Combine Solicitation – NOAA TWIN OTTER EMMA INSPECTIONS AND OTHER MAINTENANCE HYANNIS, MA
Federal Information & News Dispatch, Inc. |
Notice Type: Combine Solicitation
Posted Date:
Office Address:
Subject: NOAA TWIN OTTER EMMA INSPECTIONS AND OTHER MAINTENANCE
Classification Code: J - Maintenance, repair & rebuilding of equipment
Solicitation Number: NMAN6000-14-00567
Contact: Ronald F Anielak, Contract Specialist, Phone 816-426-2115, Fax 816-274-6951, Email [email protected] -
Setaside: Total Small BusinessTotal Small Business
Place of Performance Country: US
Description:
Eastern Region Acquisition Division-KC
This is a combined synopsis/solicitation for commercial services prepared and processed in accordance with the Federal Acquisition Regulations (FAR) Part 12.6 as supplemented with additional information included in this notice. This is a solicitation from the
This notice is hereby issued as RFQ No. NMAN6000-14-00567. This RFQ and the following incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2005-72.
CLAUSES AND PROVISIONS
The FAR and CAR clauses incorporated into this acquisition are: 52.203-3 Gratuities (
FAR clauses and provisions are available on the internet website: http://www.acquisition.gov/far.
CAR clauses and provisions are available on the internet website: http://oam.ocs.doc.gov/CAPPS_car.html
STATEMENT OF WORK: See attachment
SCHEDULE OF PRICES: This is an order for commercial services. The lines item will be quoted and completed in accordance with the terms and conditions and statement of work specified herein including warranty for all work and parts. The resultant contract will be subject to the
BASE YEAR - Twelve months following date of award. LINE ITEM 0001: STANDARD EMMA INSPECTIONS including parts and labor. Refer to details in A.2 of Statement of Work.
Quantity: 2 Unit: EA Unit Price $____________ Total Price $_________________
LINE ITEM 0002: OVER AND ABOVE ITEMS FROM EMMA INSPECTION AS WELL AS ANY OTHER UNSCHEDULED MAINTENANCE, REPAIRS, UPGRADES, AND INSPECTIONS - PARTS AND LABOR. (Per A.3 of Statement of Work) This CLIN is on a time and materials basis. A Not- to-Exceed (NTE) amount will be determined by the Government at time of award. Contractor exceeds that amount determined at time of award at its own risk. This line item is not guaranteed. Any remaining balance of funds on this line item shall be de-obligated at end of performance period.
LOADED LABOR RATE PER HOUR (Regular rate) $_____________ LOADED LABOR RATE PER HOUR (Overtime rate) $_______________ NEW PARTS ______% MARKUP FROM COST OVERHAULED PARTS ______% MARKUP FROM COST SUPPLIES/CONSUMABLES _____% MARKUP FROM COST
LINE ITEM 0003: OPTION ITEM - STANDARD EMMA INSPECTION including parts and labor. Refer to details in A.2 of Statement of Work. If a third inspection is required, a formal modification will be issued to award this option item and to obligate the funds.
Quantity: 1 Unit: EA Price $____________
OPTION YEAR 1 - twelve months following end of Base Year. LINE ITEM 0004: STANDARD EMMA INSPECTIONS including parts and labor. Refer to details in A.2 of Statement of Work.
Quantity: 2 Unit: EA Unit Price $____________ Total Price $_________________
LINE ITEM 0005: OVER AND ABOVE ITEMS FROM EMMA INSPECTION AS WELL AS ANY OTHER UNSCHEDULED MAINTENANCE, REPAIRS, UPGRADES, AND INSPECTIONS - PARTS AND LABOR. (Per A.3 of Statement of Work) This CLIN is on a time and materials basis. A Not- to-Exceed (NTE) amount will be determined by the Government at time of award. Contractor exceeds that amount determined at time of award at its own risk. This line item is not guaranteed. Any remaining balance of funds on this line item shall be de-obligated at end of performance period.
LOADED LABOR RATE PER HOUR (Regular rate) $_______________ LOADED LABOR RATE PER HOUR (Overtime rate) $_______________ NEW PARTS ______% MARKUP FROM COST OVERHAULED PARTS ______% MARKUP FROM COST SUPPLIES/CONSUMABLES _____% MARKUP FROM COST
LINE ITEM 0006: OPTION ITEM-STANDARD EMMA INSPECTION including parts and labor. Refer to details in A.2 of Statement of Work. If a third inspection is required, a formal modification will be issued to award this option item and to obligate the funds.
Quantity: 1 Unit: EA Price $____________
OPTION YEAR 2 - Twelve months following end of Option Year 1. LINE ITEM 0007: STANDARD EMMA INSPECTION including parts and labor. Refer to details in A.2 of Statement of Work.
