EPA Administrator Wheeler Wraps Up Visit to Wisconsin Highlighting Trump Administration's Superfund Cleanup Progress, Water Infrastructure Investment
Today,
"
"Today really showcased the breadth of work
The Fox River Superfund Site is one of the largest Superfund sediment projects ever completed in the
"
In 2019,
This settlement was part of the over
Additionally, the agreement requires the
While at the Fox River Superfund Site, Administrator Wheeler announced (LINK) the ninth updated to the Administrator's Emphasis List of Superfund Sites Targeted for Immediate, Intense Action (Administrator's Emphasis List). In this latest update, the Quendall Terminals site in
Building on the
Since the creation of the Administrator's Emphasis List in 2017, 20 sites have been removed from the list after achieving critical milestones that furthered site cleanup or solved issues slowing the pace of cleanups. With this update, there are a total of 14 Superfund sites on the Administrator's Emphasis List.
At the
"Today is the result of years of work from folks across
This WIFIA loan marks the 26th under
"
"WIFIA loans have very low interest rates and also allow us to repay the loans over 38 years. That means that future users will share in the costs of this historic investment in critical infrastructure, lowering costs for our current customers," said Waukesha Water Utility General Manager
Yesterday, Administrator Wheeler kicked off his visit to
* * *
To view Superfund Report, click here: https://semspub.epa.gov/work/HQ/100002479.pdf
Telehealth’s Risks To Physicians and Patients Examined In White Paper
Fed Policy Didn’t Cause Racial Inequality And Can’t Do Much To Cure It
Advisor News
Annuity News
Health/Employee Benefits News
Life Insurance News