R.E. Ginna Nuclear Power Plant, LLC; Exelon Generation Company, LLC (R.E. Ginna Nuclear Power Plant); Order Approving Direct Transfer of License and…
Federal Information & News Dispatch, Inc. |
Citation: "79 FR 18324"
Document Number: "NRC-2013-0252; Docket No. 50-244; License No. DPR-18"
"Notices"
I
R.E. Ginna Nuclear Power Plant, LLC (
II
By application dated
Approval of the direct transfer of the renewed facility operating license and the conforming amendment was requested by the applicants pursuant to Sections 50.80 and 50.90 of Title 10 of the Code of Federal Regulations (10 CFR). A notice entitled, "Consideration of Approval of Transfer of Renewed Facility Operating Licenses, Materials Licenses, and Conforming Amendments Containing Sensitive Unclassified Non-Safeguards Information," was published in the
Pursuant to 10 CFR 50.80, no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the NRC shall give its consent in writing. Upon review of the information in the application, and other information before the Commission, the NRC staff has determined that
The findings set forth above are supported by the NRC staff's safety evaluation dated the same day as this Order.
III
Accordingly, pursuant to Sections 161b, 161i, 161o, and 184 of the Act, 42 U.S.C. Sections 2201(b), 2201(i), 2201(o), and 2234; and 10 CFR 50.80, it is hereby ordered that the direct license transfer of the operating authority of the license from the licensee to
1. The existing E.D.F. International
2.
3.
4. Within 14 days of the license transfers,
5. Within 10 days of the license transfers,
6. At least half the members of the CENG Board of Directors must be U.S. citizens.
7. The CENG Chief Executive Officer, Chief Nuclear Officer, and Chairman of the CENG Board of Directors must be U.S. citizens. These individuals shall have the responsibility and exclusive authority to ensure and shall ensure that the business and activities of CENG with respect to the facility's license are at all times conducted in a manner consistent with the public health and safety and common defense and security of
8. CENG will retain its
9. The NAC shall prepare an annual report regarding the status of foreign ownership, control, or domination of the licensed activities of power reactors under the control, in whole or part, of CENG. The NAC report shall be submitted to the NRC within 30 days of completion, or by
10. Before completion of the direct transfer of the facility's license,
It is further ordered that consistent with 10 CFR 2.1315(b), the license amendment that makes changes, as indicated in Enclosure 2 to the cover letter forwarding this Order, to conform the license to reflect the subject direct transfer, is approved. The license amendment shall be issued and made effective at the time the proposed direct transfer action is consummated.
It is further ordered that after receipt of all required regulatory approvals for the proposed direct transfer action, CENG shall inform the Director of the
This Order is effective upon issuance.
For further details with respect to this Order, see the application and the non- proprietary safety evaluation dated the same date as this Order, which are available for public inspection at the
Dated at
For the
Director,
[FR Doc. 2014-07242 Filed 3-31-14;
BILLING CODE 7590-01-P
Copyright: | (c) 2014 Federal Information & News Dispatch, Inc. |