Quantity: 2 Unit: EA Unit Price $____________ Total Price $_________________
LINE ITEM 0008: OVER AND ABOVE ITEMS FROM EMMA INSPECTION AS WELL AS ANY OTHER UNSCHEDULED MAINTENANCE, REPAIRS, UPGRADES, AND INSPECTIONS - PARTS AND LABOR. (Per A.3 of Statement of Work) This CLIN is on a time and materials basis. A Not- to-Exceed (NTE) amount will be determined by the Government at time of award. Contractor exceeds that amount determined at time of award at its own risk. This line item is not guaranteed. Any remaining balance of funds on this line item shall be de-obligated at end of performance period.
LOADED LABOR RATE PER HOUR (Regular rate) $_______________ LOADED LABOR RATE PER HOUR (Overtime rate) $_______________ NEW PARTS ______% MARKUP FROM COST OVERHAULED PARTS ______% MARKUP FROM COST SUPPLIES/CONSUMABLES _____% MARKUP FROM COST
LINE ITEM 0009: OPTION ITEM - STANDARD EMMA INSPECTION including parts and labor. Refer to details in A.2 of Statement of Work. If a third inspection is required, a formal modification will be issued to award this option item and to obligate the funds.
Quantity: 1 Unit: EA Price $____________
OPTION YEAR 3 - Twelve months following end of Option Year 2. LINE ITEM 0010: STANDARD EMMA INSPECTION including parts and labor. Refer to details in A.2 of Statement of Work.
Quantity: 2 Unit: EA Unit Price $____________ Total Price $_________________
LINE ITEM 0011: OVER AND ABOVE ITEMS FROM EMMA INSPECTION AS WELL AS ANY OTHER UNSCHEDULED MAINTENANCE, REPAIRS, UPGRADES, AND INSPECTIONS - PARTS AND LABOR. (Per A.3 of Statement of Work) This CLIN is on a time and materials basis. A Not- to-Exceed (NTE) amount will be determined by the Government at time of award. Contractor exceeds that amount determined at time of award at its own risk. This line item is not guaranteed. Any remaining balance of funds on this line item shall be de-obligated at end of performance period.
LOADED LABOR RATE PER HOUR (Regular rate) $_______________ LOADED LABOR RATE PER HOUR (Overtime rate) $_______________ NEW PARTS ______% MARKUP FROM COST OVERHAULED PARTS ______% MARKUP FROM COST SUPPLIES/CONSUMABLES _____% MARKUP FROM COST
LINE ITEM 0012: OPTION ITEM - STANDARD EMMA INSPECTION including parts and labor. Refer to details in A.2 of Statement of Work. If a third inspection is required, a formal modification will be issued to award this option item and to obligate the funds.
Quantity: 1 Unit: EA Price $____________
OPTION YEAR 4 -Twelve months following end of Option year 4. LINE ITEM 0013: STANDARD EMMA INSPECTION including parts and labor. Refer to details in A.2 of Statement of Work.
Quantity: 2 Unit: EA Unit Price $____________ Total Price $_________________
LINE ITEM 0014: OVER AND ABOVE ITEMS FROM EMMA INSPECTION AS WELL AS ANY OTHER UNSCHEDULED MAINTENANCE, REPAIRS, UPGRADES, AND INSPECTIONS - PARTS AND LABOR. (Per A.3 of Statement of Work) This CLIN is on a time and materials basis. A Not- to-Exceed (NTE) amount will be determined by the Government at time of award. Contractor exceeds that amount determined at time of award at its own risk. This line item is not guaranteed. Any remaining balance of funds on this line item shall be de-obligated at end of performance period.
LOADED LABOR RATE PER HOUR (Regular rate) $_______________ LOADED LABOR RATE PER HOUR (Overtime rate) $_______________ NEW PARTS ______% MARKUP FROM COST OVERHAULED PARTS ______% MARKUP FROM COST SUPPLIES/CONSUMABLES _____% MARKUP FROM COST
LINE ITEM 0015: OPTION ITEM - STANDARD EMMA INSPECTION including parts and labor. Refer to details in A.2 of Statement of Work. If a third inspection is required, a formal modification will be issued to award this option item and to obligate the funds.
Quantity: 1 Unit: EA Price $____________
RFQ SUBMISSION
Signed and dated quotes must be submitted. Quotes shall be received on or before
The evaluation of quotes will be conducted as a commercial item acquisition in accordance with Federal Acquisition Regulation Part 12. The evaluation of quotes shall be based on the quoter responsiveness to the items listed, quoters price proposal, and the quoters ability to exhibit an understanding of the requirements included in this RFQ and the following technical evaluation factors. MINIMUM TECHNICAL FACTORS (GO-NO GO): 1) Quoter shall provide a copy of its FAA Repair Station Certificate or Canadian AMO Center Certificate covering Twin Otter DHC-6-300 aircraft; 2) Quoter shall provide Proof of Insurance documentation equal to or greater than
Link/URL: https://www.fbo.gov/spg/DOC/NOAA/CASC/NMAN6000-14-00567/listing.html
Copyright: | (c) 2013 Federal Information & News Dispatch, Inc. |
Wordcount: | 2453 |
Combine Solicitation – ARCHITECT/ENGINEER SERVICES WESTERN PENNSYLVANIA
Advisor News
Annuity News
Health/Employee Benefits News
Life Insurance News