
But some residents, such as Wilkes, say they feel unprotected, that the city has been asleep at the wheel. They say storm water is an important issue, even if it gets lost in the headlines about a new downtown ballpark or a
"I bet you if it had been a city councilman's or the mayor's son, that would have been taken care of right away," said Wilkes, a 53-year-old sewing instructor.
Most council members defend the city's record on storm water. They say new development -- and the rooftops and paved parking lots that come with it -- has exacerbated the neighborhood problems. And they say climate change and the recent trend of above-average rainfall haven't helped, either.
"I think the criticism is somewhat unfair," said
Wright cited the completion of two watershed drainage basin studies -- Buckhead and Branson creeks -- that identified about
The city has 13 more drainage basins that have not been studied.
After each study, improvement projects are identified, but each one then must be designed before it can be constructed. The studies, designs and construction are prioritized into a five-year capital plan that is updated annually.
The next basin study planned for this year is labeled
Improvements sought
Wilkes has been lobbying city officials for several years to improve the culvert next to her home, which was built in 1964 in a neighborhood behind the
Just when Wilkes gets a council member to appreciate the problem, she said, she gets a new district representative.
"It leads to neglect; then you have to go through with the whole spiel with a brand new person," she said.
Other residents with drainage problems who were interviewed for this story say the city is not moving fast enough to fix aging infrastructure.
"I am very disappointed and disgusted," said Boney, who has been battling with the city over the issue since she moved there in 2000.
"It's just not adequate," Stone said last week of that area's drainage system.
"And yes, it is on our radar but not in this current funding model," Stone said, referring to the city's stormwater capital plan through 2021.
Stone said Matthew not only emphasized the problem areas, but revealed new ones. However, retrofitting older neighborhoods is an expensive and time-consuming process, he said.
In many cases, the city inherited the problems, after annexing neighborhoods built in the county under more lax standards. It's a familiar theme of annexed subdivisions that also lack sidewalks, sanitary sewer and green space. In some ways, the city is playing catchup, because the state prevented it from involuntary annexations until 1983, while many areas of
While the capital plan aims to fix the past, the city's stormwater ordinance that took effect in 2009 looks toward the future. It requires "wet" and "dry" ponds, among other techniques, that slow the volume of storm runoff from leaving a piece of property after it has been developed.
Fee hike
Three years ago, the city unveiled a plan to raise the stormwater fee over five years, by a total of
The city raised it in 2014 and again the following year, but stopped last year. The current stormwater capital plan of
Councilman
"It's a problem, and it's going to become more of a problem," he said. "If we continue to take this stance of do nothing, it's just going to get worse."
Last year, the council was bitterly divided 5-5 on whether to raise the fee. Some said an increase that small would not begin to address the problem, while others insisted anything would be an improvement.
The divisiveness was reportedly one of the grievances against former City Manager
Voting last March to oppose another storm water increase were Mayor
The five supporting the increase were Wright, McDougald,
Last year's deferral, Stone said, "basically took
Fifteen stormwater projects are under design and two are under construction, ranging in cost from
Some on the council say another fee hike is premature until staff returns with a master plan. Arp said the city's focus now should be on repairing the damaged roads and bridges from Hurricane Matthew and getting reimbursed from the federal government and the state.
Robertson said it would be "fiscally irresponsible for me to vote to raise the stormwater fees when we don't have a master plan prioritizing the projects, or have a good idea of how our investment will help the residents."
He said anybody who lives in a low-lying area or creek, whether here or anywhere in the state, "your home may flood, if it rains really hard.
"There is only so much the government can do to help, but we are working on it," he said.
"There is not a magic bullet that fixes this problem," Stone said.
Crisp, a five-term councilman, described storm water as "one of the largest problems facing us today," but he opposed last year's
"We've had a number of things that have eaten our lunch," Crisp said. "We had
City Manager
Stone, who began working for the city 14 months ago, said he was unfamiliar with the history of the three-phase
The final phase -- it's set for design and construction in fiscal 2020 -- would upgrade the drainage pipe where the 17-year-old drowned over a decade ago.
The other phases must be done first, Stone said.
"You can fix a spot, but you may move the problem somewhere else," Stone said.
The city reprioritizes the list of projects ever few years, especially after another basin study is done, Stone said. Among the criteria for setting priorities are potential for injury or loss of life, number of properties affected, and the amount of property damage the flooding is causing.
"There's damage to my house now that I can't fix, because it's going to flood again," Wilkes said.
But she longs to return to her home. She liked the subdivision, she said. It has plenty of trees, chirping birds and a nearby park.
"And we just loved this neighborhood," she said. "It's so quiet. It's so sweet."
Staff writer
___
(c)2017 The Fayetteville Observer (Fayetteville, N.C.)
Visit The Fayetteville Observer (Fayetteville, N.C.) at www.fayobserver.com
Distributed by Tribune Content Agency, LLC.


Fed-up homeowner files report with city seeking compensation from Hurricane Matthew
‘Limited’ expansion of Medicaid moves ahead
Advisor News
- Gen X and millennials seek new retirement model
- Are families ready for the costs of aging at home?
- When a client moves, their insurance plan needs to move, too
- A rising retirement challenge: The license to spend
- Financial stress leaves less room for retirement saving
More Advisor NewsAnnuity News
- Gen X and millennials seek new retirement model
- Global Atlantic names Dan Farrelly head of IMO and IBD channels
- A rising retirement challenge: The license to spend
- What lower interest rates mean to annuity payouts
- AM Best downgrades A-Cap insurers amid financial and regulatory troubles
More Annuity NewsHealth/Employee Benefits News
Life Insurance News